Abstract According to the cracks discovered in the embankment of Xiaowan arch dam,two functional cable models are built to simulate the stress field under the conditions of pulling of prestressed cable and secondary grouting. The feasibility of anchoring in the embankment,and the effects of anchoring on the stress around anchorage region and the performance of crack surfaces are studied by combining integer model and sub-model;and the effect of chemical grouting on reinforcing shear strength of cracks is analyzed. The results indicate that:the anchoring scheme of 400 t is superior to the 100 t;the maximum tensile stress around bonded length is about 0.2 MPa,which plus current stress may not cause new cracks. The anchoring and chemical grouting can enhance the shear capacity of crack surfaces to some extent;and its effect becomes distinct as the water level rising up. The compression shear yield zones in some cracks appear in the high water level,and large tonnage of anchoring or other measures are suggested to strengthen these areas.
|
|
Received: 10 December 2010
|
|
|
|
| [1] 付 敬,盛 谦. 高边坡预应力锚索加固的数值模拟分析[J]. 长江科学院院报,1996,13(3):52–55.(FU Jing,SHENG Qian. Numerical analysis of high slope reinforced with pretensioned tendons[J]. Journal of Yangtze River Scientific Research Institute,1996,13(3):52–55.(in Chinese))
[2] 肖 明. 地下洞室隐式锚杆柱单元的三维弹塑性有限元分析[J]. 岩土工程学报,1992,14(5):19–26.(XIAO Ming. 3D elastoplastic FE analysis of implicit cylindric anchor bar element for underground opening[J]. Chinese Journal of Geotechnical Engineering,1992,14(5):19–26.(in Chinese))
[3] 张强勇,向 文,朱维申. 三维加锚弹塑性损伤模型在溪洛渡地下厂房工程中的应用[J]. 计算力学学报,2000,17(4):475–482.(ZHANG Qiangyong,XIANG Wen,ZHU Weishen. Application of 3D elastoplastic damage model with bolts in Xiluodu underground power house[J]. Chinese Journal of Computational Mechanics,2000,17(4):475–482.(in Chinese))
[4] 朱杰兵,韩 军,程良奎,等. 三峡永久船闸预应力锚索加固对周边岩体力学性状影响的研究[J]. 岩石力学与工程学报,2002,21(6):853–857.(ZHU Jiebing,HAN Jun,CHENG Liangkui,et al. Research on rockmass properties near anchor with prestressing for TGP?s permanent shiplock[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(6):853–857.(in Chinese))
[5] 王敏强,刘晓刚,艾建申. 某厂房边坡施工过程仿真及稳定分析[J]. 岩石力学与工程学报,2002,21(增2):2 506–2 510.(WANG Minqiang,LIU Xiaogang,AI Jianshen. Simulation of construction and consolidation process of a slope behind a workshop and stability analysis[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(Supp.2):2 506–2 510.(in Chinese))
[6] 陈胜宏,汪卫明,邹丽春. 岩石边坡开挖及加固分析的弹黏塑性块体元方法[J]. 岩石力学与工程学报,2002,21(7):953–958.(CHEN Shenghong,WANG Weiming,ZOU Lichun. Elasto-viscoplastic block element method for excavation and reinforcement analysis of rock slope[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(7):953–958.(in Chinese))
[7] 高 垠,王科峰,朱奎卫. 复杂岩体边坡治理工程的综合加固措施研究[J]. 岩土工程学报,2007,29(5):760–764.(GAO Yin,WANG Kefeng,ZHU Kuiwei. Study on comprehensive reinforce of complex sloping rock mass[J]. Chinese Journal of Geotechnical Engineering,2007,29(5):760–764.(in Chinese))
[8] 官福海,刘耀儒,杨 强,等. 白鹤滩高拱坝坝趾锚固研究[J]. 岩石力学与工程学报,2010,29(7):1 323–1 332.(GUAN Fuhai,LIU Yaoru,YANG Qiang,et al. Research on anchorage of dam toe of Baihetan high arch dam[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(7):1 323–1 332.(in Chinese))
[9] CHEN S H,PANDE G N. Rheological model and finite element analysis of jointed rock masses reinforced by passive fully-grouted bolts[J]. International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts,1994,31(3):273–277.
[10] 陈胜宏,PETER E,熊文林. 加锚节理岩体流变模型及三维弹黏塑性有限元分析[J]. 水利学报,1998,(9):41–47.(CHEN Shenghong,PETER E,XIONG Wenlin. Rheological model and three dimensional elasto-viscoplastic finite element analysis of jointed rock masses reinforced by bolts[J]. Journal of Hydraulic Engineering,1998,(9):41–47.(in Chinese))
[11] 周 华,王国进,傅少君,等. 小湾拱坝坝基开挖卸荷松弛效应的有限元分析[J]. 岩土力学,2009,30(4):1 175–1 180.(ZHOU Hua,WANG Guojin,FU Shaojun,et al. Finite element analysis of foundation unloading and relaxation effects of Xiaowan arch dam[J]. Rock and Soil Mechanics,2009,30(4):1 175–1 180.(in Chinese))
[12] 陈胜宏,汪卫明,杨志明. 筱溪水电站重力坝坝基锚筋桩加固研究[J]. 岩土力学,2010,31(4):1 151–1 156.(CHEN Shenghong,WANG Weiming,YANG Zhiming. Rock bolt reinforcement for gravity dam foundation of Xiaoxi hydropower project[J]. Rock and Soil Mechanics,2010,31(4):1 151–1 156.(in Chinese)) |
|
|
|