Citation Search Quick Search
  2011, Vol. 30 Issue (1): 149-154    DOI:
Artiles Current Issue | Archive | Adv Search |
STUDY OF TBM CONSTRUCTION OF DIVERSION TUNNEL FOR JINPING II HYDROPOWER STATION
(1. School of Water Resources and Hydropower,Wuhan University,Wuhan,Hubei 430072,China;2. Ertan Hydropower Development Company,Ltd.,Chengdu,Sichuan 610051,China;3. East China Investigation and Design Institute,China Hydropower Engineering Consulting Group Co.,Hangzhou,Zhejiang 310014,China;4. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan,Hubei 430071,China;5. Key Laboratory of Urban Security and Disaster Engineering of Ministry of Education,Beijing University of Technology,
Beijing 100124,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号