| CAUSE ANALYSIS OF CRACKING IN RIGHT ABUTMENT SLOPE OF CHANGHEBA HYDROPOWER STATION |
| CHEN Jiawei1,DENG Jianhui1,WEI Jinbing1,WU Xiaoyu2,ZHANG Anchuan2 |
(1. State Key Laboratory of Hydraulics and Mountain River Engineering,Sichuan University,Chengdu,Sichuan 610065,China;
2. HydroChina Chengdu Engineering Corporation,Chengdu,Sichuan 610072,China) |
|
|
|
|
Abstract The right abutment slope of Changheba hydropower station belongs to high and steep rock slope. During its excavation,sixteen cracks have been found successively;the stability and subsequent excavation of slope have been significantly influenced. Based on the analysis of geological conditions,rock mass structures and monitoring data,major deformation zone and direction of the slope have been defined;the main reasons of the deformation and cracking are deduced;potential instability mode is formulated;and suggestions are made for further excavation and reinforcement. The joint set J1 has been exposed during slope excavation. The shear deformation has happened along the joint set J1,then the upper rock mass has been dragged along joint set J4. The platy rock mass on the slope top tends to overturning. Finally the fault F0 and its footwall rock produce compression deformation,and subsidence of its last plate rock aggregates the deformation of the slope top. The mode of potential instability is toe sliding-middle tension-rear overturning. After implementation of reinforcing measures,the cracking and deformation have been controlled successfully and the slope is basically safe.
|
|
Received: 06 December 2011
|
|
|
|
| [1] 宋胜武,向柏宇,杨静熙,等. 锦屏一级水电站复杂地质条件下坝肩高陡边坡稳定性分析及其加固设计[J]. 岩石力学与工程学报,2010,29(3):442–458.(SONG Shengwu,XIANG Baiyu,YANG Jingxi,et al. Stability analysis and reinforcement design of high and steep slopes with complex geology abutment of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(3):442–458.(in Chinese))
[2] 黄 春,柯善军. 大岗山水电站工程边坡稳定性分析[J]. 中国水能及电气化,2010,(9):43–46.(HUANG Chun,KE Shanjun. Slope stability analysis of Dagangshan hydropower station engineering[J]. China Water Power and Electrification,2010,(9):43–46.(in Chinese))
[3] 沈军辉,崔建凯,徐 进,等. 长河坝水电站坝址区斜坡应力场特征研究[J]. 岩石力学与工程学报,2007,26(增1):2 946–2 951. (SHEN Junhui,CUI Jiankai,XU Jin,et al. Study on characteristics of slope stress field at dam site of Changheba hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.1):2 946–2 951.(in Chinese))
[4] 中国水电顾问集团成都勘测设计研究院. 四川省大渡河长河坝水电站可行性研究报告之3——工程地质[R]. 成都:中国水电顾问集团成都勘测设计研究院,2006.(HydroChina Chengdu Engineering Corporation. Possibility research report of Changheba hydropower project,Dadu River in Sichuan province,part 3:engineering geology[R]. Chengdu:Hydrochina Chengdu Engineering Corporation,2006.(in Chinese))
[5] 中华人民共和国行业标准编写组. DL/T5353—2006水电水利工程边坡设计规范[S]. 北京:中国电力出版社,2007.(The Professional Standards Compilation Group of People?s Republic of China. DL/ T5353—2006 Design specification for slope of hydropower and water conservancy project[S]. Beijing:China Electric Power Press,2007.(in Chinese))
[6] 周德培,钟 卫,杨 涛. 基于坡体结构的岩质边坡稳定性分析[J]. 岩石力学与工程学报,2008,27(4):687–695.(ZHOU Depei,ZHONG Wei,YANG Tao. Stability analysis of rocky slope based on slope structures[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(4):687–695.(in Chinese))
[7] 黄秋香,汪家林,邓建辉. 基于多点位移计监测成果的坡体变形特征分析[J]. 岩石力学与工程学报,2009,28(增1):2 667–2 673. (HUANG Qiuxiang,WANG Jialin,DENG Jianhui. Slope deformation character analysis based on monitoring results of multi-point borehole extensometer[J]. Chinese Journal o f Rock Mechanics and Engineering,2009,28(Supp.1):2 667–2 673.(in Chinese))
[8] 王俤剀,彭 琦,汤 荣,等. 地下厂房岩锚梁裂缝成因分析[J]. 岩石力学与工程学报,2007,26(10):2 125–2 129.(WANG Dikai,PENG Qi,TANG Rong,et al. Causes analysis of cracking of rock- bolted crane girder in an underground powerhouse[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(10):2 125–2 129.(in Chinese))
[9] 二滩水电开发有限责任公司. 岩土工程安全监测手册[M]. 北京:中国水利水电出版社,1999:73–96.(Ertan Hydropower Development Company,Ltd.. Geotechnical engineering safety monitoring manual[M]. Beijing:China Water Power Press,1999:73–96.(in Chinese))
[10] 邓建辉,魏进兵,台佳佳,等. 长河坝水电站坝肩高边坡稳定分析及加固措施研究报告[R]. 成都:四川大学,2007.(DENG Jianhui,WEI Jinbing,TAI Jiajia. et al. Study of the stability and reinforcement of the abutment slope of Changheba hydropower station[R]. Chengdu:Sichuan University,2007.(in Chinese)) |
| [1] |
LIU Caihua1, 2*, FAN Kai1, 2, SUN Chaoyi1, 2, ZHANG Wei1, 2, YUAN Jiahao1, 2. Geological characteristics, disaster mechanisms and stability analysis methods of rock slope toppling [J]. , 2026, 45(3): 639-667. |
|
|
|
|