[1] 中华人民共和国行业标准编写组. JTJ D70–2004公路隧道施工技术规范[S]. 北京:人民交通出版社,2004.(The Professional Standards Compilation Group of People¢s Republic of China. JTJ D70–2004 Code for design of road tunnel[S]. Beijing:China Communications Press,2004.(in Chinese))
[2] 戴会超. 三峡永久船闸高边坡安全监测[J]. 岩石力学与工程学报,2004,23(17):2 907–2 912.(DAI Huichao. Safety monitoring of high-rock slope of permanent shiplock of Three Gorges Project[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(17): 2 907–2 912.(in Chinese))
[3] 赵明华,刘小平,冯汉斌,等. 小湾电站高边坡的稳定性监测及分析[J]. 岩石力学与工程学报,2006,25(增1):2 746–2 750.(ZHAO Minghua,LIU Xiaoping,FENG Hanbin,et al. Monitoring and analysis of a high slope stability in Xiaowan hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(Supp.1):2 746–2 750.(in Chinese))
[4] 宋修广,张思峰,李英勇. 路堑高边坡动态监测与分析[J]. 岩土力学,2005,26(7):1 153–1 156.(SONG Xiuguang,ZHANG Sifeng,LI Yingyong. In-situ dynamic monitoring and analysis of high slope stability[J]. Rock and Soil Mechanics,2005,26(7):1 153–1 156.(in Chinese))
[5] 李 炼,陈从新,徐宜保,等. 露天矿边坡的位移监测与滑坡预报[J]. 岩土力学,1997,18(4):69–74.(LI Lian,CHEN Congxin,XU Yibao,et al. Displacement monitoring and landslide forecast on the rock slope of open-pit mine[J]. Rock and Soil Mechanics,1997,18(4):69–74.(in Chinese))
[6] 张 雷,沈明荣,石振明. 岩体边坡工程中的位移监测及分析[J]. 岩土力学,2003,24(增1):202–205.(ZHANG Lei,SHEN Mingrong,SHI Zhenming. Displacement supervision method for rock slope engineering and analysis[J]. Rock and Soil Mechanics,2003,24(Supp.1):202–205.(in Chinese))
[7] 张林洪,杨 柯. 边坡工程监测资料的稳定性判别和利用[J]. 岩石力学与工程学报,2000,19(增1):1 136–1 140.(ZHANG Linhong,YANG Ke. Stability judge and use of monitoring data in slope engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2000,19(Supp.1):1 136–1 140.(in Chinese))
[8] 黄润秋. 20世纪以来中国的大型滑坡及其发生机制[J]. 岩石力学与工程学报,2007,26(3):433–454.(HUANG Runqiu. Large-scale landslides and their sliging mechanisms in China since the 20th century[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(3):433–454.(in Chinese))
[9] 黄润秋,肖华波. 浅埋双连拱隧道围岩—边坡体系变形机制及稳定性分析[J]. 工程地质学报,2008,16(5):584–591.(HUANG Runqiu,XIAO Huabo. Deformation mechanism and stability study of system of surrounding rock and slope of shallow double-arch tunnel[J]. Journal of Engineering Geology,2008,16(5):584–591.(in Chinese))
[10] 贾明辉,王 民,丁文其,等. 不同进洞方式对隧道边坡稳定性影响的研究[J]. 公路,2007,(10):220–222.(JIA Minghui,WANG Min,DING Wenqi,et al. Study of influences of different excavating sequences on stability of tunnel slope[J]. Highway,2007,(10):220–222.(in Chinese))
[11] 王建秀,唐益群,朱合华,等. 连拱隧道边坡变形的三维监测分析[J]. 岩石力学与工程学报,2006,25(11):2 226–2 232.(WANG Jianxiu,TANG Yiqun,ZHU Hehua,et al. 3D monitoring and analysis of landslide deformation caused by twin-arch tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(11):2 226–2 232.(in Chinese))
[12] 李新星,朱合华,蔡永昌,等. 连拱隧道施工方法对边坡稳定性的影响分析[J]. 地下空间与工程学报,2007,3(3):483–487.(LI Xinxing,ZHU Hehua,CAI Yongchang,et al. Influence of construction method of the twin-tunnel on slope stability[J]. Chinese Journal of Underground Space and Engineering,2007,3(3):483–487.(in Chinese))
[13] 王国欣,谢雄耀,黄宏伟. 公路隧道洞口滑坡的机制分析及监控预报[J]. 岩石力学与工程学报,2006,25(2):268–274.(WANG Guoxin,XIE Xiongyao,HUANG Hongwei. Mechanism analysis and monitoring forecast of landslide at road tunnel face[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(2):268–274.(in Chinese))
[14] 贾明辉. 隧道洞口边坡稳定性与控制技术研究[硕士学位论文][D]. 上海:同济大学,2007.(JIA Minghui. Research on the slop stability and control technique at the tunnel entrance[M. S. Thesis][D]. Shanghai:Tongji University,2007.(in Chinese))