| CHARACTERISTICS ANALYSES OF DEFORMATION AND FAILURE ON TUNNEL SURROUNDING ROCK BASED ON FINE DESCRIPTION OF JOINTS |
| XU Chongbang1,2,3,XIA Caichu2,CHEN Xiaoxiang2 |
XU Chongbang1,2,3,XIA Caichu2,CHEN Xiaoxiang2
(1. Research Institute of Highway,Ministry of Transport,Beijing 100088,China;2. Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;3. Department of Civil Engineering,Tsinghua University,Beijing 100084,China) |
|
|
|
|
Abstract Jinjishan tunnel in the second stage of Fuzhou airport expressway project is the first multi-arch tunnel with bidirectional eight-lane in China. There were developed joints and crushed rock in tunnel surrounding rock,and the characteristics of joint distribution had significant effect on the stability of tunnel surrounding rock. This paper collected the data of joints in several cross-sections of mid-drift and other outcrop areas of the tunnel,and predicted joints distribution of the main tunnel by using statistical analysis method. On the basis of this,the paper made simulation calculation for the deformation and failure process of the tunnel surrounding rock with the method of discontinuous deformation analysis(DDA). Meanwhile,it divided the typical stages of the deformation and failure process for the tunnel,and also indicated the most possible damaged parts. At last,the paper made a comparison between the result of DDA calculation and practical collapse of Jinjishan tunnel,which were almost the same. Therefore,it is shown that the DDA method is capable of analyzing the stability;and it has good application prospect of stability analysis for tunnel surrounding rock.
|
|
Received: 17 May 2011
|
|
|
|
| [1] 蒋爵光,李巂蓬,钱惠国,等. 不同产状节理岩体隧道围岩稳定性的模型试验研究[J]. 水文地质工程地质,1984,(5):13–19.(JIANG Jueguang,LI Xipeng,QIAN Huiguo,et al. Scale model study of stability of tunnels in different occurrence jointed rocks[J]. Hydrogeology and Engineering Geology,1984,(5):13–19.(in Chinese))
[2] 宋选民,顾铁凤,柳崇伟. 受贯通裂隙控制岩体巷道稳定性试验研究[J]. 岩石力学与工程学报,2002,21(12):1 781–1 785.(SONG Xuanmin,GU Tiefeng,LIU Chongwei. Experimental study on roadway stability in rock mass with connected fissures[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(12):1 781–1 785.(in Chinese))
[3] 刘 刚,赵 坚,宋宏伟,等. 断续节理方位对巷道稳定性的影响[J]. 煤炭学报 2008,33(8):860–865.(LIU Gang,ZHAO Jian,SONG Hongwei,et al. Influence of intermittent joint orientation on roadway stability[J]. Journal of China Coal Society,2008,33(8):860–865.(in Chinese))
[4] 张秀丽,焦玉勇,刘泉声,等. 用改进的DDA方法模拟公路隧道的稳定性[J]. 岩土力学,2007,28(8):1 710–1 713.(ZHANG Xiuli,JIAO Yuyong,LIU Quansheng,et al. Modeling of stability of a highway tunnel by using improved DDA method[J]. Rock and Soil Mechanics,2007,28(8):1 710–1 713.(in Chinese))
[5] ZHANG X L,JIAO Y Y,ZHAO J. Simulation of failure process of jointed rock[J]. Journal of Central South University of Technology,2008,15(6):888–894.
[6] 吴顺川,周 喻,高利立,等. 等效岩体技术在岩体工程中的应用[J]. 岩石力学与工程学报,2010,29(7):1 435–1 441.(WU Shunchuan,ZHOU Yu,GAO Lili,et al. Application of equivalent rock mass technique to rock mass engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(7):1 435–1 441.(in Chinese))
[7] 段艳燕,宋宏伟,赵 坚,等. 岩体非连续结构面对隧道稳定性影响的数值模拟[J]. 岩土工程界,2004,7(9):34–36.(DUAN Yanyan,SONG Hongwei,ZHAO Jian,et al. Simulation of the influence of discontinuities in rock mass on tunnel stability[J]. Geotechnical Engineering World,2004,7(9):34–36.(in Chinese))
[8] 李仲奎,周 钟,汤雪峰,等. 锦屏一级水电站地下厂房洞室群稳定性分析与思考[J]. 岩石力学与工程学报,2009,28(11):2 167–2 175.(LI Zhongkui,ZHOU Zhong,TANG Xuefeng,et al. Stability analysis and considerations of underground powerhouse caverns group of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(11):2 167–2 175.(in Chinese))
[9] 福建省交通规划设计院. 福州长乐国际机场高速公路二期工程A6合同段金鸡山隧道工程地质评价报告[R]. 福州:福建省交通规划设计院,2007.(Fujian Communications Planning and Design Institute. The geological evaluation report of Jinjishan tunnel in project of Fuzhou airport highway construction[R]. Fuzhou:Fujian Communications Planning and Design Institute,2007.(in Chinese))
[10] 华安增,张子新. 层状非连续岩体稳定学[M]. 北京:中国矿业大学出版社,1998:78–82.(HUA Anzeng,ZHANG Zixin. Disciplines of stratified discontinuous rock mass[M]. Beijing:China University of Mining and Technology Press,1998:78–82.(in Chinese))
[11] 陈剑平,KULATILAKE P H S W. 岩体结构统计均质区的划分[J]. 地质灾害与环境保护,1996,7(1):19–24.(CHEN Jianping,KULATILAKE P H S W. Evaluation of statistical homogeneity of rock mass structure[J]. Journal of Geological Hazards and Environment Preservation,1996,7(1):19–24.(in Chinese))
[12] 董大钧. SAS统计分析[M]. 沈阳:辽宁科学技术出版社,1996:102–116.(DONG Dajun. SAS statistical analysis[M]. Shenyang:Liaoning Science and Technology Publishing House,1996:102–116.(in Chinese))
[13] 夏才初,陈孝湘,许崇帮,等. 特大跨度连拱隧道岩体节理的精细化描述及其块体稳定性分析[J]. 岩石力学与工程学报,2010,29(增1):2 598–2 603.(XIA Caichu,CHEN Xiaoxiang,XU Chongbang,et al. Fine description of rock joint combined with block theory and its applications to extra-large cross-section multiple-arch tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(Supp.1):2 598–2 603.(in Chinese))
[14] 石根华. 数值流形方法与非连续变形分析[M]. 裴觉民译. 北京:清华大学出版社,1997:56–62.(SHI Genhua. Numerical manifold method(NMM) and discontinuous deformation analysis(DDA)[M]. Translated by PEI Juemin. Beijing:Tsinghua University Press,1997:56–62.(in Chinese))
[15] SHI G H. Discontinuous deformation analysis—a new model for the statics and dynamics of block systems[Ph. D. Thesis][D]. Berkley:Department of Civil Engineering,University of California,1988.
[16] 许崇帮,夏才初,朱合华. 双向八车道连拱隧道施工方案优化分析[J]. 岩石力学与工程学报,2009,28(1):17–26.(XU Chongbang,XIA Caichu,ZHU Hehua. Optimum analysis for construction scheme of multiple-arch tunnel with eight traffic lanes[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(1):17–26.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|