Abstract Temperature control and crack prevention are one of the key problems for high concrete arch dam. Taking Xiaowan project for example,the most important technologies of temperature control and crack prevention are studied systematically,which include material property,theory and methodology,construction and engineering measures etc.. The reasonable and scientific technology route for the temperature simulation feedback analysis is presented;the simulation feedback analysis system and dynamical information-based design methodology of temperature control design for arch dam are established. Limited value of safety degree for anti-cracking,reasonable scheme of temperature control are recommended for engineers. Therefore,the dynamical design based on simulation feedback analysis of arch dam is implemented well in Xiaowan project. The practical effect indicates that the achievements of this paper provide the theoretical supports and scientific information for the design and construction of Xiaowan arch dam project.
|
|
Received: 22 June 2011
|
|
|
|
| [1] LI F M. 水泥和混凝土化学[M]. 3版. 唐明述,杨南如译. 北京:中国建筑工业出版社,1980:217–314.(LI F M. Chemistry of cement and concrete[M]. 3rd ed. Translated by TANG Mingshu,YANG Nanru. Beijing:China Architecture and Building Press,1980:217–314.(in Chinese))
[2] 蔡正咏. 混凝土性能[M]. 北京:中国建筑工业出版社,1979:94–115.(CAI Zhengyong. Properties of concrete[M]. Beijing:China Architecture and Building Press,1979:94–115.(in Chinese))
[3] 刘克哲. 物理学[M]. 北京:高等教育出版社,1999:620–673.(LIU Kezhe. Physics[M]. Beijing:Higher Education Press,1999:620–673.(in Chinese))
[4] 杨富亮,张利平,王冀忠. 溪洛渡水电站大坝混凝土配合比优化实验研究[J]. 水利水电施工,2010,(2):74–78.(YANG Fuliang,ZHANG Liping,WANG Jizhong. Research on optimization of concrete mix ratio of Xiluodo hydropower station dam[J]. Hydropower Projects Construction,2010,(2):74–78.(in Chinese))
[5] 刘文潮,蔡华龙. 浅析不同骨料组合对大坝混凝土性能的影响[J]. 人民长江,2009,40(18):88–98.(LIU Wenchao,CAI Hualong. Effects of different concrete aggregates composition on properties of concrete of dam[J]. Yangtze River,2009,40(18):88–98.(in Chinese))
[6] 李光伟,杨忠义,杨代六. 高拱坝全级配大体积混凝土力学特性试验研究[J]. 三峡大学学报:自然科学版,2003,25(6):500–503.(LI Guangwei,YANG Zhongyi,YANG Dailiu. Study on mechanical characteristics experiment of fully-graded mass concrete of high arch dam[J]. Journal of China Three Gorges University:Natural Science,2003,25(6):500–503.(in Chinese))
[7] 肖延亮. 高拱坝混凝土真实抗压强度试验研究[J]. 水力发电,2010,36(1):103–109.(XIAO Yanliang. Study on experiment of true compression strength of concrete of high arch dam[J]. Water Power,2010,36(1):103–109.(in Chinese))
[8] 梅明荣,任青文. 混凝土结构的干缩应力研究综述[J]. 水利水电科技进展,2002,22(3):59–62.(MEI Mingrong,REN Qingwen. Review of studies on shrinkage stress of concrete structures[J]. Advances in Science and Technology of Water Resources,2002,22(3):59–62. (in Chinese))
[9] The U.S. Department of Interior Bureau of Reclamation. 混凝土坝的冷却[M]. 侯建功译. 北京:水利电力出版社,1958:1–211.(The U.S. Department of Interior Bureau of Reclamation. Cooling of concrete dam[M]. Translated by HOU Jiangong. Beijing:Hydraulic and Electric Power Press,1958:1–211.(in Chinese))
[10] 朱伯芳. 考虑水管冷却效果的混凝土等效热传导方程[J]. 水利学报,1991,(3):28–34.(ZHU Bofang. The equivalent heat conduction equation of mass concrete considering effect of pipe cooling[J]. Journal of Hydraulic Engineering,1991,(3):28–34.(in Chinese))
[11] 朱伯芳,蔡建波. 混凝土坝水管冷却效果的有限元分析[J]. 水利学报,1985,(4):27–36.(ZHU Bofang,CAI Jianbo. Finite element analysis of water pipe cooling effect on concrete dam[J]. Journal of Hydraulic Engineering,1985,(4):27–36.(in Chinese))
[12] 朱伯芳. 不稳定温度场数值分析的分区异步长解法[J]. 水利学报,1995,(8):46–52.(ZHU Bofang. Zoned different-step-length solution for unsteady temperature field numerical analysis[J]. Journal of Hydraulic Engineering,1995,(8):46–52.(in Chinese))
[13] 秦 杰,黄承逵,黄达海,等. 三峡大坝混凝土施工实时仿真计算[J]. 大连理工大学学报,2002,42(3):359–365.(QIN Jie,HUANG Chengkui,HUANG Dahai,et al. Alive dam construction simulation of Three Gorges hydropower station[J]. Journal of Dalian University of Technology,2002,42(3):359–365.(in Chinese))
[14] 彭成佳,兰春杰,杨家修,等. 普定拱坝温度场反馈分析及开裂仿真[J]. 武汉大学学报:工学版,2006,39(1):21–25.(PENG Chengjia,LAN Chunjie,YANG Jiaxiu,et al. Puding arch dam temperature field feedback analysis and cracking simulation[J]. Engineering Journal of Wuhan University,2006,39(1):21–25.(in Chinese))
[15] 王进廷,王吉焕,刘 毅,等. 二滩拱坝运行期坝体温度场反馈分析[J]. 水力发电学报,2008,27(2):65–70.(WANG Jinyan,WANG Jihuan,LIU Yi,et al. Feedback analysis on temperature field of Ertan arch dam in operation period[J]. Journal of Hydroelectric Engineering,2008,27(2):65–70.(in Chinese))
[16] 朱伯芳. 混凝土坝温度控制与防止裂缝的现状与展望[J]. 水利学报,2006,37(12):1 424–1 432.(ZHU Bofang. Current situation and prospect of temperature control and cracking prevention technology for concrete dam[J]. Journal of Hydraulic Engineering,2006,37(12):1 424–1 432.(in Chinese))
[17] 李文伟,郑 丹. 溪洛渡大坝混凝土特性及防裂措施[J]. 水利水电技术,2010,41(2):48–51.(LI Wenwei,ZHENG Dan. Concrete properties and crack control measures for construction of Xiluodu arch dam[J]. Water Resources and Hydropower Engineering,2010,41(2):48–51.(in Chinese))
[18] 刘林生. 锦屏一级水电站大坝混凝土温控研究[J]. 人民长江,2009,40(18):91–93.(LIU Linsheng. Research on concrete temperature control of Jinping I hydropower station[J]. Yangtze River,2009,40(18):91–93.(in Chinese))
[19] 兰道银,王 翔. 大坝混凝土防裂措施优化之原材料选择[J]. 人民长江,2009,40(18):94–96.(LAN Daoyin,WANG Xiang. Raw material selection for optimized crack prevention measure for dam concrete[J]. Yangtze River,2009,40(18):94–96.(in Chinese))
[20] 葛 畅,舒光胜,王 剑. 小湾电站大坝混凝土内部温控效果分析[J]. 人民长江,2009,40(13):25–27.(GE Chang,SHU Guangsheng,WANG Jian. Analysis of internal concrete temperature control effect of Xiaowan hydropower station[J]. Yangtze River,2009,40(13):25–27.(in Chinese))
[21] 郑守仁. 三峡大坝混凝土设计及温控防裂技术突破[J]. 水利水电科技进展,2009,29(5):46–53.(ZHENG Shouren. Innovations in concrete design,temperature control and anti-cracking techniques for concrete construction of Three Gorges dam[J]. Advances in Science and Technology of Water Resources,2009,29(5):46–53.(in Chinese))
[22] 朱伯芳. 大体积混凝土温度应力与温度控制[M]. 北京:水利电力出版社,1999:633–671.(ZHU Bofang. Thermal stresses and temperature control of mass concrete[M]. Beijing:Water Resources and Electric Power Press,1999:633–671.(in Chinese))
[23] 郭之章. 水工建筑物的温度控制[M]. 北京:水利电力出版社,1990:156–200.(GUO Zhizhang. Temperature control of hydraulic structure[M]. Beijing:Water Resources and Electric Power Press,1990:156–200.(in Chinese))
[24] FU S J,HE T,WANG G J,et al. Evaluation of cracking potential for concrete arch dam based on simulation feedback analysis[J]. Science China Technological Sciences,2011,54(3):565–572.
[25] WANG W M,DING J X,WANG G J,et al. Stability analysis of the temperature cracks in Xiaowan arch dam[J]. Science China Technological Sciences,2011,54(3):547–555.
[26] 中华人民共和国行业标准编写组. DL/T 5346—2006 混凝土拱坝设计规范[S]. 北京:中国电力出版社,2007.(The Professional Standards Compilation Group of People?s Republic of China. DL/T 5346—2006 Design specification for concrete arch dams[S]. Beijing:China Electric Power Press,2007.(in Chinese))
[27] 中华人民共和国行业标准编写组. SL 282—2003 混凝土拱坝设计规范[S]. 北京:中国电力出版社,2004.(The Professional Standards Compilation Group of People?s Republic of China. SL 282—2003 Design specification for concrete arch dams[S]. Beijing:China Electric Power Press,2004.(in Chinese))
[28] 邱焕峰,蒋媛媛,傅少君. 小湾拱坝施工过程温度场仿真分析[J]. 武汉大学学报:工学版,2010,43(6):723–726.(QIU Huanfeng,JIANG Yuanyuan,FU Shaojun. Simulation analysis of temperature field in Xiaowan arch dam construction[J]. Engineering Journal of Wuhan University,2010,43(6):723–726.(in Chinese))
[29] 周 华,傅少君,王国进,等. 小湾拱坝施工期温度场动态跟踪仿真[J]. 武汉大学学报:工学版,2009,42(1):77–81.(ZHOU Hua,FU Shaojun,WANG Guojin,et al. Dynamic tracking simulation analysis of temperature field of Xiaowan arch dam during construction period[J]. Engineering Journal of Wuhan University,2009,42(1):77–81.(in Chinese))
[30] OWEN D R J,HINTON E. Finite elements in plasticity:theory and practice[M]. [S.l.]:Pineridge Press Ltd.,1980:33–94.
[31] MILLER G F. Designing neural networks using genetic algorithm[C]// Proceedings of the Third International Conference on Genetic Algorithms. San Francisco:[s. n.],1989:379–384. |
|
|
|