Abstract It is inevitable for the slurry shield to under-pass the embankment in construction of under-river tunnels in urban areas. For the safety of both the embankment structure and construction,resources of risks when slurry shield under-passing the embankment are analyzed in detail,and their causes,impacts and mitigation measures are also studied accordingly. The case history of risk control for slurry shield under-passing the embankment in Hangzhou Qingchun road cross-river tunnel in China confirmed the rationality and feasibility of the suggested risk control measures. Through optimization of slurry shield driving parameters,avoidance of adverse external conditions,in-time monitoring,and setting of detailed emergency countermeasures,some of the risks encountered during slurry shield under-passing the embankment can be reduced or mitigated so as to insure safety of the embankment and construction.
|
Received: 07 December 2010
|
|
|
|