[1] CHEN W F. Limit analysis and soil mechanics[M]. New York:Elsevier Scientific Publishing Company,1975.
[2] DONALD I,CHEN Z Y. Slope stability analysis by the upper bound approach:fundamentals and methods[J]. Canadian Geotechnical Journal,1997,34(6):853–862.
[3] 陈祖煜. 土力学经典问题的极限分析上、下限解[J]. 岩土工程学报,2002,24(1):1–11.(CHEN Zuyu. Limit analysis for the classic problems of soil mechanics[J]. Chinese Journal of Geotechnical Engineering,2002,24(1):1–11.(in Chinese))
[4] 陈祖煜. 土质边坡稳定分析——原理·方法·程序[M]. 北京:中国水利水电出版社,2003.(CHEN Zuyu. Soil slope stability analysis—theory,methods and program[M]. Beijing:China Water Power Press,2003.(in Chinese))
[5] DAVIS E H,GUNN M J,MAIR R J,et al. The stability of shallow buried tunnel s and underground openings in cohesive material[J]. Géotechnique,1980,30(4):397–416.
[6] OSMAN A S,MAIR R J,BOLTON M D. On the kinematics of 2D tunnel collapse in undrained clay[J]. Géotechnique,2006,56(9):585–595.
[7] KLAR A,OAMAN A S,BOLTON M. 2D and 3D upper bound solutions for tunnel excavation using “elastic” flow fields[J]. International Journal for Numerical and Analytical Methods in Geomechanics,2007,31(12):1 367–1 374
[8] VERRUIJT A,BOOKER J R. Surface settlements due to deformation of a tunnel in an elastic half plane[J]. Géotechnique,1996,46(4):753–756
[9] 谢 骏,刘纯贵,于海勇. 双平行圆形隧道稳定的塑性极限分析上限解[J]. 岩石力学与工程学报,2006,25(9):1 835–1 841.(XIE Jun,LIU Chungui,YU Haiyong. Upper bound solutions of plastic limit analysis for the stability of two parallel circular tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(9):1 835– 1 841.(in Chinese))
[10] 杨 峰,阳军生. 浅埋隧道围岩压力确定的极限分析方法[J]. 工程力学,2008,25(7):179–184.(YANG Feng,YANG Junsheng. Limit analysis method for determination of earth pressure on shallow buried tunnel[J]. Engineering Mechanics,2008,25(7):179–184.(in Chinese))
[11] SLOAN S W. Upper bound limit analysis using linen finite elements and linear programming[J]. International Journal for Nummerical and Analytical Methods in Geomechanics,1989,13:263–282.
[12] SLOAN S W,KLEEMAN P W. Upper bound limit analysis using discontinuous velocity fields[J]. Computer Methods in Applied Mechanics and Engineering,1995,127(1–4):293–314.
[13] 姜功良. 浅埋软土隧道稳定性极限分析[J]. 土木工程学报,1998,31(5):65–71.(JIANG Gongliang. Shallow buried tunnel stability limit analysis in soft soil ground[J]. Chinese Journal of Civil Engineering,1998,31(5):65–71.(in Chinese))
[14] SLOAN S W,ASSADI A. Undrained stability of a square tunnel in a soil whose strength increases linearly with depth[J]. Computer and Geotechnics,1991,12(4):321–346.
[15] WILSON D W,ABBO A J,SLOAN S W,et al. Undrained stability of dual square tunnels[C]// Proceedings of the 12th International Conference of International Association for Computer Methods and Advances in Geomechanics. Goa:[s. n.],2008:4 284–4 291.
[16] BROMS B B,BENNERMARK H. Stability of clay at vertical openings[J]. Journal of the Soil Mechanics and Foundations Division,1967,93:71–94.