CHALLENGE ISSUES IN CONSTRUCTION AND PROJECT OF LARGE-SCALE DEEP-BURIED TUNNEL GROUP OF JINPING II HYDROPOWER STATION
(Ertan Hydropower Development Co.,Ltd.,Chengdu,Sichuan 610051,China)
Download: PDF (519 KB)   HTML (1 KB) 
Export: BibTeX | EndNote (RIS)      
Abstract  Jinping II hydropower station includes four diversion tunnels,two auxiliary tunnels and one drainage tunnel,with a total tunnel length of 118 km. These tunnels are characterized as thick overburden,long length,large size in diameter,high geostress,complicated engineering geological conditions and high difficulty for project layout,which make the tunnel project the largest and most difficult hydro-tunnel group in the world. Key technical problems were met during the tunnels excavation,including the forecast and treatment of groundwater,and the prevention of rock burst. The studies and measures adopted against rock burst,the gushing water and the instability of surrounding rock mass during the construction of tunnels are summarized. The experience accumulated during the construction of the tunnels in Jinping II hydropower station shall provide valuable reference for similar projects.
Key wordstunnelling engineering      Jinping II hydropower station      underground engineering      rock burst      groundwater     
Received: 28 May 2010     
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
Cite this article:   
URL:  
http://www.rockmech.org/EN/Y2010/V29/I11/2161
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号