|
|
|
APPLICATION STUDY OF COMPLEX VALUE ENGINEERING IN OPTIMIZATION OF EXPRESSWAY TUNNEL CONSTRUCTION
|
|
|
|
|
Abstract Based on complex value engineering(CVE) theory and methods,the optimization methods on expressway tunnel construction and its CVE application model are firstly analyzed. Then the functions and costs and their relations are discussed. Thirdly,a case,the Kuigang tunnel of Meizhou—Heyuan expressway is systemically analyzed. Through application,the construction period is drastically shortened,and its cost is reduced while keeping its construction quality.
|
|
Received: 27 May 2006
|
|
|
|
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|