| MONITORING ANALYSIS OF SECONDARY LINING STRUCTURE OF CENTRAL PUMP HOUSE IN DEEP COAL MINE |
| LIU Quansheng1,2,SHI Kai1,KANG Yongshui1,HUANG Xing1 |
(1. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy
of Sciences,Wuhan,Hubei 430071,China;2. College of Civil Engineering and Architecture,Shandong University of Science
and Technology,Qingdao,Shandong 266510,China) |
|
|
|
|
Abstract Based on the notion of the new Austrian tunneling method,the field monitoring of secondary lining structure of central pump house in Zhuji Coal Mine is conducted by displacement convergence gauge and steel-string sensors. And the time-dependent variation laws of surface displacement,contact stress between primary support and secondary lining,reinforcement stress and concrete strain are obtained. The monitoring results show as follows:(1) The surface displacement rate is larger at the early stage and the displacement is convergent after about 100 days of secondary lining construction. (2) The contact between primary support and secondary lining is close,which indicates that the secondary lining bears the load of surrounding rock effectively. (3) The reinforcement stress changes enormously at initial several days,then increases and achieves a steady state eventually. (4) The concrete strain is stable after experiencing a transformation from initial compressive strain to tension strain. By analyzing the monitoring data,the conclusions can be drawn as follows:(1) The final values of all monitoring items are within safety limit,which demonstrates the reliability and security of secondary lining structure. (2) The steel string sensors are easily affected by the hydration heat generated in the process of concrete hardening. (3) The mechanical state of secondary lining is disturbed by excavation of adjecent caverns.
|
|
Received: 04 March 2011
|
|
|
|
| [1] FAIRHURST C. Deformation,yield,rupture and stability of excavations at great depth[C]// Fairhust C ed. Rockburst and Seismicity in Mines. Rotterdam:A. A. Balkema,1990:1 103–1 114.
[2] 谢和平. 深部高应力下的资源开采——现状、基础科学问题与展望[C]// 香山科学会议:科学前沿与未来(第六集). 北京:中国环境科学出版社,2002:179–191.(XIE Heping. Resources development under high ground stress—present state,basic science problems and perspective[C]// Xiangshan Science Conference:Science Foreland and Future (Volume VI). Beijing:China Environment Science Press,2002:179–191.(in Chinese))
[3] 何满潮,谢和平,彭苏萍,等. 深部开采岩体力学研究[J]. 岩石力学与工程学报,2005,24(16):2 803–2 813.(HE Manchao,XIE Heping,PENG Suping,et al. Study on rock mechanics in deep mining engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(16):2 803–2 813.(in Chinese))
[4] 覃卫民,李 祺,任伟中,等. 复杂结构形式隧道的围岩位移监测分析[J]. 岩石力学与工程学报,2010,29(3):549–557.(QIN Weimin,LI Qi,REN Weizhong,et al. Monitoring analysis of surrounding rock displacement for complex structure tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(3):549–557.(in Chinese))
[5] 王亚琼,张少兵,谢永利,等. 浅埋偏压连拱隧道非对称支护结构受力性状分析[J]. 岩石力学与工程学报,2010,29(增1):3 265– 3 272.(WANG Yaqiong,ZHANG Shaobing,XIE Yongli,et al. Mechanical characteristics of unsymmetrical support structure of shallow-buried bias multi-arch tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(Supp.1):3 265–3 272.(in Chinese))
[6] 罗彦斌,陈建勋,王梦恕. 隧道斜交横通道施工对主隧道衬砌结构的影响研究[J]. 岩石力学与工程学报,2010,29(增2):3 792–3 798. (LUO Yanbin,CHEN Jianxun,WANG Mengshu. Study of influence of skew horizontal adit tunnel construction on main tunnel lining structure[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(Supp.2):3 792–3 798.(in Chinese))
[7] 孙克国,李术才,张庆松,等. 特长山岭隧道衬砌监测及模拟研究[J]. 岩石力学与工程学报,2007,26(增2):4 465–4 470.(SUN Keguo,LI Shucai,ZHANG Qingsong,et al. Study on monitoring and simulation of super-long mountain tunnel lining[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.2):4 465–4 470.(in Chinese))
[8] 刘 辉,彭 川,吴从师,等. 岩溶隧道处治结构物稳定性监测分析[J]. 地质与勘探,2009,45(3):330–333.(LIU Hui,PENG Chuan,WU Congshi,et al. The stability inspection analysis of treatment structure of karst tunnel[J]. Geology and Exploration,2009,45(3):330–333.(in Chinese))
[9] 韩同春,郑俊清,朱建才,等. 半硬半软岩层小净距隧道洞口段监测分析[J]. 岩土力学,2010,31(增2):303–307.(HAN Tongchun,ZHENG Junqing,ZHU Jiancai,et al. Monitoring analysis of outlet section of tunnels with small clear-distance in half-hard and half-soft rock strata[J]. Rock and Soil Mechanics,2010,31(Supp.2):303–307.(in Chinese))
[10] 李鹏飞,张顶立,赵 勇,等. 大断面黄土隧道二次衬砌受力特性研究[J]. 岩石力学与工程学报,2010,29(8):1 690–1 696.(LI Pengfei,ZHANG Dingli,ZHAO Yong,et al. Study of mechanical characteristics of secondary lining of large-section loess tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(8):1 690–1 696.(in Chinese))
[11] 夏才初,李永盛. 地下工程测试理论与监测技术[M]. 上海:同济大学出版社,1999:33–50.(XIA Caichu,LI Yongsheng. Test theory and monitoring technology in underground engineering[M]. Shanghai:Tongji University Press,1999:33–50.(in Chinese))
[12] 黄明琦,付贤伦,李云超. 大断面海底隧道软弱地层CRD法施工稳定性控制研究[J]. 岩石力学与工程学报,2007,26(增2):3 805–3 809.(HUANG Mingqi,FU Xianlun,LI Yunchao. Study of stability control of large-section subsea tunnel in weak strata by CRD construction method[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.2):3 805–3 809.(in Chinese))
[13] 路军富,王明年. 大断面海底隧道二次衬砌结构安全性评价[J]. 现代隧道技术,2008,(增1):125–128.(LU Junfu,WANG Mingnian. Safety evaluation of secondary lining structure for a large cross-section subsea tunnel[J]. Modern Tunnelling Technology,2008,(Supp.1):125–128.(in Chinese))
[14] 中华人民共和国国家标准编写组. GB50010—2002混凝土结构设计规范[S]. 北京:中国建筑工业出版社,2002.(The National Standards Compilation Group of People?s Republic of China. GB 50010—2002 Code for design of concrete structures[S]. Beijing:China Architecture and Building Press,2002.(in Chinese)) |
| [1] |
LI Botao1, 2, 3, TAN Yuxuan1, LIN Haifei4, 5*, WEI Jianping1, 2, 3, ZHANG Hongtu1, 2, 3, LI Shugang4, 5, WEI Zongyong4, 5, WANG Pei4, LUO Rongwei4, LIU Yanwei1, 2, 3. Mechanical properties and mesoscopic damage evolution of coal under liquid-nitrogen freezing at different initial temperatures[J]. , 2026, 45(6): 1757-1772. |
|
|
|
|