| DETERMINATION METHOD OF SUPPORTING TIME FOR SECONDARY LINING IN TUNNEL CONSIDERING ROCK CREEP BEHAVIORS |
| WANG Zhongwen1,2,FANG Jianqin2,3,4,XIA Caichu3,4,BIAN Yuewei3,4,JIN Lei3,4 |
| (1. School of Civil Engineering and Mechanics,Huazhong University of Science and Technology,Wuhan,Hubei 430074,China;2. Guangdong Yunwu Expressway Co.,Ltd.,Yunfu,Guangdong 527300,China;3. Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;4. Key Laboratory of Geotechnical and Underground Engineering,Ministry of Education,Tongji University,Shanghai 200092,China) |
|
|
|
|
Abstract Tunnel deformation on the basis of rheological theory is discussed,followed by an exponential fitting of the field monitoring data. Three rheological parameters are then given. Using these three parameters,the appropriate supporting time of second lining is proposed according to the national specifications. Further more,the time of secondary lining in tunnels with different primary lining thicknesses as well as different excavation spans are given using these parameters.
|
|
Received: 25 December 2009
|
|
|
|
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|