[1] 朱彦鹏,李 忠. 深基坑土钉支护稳定性分析方法的改进及软件开发[J]. 岩土工程学报,2005,27(8):939–943.(ZHU Yanpeng,LI Zhong. Improvement on stability analysis of soil nailing in foundation excavations and its software development[J]. Chinese Journal of Geotechnical Engineering,2005,27(8):939–943.(in Chinese))
[2] 董 诚,郑颖人,陈新颖,等. 深基坑土钉和预应力锚杆复合支护方式的探讨[J]. 岩土力学,2009,30(12):3 793–3 796,3 802. (DONG Cheng,ZHENG Yingren,CHEN Xinying,et al. Research on composite support pattern of soil nails and prestressed anchors in deep foundation pits[J]. Rock and Soil Mechanics,2009,30(12):3 793–3 796,3 802.(in Chinese))
[3] 贾金青,陈国周,孟祥波. 改进的杆系有限元在预应力锚杆柔性支护法中应用[J]. 岩土力学,2007,28(11):2 314–2 318.(JIA Jinqing,CHEN Guozhou,MENG Xiangbo. Application of modified beam- spring FEM to prestressed anchor flexible retaining wall[J]. Rock and Soil Mechanics,2007,28(11):2 314–2 318.(in Chinese))
[4] 周 勇,朱彦鹏. 黄土地区框架预应力锚杆支护结构设计参数的灵敏度分析[J]. 岩石力学与工程学报,2006,25(增 1):3 115–3 122. (ZHOU Yong,ZHU Yanpeng. Sensitivity analysis of design parameters of grillage supporting structure with prestressed anchor in loess slope[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(Supp.1):3 115–3 122.(in Chinese))
[5] 周 勇,朱彦鹏. 框架预应力锚杆边坡支护结构的稳定性分析方法及其应用[J]. 工程地质学报,2008,16(3):376–382.(ZHOU Yong,ZHU Yanpeng. Stability analysis method for prestressed anchor and grillage supporting structures and its application[J]. Journal of Engineering Geology,2008,16(3):376–382.(in Chinese))
[6] 陈少明,张俊伟. 从受弯作用计算土钉墙水平位移简化公式的探讨[J]. 水利与建筑工程学报,2009,7(4):153–155.(CHEN Shaoming,ZHANG Junwei. Discussion on simplified formula for calculating soil nail wall¢s horizontal displacement from bending effect[J]. Journal of Water Resources and Architectural Engineering,2009,7(4):153–155.(in Chinese))
[7] 高 盟,高广运,冯世进,等. 基坑开挖引起紧贴运营地铁车站的变形控制研究[J]. 岩土工程学报,2008,30(6):818–823.(GAO Meng,GAO Guangyun,FENG Shijin,et al. Control of deformation of operating subway station induced by adjacent deep excavation[J]. Chinese Journal of Geotechnical Engineering,2008,30(6):818–823.(in Chinese))
[8] 张百红,李国富,韩立军. 基坑土钉支护设计的简单算法研究[J]. 岩土力学,2008,29(11):3 041–3 046.(ZHANG Baihong,LI Guofu,HAN Lijun. Research on simple calculating method of designing foundation pit supporting by soil nailing[J]. Rock and Soil Mechanics,2008,29(11):3 041–3 046.(in Chinese))
[9] 耿建勋,张克绪,何 林,等. 基坑支护结构的实用计算方法及其应用[J]. 哈尔滨工程大学学报,2009,30(8):872–877.(GENG Jianxun,ZHANG Kexu,HE Lin,et al. Practical calculating method of retaining structures for excavation engineering and its application[J]. Journal of Harbin Engineering University,2009,30(8):872–877.(in Chinese))
[10] 杨育文. 黏土中土钉墙实例分析和变形评估[J]. 岩土工程学报,2009,31(9):1 427–1 433.(YANG Yuwen. Case study of soil nailing walls and estimation of their displacements[J]. Chinese Journal of Geotechnical Engineering,2009,31(9):1 427–1 433.(in Chinese))
[11] 严 薇,曾友谊,王维说. 深基坑桩锚支护结构变形和内力分析方法探讨[J]. 重庆大学学报,2008,31(3):344–348.(YAN Wei,ZENG Youyi,WANG Weishuo. Analytic method discussion on deformation and inner force of pile-anchor structure of deep excavation under construction[J]. Journal of Chongqing University,2008,31(3):344–348.(in Chinese))
[12] 吴志敏,屠毓敏. 土钉基坑支护的空间效应研究[J]. 岩土力学,2007,28(10):2 178–2 182.(WU Zhimin,TU Yumin. Space effect of soil-nailing excavation protection[J]. Rock and Soil Mechanics,2007,28(10):2 178–2 182.(in Chinese))
[13] 魏焕卫,杨 敏,孙剑平,等. 土钉墙变形规律及其相关性的实测研究[J]. 岩土力学,2009,30(6):1 753–1 758.(WEI Huanwei,YANG Min,SUN Jianping,et al. Deformation law and correlation of soil nailing wall based on measured data[J]. Rock and Soil Mechanics,2009,30(6):1 753–1 758.(in Chinese))
[14] 潘 泓,周陈发,曹 洪. 复合土钉墙的角部空间效应及变形性状分析[J]. 岩土力学,2008,29(2):333–336.(PAN Hong,ZHOU Chenfa,CAO Hong. Analysis of spatial effect and deformation of corner of composite soil nailing walls[J]. Rock and Soil Mechanics,2008,29(2):333–336.(in Chinese))
[15] 聂庆科,胡建敏,吴 刚. 深基坑双排桩支护结构上的变形和土压力研究[J]. 岩土力学,2008,29(11):3 089–3 094.(NIE Qingke,HU Jianmin,WU Gang. Deformation and earth pressure of double- row piles retaining structure for deep excavation[J]. Rock and Soil Mechanics,2008,29(11):3 089–3 094.(in Chinese))
[16] 商卫东,聂庆科,白 冰,等. 深基坑开挖过程及空间效应影响的数值模拟[J]. 探矿工程(岩土钻掘工程),2009,(1):34–37.(SHANG Weidong,NIE Qingke,BAI Bing,et al. Numerical Simulation of space effect and excavation process for deep foundation[J]. Exploration Engineering(Rock and Soil Drilling and Tunneling),2009,(1):34–37.(in Chinese))
[17] 中华人民共和国国家标准编写组. GB50330–2002 建筑边坡工程技术规范[S]. 北京:中国建筑工业出版社,2002.(The National Standards Compilation Group of People¢s Republic of China. GB50330–2002 Technical code for building slope engineering[S]. Beijing:China Architecture and Building Press,2002.(in Chinese))
[18] 兰州理工大学. 深基坑支护结构设计软件V1.0[P]. 兰州:2005SR03956,2005.(Lanzhou University of Technology. Software V1.0 for supporting structural design of deep excavations[P]. Lanzhou:2005SR03956,2005.(in Chinese))
[19] 周 勇. 框架预应力锚杆柔性支护结构的理论分析与试验研究[博士学位论文][D]. 兰州:兰州理工大学,2007.(ZHOU Yong. Theoretical analysis and testing study for grillage flexible supporting structure with prestressed anchors[Ph. D. Thesis][D]. Lanzhou:Lanzhou University of Technology,2007.(in Chinese))
[20] 中华人民共和国行业标准编写组. JGJ120–99 建筑基坑支护技术规程[S]. 北京:中国建筑工业出版社,1999.(The Professional Standard Compilation Group of People¢s Republic of China. JGJ120–99 Technical specification for retaining and protection of building foundation excavations[S]. Beijing:China Architecture and Building Press,1999.(in Chinese))
[21] 伍 俊,郑全平,吴祥云. 复合土钉支护技术的有限元数值模拟及工程应用[J]. 岩土工程学报,2005,27(4):388–392.(WU Jun,ZHENG Quanping,WU Xiangyun. FEM numerical simulation and engineering application of compound soil nail support technology[J]. Chinese Journal of Geotechnical Engineering,2005,27(4):388–392.(in Chinese))
[22] 安关峰,高峻岳. 广州地铁公园前地下空间深基坑综合支护监测分析[J]. 岩土工程学报,2007,29(6):872–879.(AN Guanfeng,GAO Junyue. Comprehensive analysis of deep foundation pits for underground space in Guangzhou[J]. Chinese Journal of Geotechnical Engineering,2007,29(6):872–879.(in Chinese))
[23] 熊智彪,王启云. 某复杂平面基坑支护结构水平位移监测及加固[J]. 岩土力学,2009,30(2):572–576.(XIONG Zhibiao,WANG Qiyun. Monitoring of horizontal displacements of support structure for a complicated planar foundation pit and its reinforcement[J]. Rock and Soil Mechanics,2009,30(2):572–576.(in Chinese))
[24] 唐孟雄. 基坑工程预应力锚索锚固力试验研究[J]. 岩石力学与工程学报,2007,26(6):1 158–1 163.(TANG Mengxiong. Test study on anchorage force of prestressed anchor cables for foundation pit[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(6): 1 158–1 163.(in Chinese))
[25] 刘晶晶,赵其华,彭社琴,等. 预应力锚索格构梁作用下边坡土中应力分布的室内模型试验研究[J]. 水文地质工程地质,2006,(4):9–12.(LIU Jingjing,ZHAO Qihua,PENG Sheqin,et al. On indoor model experiment of the action of prestressed anchor-rope and lattice beam on slope soil stress distribution[J]. Hydrogeology and Engineering Geology,2006,(4):9–12.(in Chinese))
[26] 范秋雁,陈 波,沈 冰. 考虑施工过程的基坑锚杆支护模型试验研究[J]. 岩土力学,2005,26(12):1 874–1 878.(FAN Qiuyan,CHEN Bo,SHEN Bing. Model test research of bolt supporting of foundation pit considering construction process[J]. Rock and Soil Mechanics,2005,26(12):1 874–1 878.(in Chinese))