Citation Search Quick Search
Artiles Current Issue | Archive | Adv Search |
DETERMINATION METHOD OF SUPPORTING TIME FOR SECONDARY LINING IN TUNNEL CONSIDERING ROCK CREEP BEHAVIORS
WANG Zhongwen1,2,FANG Jianqin2,3,4,XIA Caichu3,4,BIAN Yuewei3,4,JIN Lei3,4
(1. School of Civil Engineering and Mechanics,Huazhong University of Science and Technology,Wuhan,Hubei 430074,China;2. Guangdong Yunwu Expressway Co.,Ltd.,Yunfu,Guangdong 527300,China;3. Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;4. Key Laboratory of Geotechnical and Underground Engineering,Ministry of Education,Tongji University,Shanghai 200092,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号