Citation Search Quick Search
  2010, Vol. 29 Issue (S2): 4033-4037    DOI:
Artiles Current Issue | Archive | Adv Search |
EXPERIMENTAL STUDY OF SETTLEMENT-TIME REGULARITY OF POST GROUTING PILE GROUP FOUNDATION DURING CONSTRUCTION PERIOD
ZOU Li1,WU Xingxu1,MA Jianlin1,PENG Shengying2
(1. Department of Civil Engineering,Southwest Jiaotong University,Chengdu,Sichuan 610031,China; 2. Beijing—Shanghai High-speed Railway Co.,Ltd.,Beijing 100038,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号