| STDUY OF COMPREHENSIVE TEST METHOD FOR GROUTING EFFECT OF WATER FILLING FAULT IN QINGDAO KIAOCHOW BAY SUBSEA TUNNEL |
| XUE Yiguo,LI Shucai,SU Maoxin,ZHANG Xiao,ZHAO Yan,XU Zhenhao,LI Zhipeng,ZHANG Gongshi |
| (Geotechnical and Structural Engineering Research Center,Shandong University,Jinan,Shandong 250061,China) |
|
|
|
|
Abstract Grouting pressure-grouting flow-grouting time(P-Q-t) control method in grouting entire process,geophysical method,check drilling method and digital camera method from macro to micro had been applied in testing in grouting effect of water filling fault F4–4 in Qingdao Kiaochow Bay subsea tunnel. P-Q-t control method in grouting entire process in which the entire process of grouting P-Q-t control act,grouting pressure in order to limit within 3–4 MPa,when the speed is less than 5 L/min grouting over 20 min,the grouting was ended;the TSP is used to check the surrounding rock after grouting. The results indicate that the integrity of surrounding rock has improved;and its deformation modulus has improved 19.1%;and its density has improved 3.6%;and its Poisson?s ratio has reduced 7.1%;and the VP has improved 0.8%;and the ratio of longitudinal wave velocity of transverse wave velocity VP/VS has reduced 7.1%. The drilling inspection holes amount was 5%–10% of grouting holes. When the single-hole out of water was less than 0.15 L/min,it reached grouting requirements,then it meets the excavation allowed out of water standard. The digital camera method generated three- dimensional virtual cores,then calculated the fracture gap filling paste filling pulse width and the occurrence. It is indicated that the water-filled fissure filling compact. All of above four kinds of test methods determined that the surrounding rock level of water filling fault after grouting has improved from grade V to grade IV. The results show that the grouting effect is good;and it achieved the purpose of reinforcement of the grouting sealing. The comprehensive check method is an effective method of grouting. The above method has some referential and guidance significance to similar projects.
|
|
Received: 08 March 2010
|
|
|
|
| [1] 孙 钧. 海底隧道工程设计施工若干关键技术的商榷[J]. 岩石力学与工程学报,2006,25(8):1 513–1 521.(SUN Jun. Discussion on some key technical issues for design and construction of undersea tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(8):1 513–1 521.(in Chinese))
[2] 王梦恕,皇甫明. 海底隧道修建中的关键问题[J]. 建筑科学与工程学报,2005,22(4):1–4.(WANG Mengshu,HUANGFU Ming. Key problems on subsea tunnel construction[J]. Journal of Architecture and Civil Engineering,2005,22(4):1–4.(in Chinese))
[3] 郭陕云. 关于我国海底隧道建设若干工程技术问题的思考[J]. 隧道建设,2007,27(7):1–5.(GUO Shanyun. Comments on some engineering and technology issues related to building subsea tunnels in China[J]. Tunnel Construction,2007,27(7):1–5.(in Chinese))
[4] 杨 峰,王鹏越. 地质雷达检测路基注浆效果技术方法研究[J]. 公路交通科技,2006,(12):153–158.(YANG Feng,WANG Pengyue. Study on technical method of grouting effect detection on ground penetrating radar in subgrade[J]. Road Traffic Technology,2006,(12):153–158.(in Chinese))
[5] 盛智平,刘庆丰,郑文军. 武广客运专线岩溶注浆效果分析[J]. 路基工程,2007,(3):135–136.(SHENG Zhiping,LIU Qingfeng,ZHENG Wenjun. Effect analysis about karst grouting in Wuhan—Guangzhou passenger line[J]. Subgrade Engineering,2007,(3):135–136.(in Chinese))
[6] 张民庆,张文强,孙国庆. 注浆效果检验评定技术与应用实例[J]. 岩石力学与工程学报,2006,25(增2):3 909–3 918.(ZHANG Minqing,ZHANG Wenqiang,SUN Guoqing,Evaluation technique grouting effect and its application to engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(Supp.2):3 909–3 918. (in Chinese))
[7] 薛翊国,李术才,赵 岩,等. 青岛胶州湾海底隧道F4–4含水断层注浆前后TSP探测分析[J]. 山东大学学报:工学版,2008,38(5):25–30.(XUE Yiguo,LI Shucai,ZHAO Yan,et al. Analysis of TSP prediction before and after grouting about water-burst fault F4–4 of subsea tunnel in Qingdao Kiaochow Bay subsea tunnel[J]. Journal of Shandong University:Engineering Science,2008,38(5):25–30.(in Chinese))
[8] 薛翊国,李术才,苏茂鑫,等. 青岛胶州湾海底隧道综合超前地质预报实践[J]. 岩石力学与工程学报,2009,28(10):2 081–2 087. (XUE Yiguo,LI Shucai,SU Maoxin,et al. Practice of comprehensive early-warning geological prediction on aquifer fault in Qingdao Kiaochow Bay subsea tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(10):2 081–2 087.(in Chinese))
[9] 李术才,薛翊国,张庆松,等. 高风险岩溶地区隧道施工地质灾害综合预报预警关键技术研究[J]. 岩石力学与工程学报,2008,27(7):1 297–1 307.(LI Shucai,XUE Yiguo,ZHANG Qingsong,et al. Key technology study on comprehensive prediction and early- warning of geological hazards during tunnel construction in high-risk karst areas[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(7):1 297–1 307.(in Chinese))
[10] 刘志刚,刘秀峰. TSP在隧道隧洞超前预报中的应用与发展[J]. 岩石力学与工程学报,2003,22(8):1 399–1 402.(LIU Zhigang,LIU Xiufeng. TSP application and development in tunnel lead forecast[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(8):1 399–1 402.(in Chinese))
[11] 赵继增. 海底隧道涌水断层全断面帷幕注浆技术研究[J]. 山东大学学报:工学版,2009,39(6):116–120.(ZHAO Jizeng. Study on full-face curtain grouting on water-burst fault in subsea tunnel[J]. Journal of Shandong University:Engineering Science,2009,39(6):116–120.(in Chinese))
[12] 王川婴,LAW K T. 钻孔摄像技术的发展和现状[J]. 岩石力学与工程学报,2005,24(19):3 440–3 448.(WANG Chuanying,LAW K T. Review of borehole camera technology[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(19):3 440–3 448.(in Chinese))
[13] 魏立巍,秦英译,唐新建,等. 数字钻孔摄像在小浪底帷幕灌浆检测孔中的应用[J]. 岩土力学,2007,28(4):843–848.(WEI Liwei,QIN Yingyi,TANG Xinjian,et al. Application of digital borehole camera to quality test boreholes for grout curtain in Xiaolangdi water control project[J]. Rock and Soil Mechanics,2007,28(4):843–848.(in Chinese))
[14] 秦英译,王川婴. 前视井下电视和数字钻孔摄像在工程中的应用[J]. 岩石力学与工程学报,2007,26(增1):2 834–2 840.(QIN Yingyi,WANG Chuanying. Axial downhole TV and digital optical borehole imaging and their engineering applications[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.1):2 834–2 840.(in Chinese))
[15] 王贵生,董 桂. 岩体裂隙对帷幕灌浆的影响[J]. 东北水利水电,2004,22(5):39–40.(WANG Guisheng,DONG Gui. Influence of rock mass crack on curtain grouting[J]. Water Resources and Hydropower of Northeast China,2004,22(5):39–40.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|