|
|
|
| EXPERIMENT AND ANALYSIS OF LAW OF SAND DEPOSIT EXPANSION IN FOUNDATION OF IMMERSED TUBE TUNNEL TREATED BY SAND FLOW METHOD |
| FANG Yingguang1,2,LI Wei1,2,MO Haihong1,2,GU Renguo1,2,CHEN Junsheng1,2 |
(1. School of Civil Engineering and Transportation,South China University of Technology,Guangzhou,Guangdong
510641,China;2. State Key Laboratory of Subtropical Building Science,South China University of Technology,
Guangzhou,Guangdong 510641,China) |
|
|
|
|
Abstract In order to explore the law of sand deposit expansion in the sand foundation treatment process treated by sand flow method in the immersed tube tunnel engineering,full-scale test model was built and sand-deposit detector was developed. Changes of sand deposit shape and sand deposit expansion size with time under different experimental conditions were obtained through eight experiments. The analysis result shows that sand grains deposit around the vent in ring-shaped and form crater and sand deposit gradually. Gap and chute for flow form on the top of the sand deposit,elongating basically along the radial direction and distributing randomly on circumferential direction. Sand grains are carried from the gap and chute and deposit on the outer margin surface of the sand deposit,in which oblique layered texture is formed. The factors such as the mass ratio of sand-water,the boundary conditions,the foundation trench and the roughness of the model board have a major impact on the expansion process of the sand deposit but not significantly impact the final size and the density. The test results may be help to design and construction of the Zhoutouzui immersed tube tunnel in Guangzhou.
|
|
Received: 08 August 2011
|
|
|
|
| [1] 孙 钧. 海底隧道工程设计施工若干关键技术的商榷[J]. 岩石力学与工程学报,2006,25(8):1 513–1 521.(SUN Jun. Discussion on some key technical issues for design and construction of undersea tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(8):1 513–1 521.(in Chinese))
[2] 王梦恕. 水下交通隧道发展现状与技术难题——兼论“台湾海峡海底铁路隧道建设方案”[J]. 岩石力学与工程学报,2008,27(11):2 161–2 172.(WANG Mengshu. Current developments and technical issues of underwater traffic tunnel—discussion on construction scheme of Taiwan strait undersea railway tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(11):2 161–2 172.(in Chinese))
[3] 管敏鑫. 沉管隧道在越江工程中的地位以及有关的新认识[J]. 现代隧道技术,2004,41(1):1–4.(GUAN Minxin. The role of the tunneling by immersed tube method in the river-crossing engineering and some related new cognitions[J]. Modern Tunnelling Technology,2004,41(1):1–4.(in Chinese))
[4] KUESEL T R. Alternative concepts for undersea tunnels[J]. Tunnelling and Underground Space Technology,1986,1(1):283–287.
[5] 傅琼阁. 沉管隧道的发展与展望[J]. 中国港湾建设,2004,(5):53–58.(FU Qiongge. Development and prospect of immersed tunnels[J]. China Harbour Engineering,2004,(5):53–58.(in Chinese))
[6] 王艳宁,熊 刚. 沉管隧道技术的应用与现状分析[J]. 现代隧道技术,2007,44(4):1–4.(WANG Yanning,XIONG Gang. Application and state of the art of immersed tube tunnels[J]. Modern Tunnelling Technology,2007,44(4):1–4.(in Chinese))
[7] 俞国青,傅宗甫. 欧美的沉管法隧道[J]. 水利水电科技进展,2000,20(6):11–14.(YU Guoqing,FU Zongfu. Tunnels built by immersed tube method in Europe and America[J]. Advances in Science and Technology of Water Resources,2000,20(6):11–14.(in Chinese))
[8] 杨文武. 沉管隧道工程技术的发展[J]. 隧道建设,2009,29(4):397–404.(YANG Wenwu. Development of immersed tube tunneling technology[J]. Tunnel Construction,2009,29(4):397–404.(in Chinese))
[9] GRANTZ W C. Immersed tunnel settlements part 1:nature of settlements[J]. Tunnelling and Underground Space Technology,2001,16(1):195–201.
[10] 张庆贺,高卫平. 水域沉管隧道基础处理方法的对比分析[J]. 岩土力学,2003,24(增2):349–352.( ZHANG Qinghe,GAO Weiping. Comparison analysis of treatment methods of pipe-sinking tunnels[J]. Rock and Soil Mechanics,2003,24(Supp.2):349–352.(in Chinese))
[11] 陈韶章,陈 越,张 弥. 沉管隧道设计与施工[M]. 北京:科学出版社,2002:278–312.(CHEN Shaozhang,CHEN Yue,ZHANG Mi. Immersed tube tunnel design and construction[M]. Beijing:Science Press,2002:278–312.(in Chinese))
[12] GLERUM A. Developments in immersed tunnelling in Holland[J]. Tunnelling and Underground Space Technology,1995,10(4):455–462.
[13] VAN TONGEREN I H. The foundation of immersed tunnels[C]// Delta Tunnelling Symposium. Amsterdam:[s.n.],1978:48–57.
[14] 黎志均. 珠江隧道工程基础灌砂试验研究[J]. 中国港湾建设,2001,(1):18–20.(LI Zhijun. Study and research of sand filled foundation for underwater tunnel crossing Pearl river[J]. China Harbour Engineering,2001,(1):18–20.(in Chinese))
[15] 郑爱元,谭忠盛,李治国. 沉管隧道基础灌砂模拟试验[J]. 中国工程科学,2009,11(7):81–85.(ZHENG Aiyuan,TAN Zhongsheng,LI Zhiguo. Simulation experiment of pumped sand on immersed tunnel[J]. Engineering Sciences,2009,11(7):81–85.(in Chinese))
[16] 莫海鸿,房营光,黎 伟,等. 砂流法处理沉管隧道地基的模型试验方法[J]. 广东土木与建筑,2011,18(3):14–17.(MO Haihong,FANG Yingguang,LI Wei,et al. Model test method for the foundation of immersed tunnel tube treated by sand flow method[J]. Guangdong Architecture Civil Engineering,2011,18(3):14–17.(in Chinese))
[17] 钱 宁,万兆惠. 泥沙运动力学[M]. 北京:科学出版社,2003:45–84.(QIAN Ning,WAN Zhaohui. Dynamic mechanics of sediment transport[M]. Beijing:Science Press,2003:45–84.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|