|
|
|
| STUDY OF DEFECTS CHARACTERISTICS AND REPAIR METHODS OF OLD TUNNEL IN COLD REGION |
| YUAN Chao,LI Shuchen,LI Shucai,LI Wenting
|
| (Geotechnical and Structural Engineering Research Center,Shandong University,Jinan,Shandong 250061,China) |
|
|
|
|
Abstract According to the characteristics of old in-use tunnels of Shenyang—Dandong railway,an investigation on defects like water leaking has been carried out by sketch of tunnel damage and ground penetrating radar(GPR) scanning. The features of defects such as tunnel lining cracking,surface corrosion,water infiltration,freeze-thaw,lining vacuousness,collapse and rockfall of the entrance,etc. are studied and analyzed carefully. The degradation mechanism of tunnels is briefly analyzed from the physical factors and chemical factors. Based on the above, combining the relevant data and operating characteristics of the railway tunnel in cold regions,the flow chart of tunnel maintenance and the main repair methods are given. And these methods are carried out in the Fenshuiling tunnel maintenance works at last. The paper provides theoretical basis for integrated maintenance of tunnels and contributes to the guidance for engineering practice.
|
|
Received: 24 February 2011
|
|
|
|
| [1] 刘海京,夏才初,朱合华,等. 隧道病害研究现状与进展[J]. 地下空间与工程学报,2007,3(5):947–953.(LIU Haijing,XIA Caichu,ZHU Hehua,et al. Studies on tunnel damage[J]. Chinese Journal of Underground Space and Engineering,2007,3(5):947–953.(in Chinese))
[2] 吴江滨,张顶立,王梦恕. 铁路运营隧道病害现状及检测评估[J]. 中国安全科学学报,2003,16(6):49–52.(WU Jiangbin,ZHANG Dingli,WANG Mengshu. Current damage situation of railway operation tunnels and their inspection and evaluation[J]. China Safety Science Journal,2003,16(6):49–52.(in Chinese))
[3] 黄镇南. 论隧道病害的成因与整治[J]. 铁道建筑,2004,(5):27–29.(HUANG Zhennan. Discussion on causes of defects in tunnel and its remedy[J]. Railway Engineering,2004,(5):27–29.(in Chinese))
[4] 中华人民共和国行业标准编写组. TB /T 2820. 2—1997 桥隧建筑物劣化评定标准[S]. 北京:中国铁道出版社,1997.(The Professional Standards Compilation Group of People?s Republic of China. TB /T2820. 2—1997 Standard for extimation of worsen bridge,culvelt and building[S]. Beijing:China Railway Publishing House,1997.(in Chinese))
[5] 铁道部工务局. 铁路工务技术手册(隧道)[M]. 北京:中国铁道出版社,1997:143–150.(The Working Bureau in Ministry of Railway. The handbook of railway operation(tunnel)[M]. Beijing:China Railway Publishing House,1997:143–150.(in Chinese))
[6] 林懂明. 铁路隧道病害的综合检测与治理[J]. 中国铁道科学,2003 (1):101–105(LIN Dongming. Comprehensive detection and cure of the hazards in railway tunnels[J]. China Railway Science,2003,(1):101–105.(in Chinese))
[7] 杨惠林. 祁家大山隧道病害原因分析及加固方案[J]. 公路,2004,(8):187–190.(YANG Huilin. Analysis of fault reasons of Qijia mountain tunnel and strengthening schemes[J]. Highway,2004,(8):187–190.(in Chinese))
[8] 关宝树. 隧道工程维修管理要点集[M]. 北京:人民交通出版社,2004:7–15.(GUAN Baoshu. Focus of maintenance and management of tunnel engineering[M]. Beijing:China Communications Press,2004:7–15.(in Chinese))
[9] 佘 健,何 川. 隧道二次衬砌病害通用处治方法研究[J]. 中国铁道科学,2005,(1):26–31. (SHE Jian, HE Chuan. General treatment methods for secondary lining defect of tunnels[J]. China Railway Science,2005,(1):26–31.(In Chinese))
[10] ASAKURA T,KOJIMA Y. Tunnel maintenance in Japan[J]. Tunnelling and Underground Space Technology,2003,18(2/3):161–169. |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|