|
|
|
| REINFORCEMENT CONSTRUCTION AND MONITORING ANALYSIS OF
ARCH SPRINGING COLLAPSE OF TUNNEL |
| HAN Tongchun1,HUANG Fuming1,ZHENG Junqing1,ZHU Jiancai2,LIN Tinsong2 |
(1. Institute of Geotechnical Engineering,Zhejiang University,Hangzhou,Zhejiang 310058,China;2. Architectural Design
and Research Institute,Zhejiang University,Hangzhou,Zhejiang 310027,China) |
|
|
|
|
Abstract Construction process of mountain tunnel often encounters tunnel collapse,and collapse of arch springing has characteristics of large destructiveness and difficult detection,which is often neglected in actual project. In the Gaobao tunnel of Yongning express way,arch springing collapsed during construction. The cause of arch springing collapse and its reinforcement measure are studied. The displacement and stress of tunnel section near collapsed zone and collapsed zone after reinforcement are monitored to make sure that the surrounding rock is stable and the construction process is safe. The results show that:consolidation measure of arch springing is practicable,surrounding rock deformation and stress are well controlled,ductile injecting method is good. In the construction of tunnel making up of sand soil,much attention should be paid to the accidents caused by expansion of surrounding rock induced by rising up of ground water and rainfall infiltration. When accident of arch spring collapse occurs,surrounding rock of collapsed zone should be sealed up as quickly as possible,and surrounding rock within limits near collapsed zone should be reinforced. Excavation method of one side-surrounding pilot tunnel with short-line short-dig should be applied after monitoring result being stable near collapsed zone. The experience and conclusions presented can provide reference to design,construction and monitoring research of similar tunnels.
|
|
Received: 10 June 2010
|
|
|
|
| [1] 陈秋南,赵明华,周国华,等. 复杂层状岩层隧道塌方原因分析与加固后信息化施工技术[J]. 岩土力学,2009,30(3):650–653. (CHEN Qiunan,ZHAO Minghua,ZHOU Guohua,et al. Cause analysis of complex layered rock tunnel collapse and information construction technology after consolidation[J]. Rock and Soil Mechanics,2009,30(3):650–653.(in Chinese))
[2] 陈秋南,张永兴,刘新荣,等. 隧道塌方段加固后的施工监测与仿真分析[J]. 岩石力学与工程学报,2006,25(1):158–161.(CHEN Qiunan,ZHANG Yongxing,LIU Xinrong,et al. In-situ monitoring and FEM simulation analysis of consolidation for a collapsed highway tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(1):158–161.(in Chinese))
[3] 马 亢,徐 进,吴赛钢,等. 公路隧道局部塌方洞段的围岩稳定性评价[J]. 岩土力学,2009,30(10):2 955–2 960.(MA Kang,XU Jin,WU Saigang,et al. Research on surrounding rock stability in local collapse section of highway tunnels[J]. Rock and Soil Mechanics,2009,30(10):2 955–2 960.(in Chinese))
[4] 马 涛. 浅埋隧道塌方处治方法研究[J]. 岩石力学与工程学报,2006,25(增2):3 976–3 981.(MA Tao. Treatment method for collapse treatment of shallow-buried tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(Supp.2):3 976–3 981.(in Chinese))
[5] 吴 强,刘新荣,杜小平,等. 马垭口隧道塌方事故发生机制的研究[J]. 地下空间与工程学报,2009,5(6):1 241–1 247.(WU Qiang,LIU Xinrong,DU Xiaoping,et al. Study on collapsed mechanism in the Mayakou tunnel[J]. Chinese Journal of Underground Space and Engineering,2009,5(6):1 241–1 247.(in Chinese))
[6] 谭代明,漆泰岳,莫阳春. 侧部岩溶隧道围岩稳定性数值分析与研究[J]. 岩石力学与工程学报,2009,28(增2):3 497–3 503.(TAN Daiming,QI Taiyue,MO Yangchun. Numerical analysis and research on surrounding rock stability of lateral karst cave tunnel[J]. Chinese Journal of Underground Space and Engineering,2009,28(Supp.2):3 497–3 503.(in Chinese))
[7] 王立忠,胡亚元,王百林,等. 崩塌松散围岩隧道施工稳定分析与监控[J]. 岩石力学与工程学报,2003,22(4):589–596.(WANG Lizhong,HU Yayuan,WANG Bailin,et al. Stability analysis and monitoring for tunnel in loose soils during construction[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(4):589–596. (in Chinese))
[8] 申玉生,高 波. 双连拱隧道施工偏压力学特性的监测与分析研究[J]. 岩土力学,2006,27(11):2 601–2 605.(SHEN Yusheng,GAO Bo. Site monitoring and analytical research on mechanical characteristics under construction partial press in double-arch tunnel[J]. Rock and Soil Mechanics,2006,27(11):2 601–2 605.(in Chinese))
[9] 刘志春,李文江,朱永全. 淤泥质地层地铁隧道施工地表沉降预测及分析[J]. 岩土力学,2005,26(10):1 681–1 684.(LIU Zhichun,LI Wenjiang,ZHU Yongquan. Forecast and analysis of surface subsidence of metro tunnel construction in mucky ground[J]. Rock and Soil Mechanics,2005,26(10):1 681–1 684.(in Chinese))
[10] 李二兵,王 镝,王 源,等. 城市复杂条件下浅埋大跨双连拱隧道施工变形监测与控制[J]. 岩石力学与工程学报,2007,26(4):833–839.(LI Erbing,WANG Di,WANG Yuan,et al. Monitoring and control of construction deformation of urban shallow-buried large- span tunnel under complex condition[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(4):833–839.(in Chinese))
[11] 覃卫民,楚 斌,龙立志. 大断面箱涵下穿高速公路过程的施工监测分析[J]. 岩石力学与工程学报,2009,28(9):1 790–1 797.(QIN Weimin,CHU Bin,LONG Lizhi. Analysis of construction monitoring of large-section box culvert jacking process underpass expressway[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(9):1 790–1 797.(in Chinese))
[12] 夏才初,龚建伍,唐 颖,等. 大断面小净距公路隧道现场监测分析研究[J]. 岩石力学与工程学报,2007,26(1):44–50.(XIA Caichu,GONG Jianwu,TANG Ying,et al. Study on site monitoring of large-section highway tunnels with small clear spacing[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(1):44–50.(in Chinese))
[13] 张国华,陈礼彪,钱师雄,等. 大断面小净距大帽山隧道现场监控量测及分析[J]. 岩土力学,2010,31(2):489–497.(ZHANG Guohua,CHEN Libiao,QIAN Shixiong,et al. On-site supervision measure and analysis of Damaoshan tunnels with large-section and small clear-distance[J]. Rock and Soil Mechanics,2010,31(2):489–497.(in Chinese))
[14] 李晓红. 隧道新奥法及其量测技术[M]. 北京:科学出版社,2002:5–23.(LI Xiaohong. NATM and in-situ monitoring technology of tunneling[M]. Beijing:Science Press,2002:5–23.(in Chinese))
[15] 卢义玉,陈凌云,冯卫强,等. 锚喷支护及小导管注浆在隧道塌方段中的应用[J]. 重庆大学学报,2009,32(5):572–576.(LU Yiyu,CHEN Lingyun,FENG Weiqiang,et al. Bolt-shotcrete support and small pipe grouting technology used in treating tunnel collapse[J]. Journal of Chongqing University,2009,32(5):572–576.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|