| TREATMENT OF HIGH AND STEEP SLOPES WITH COMPLICATED GEOLOGICAL CONDITIONS AT LEFT ABUTMENT OF JINPING I HYDROPOWER STATION |
| WANG Jimin1,DUAN Shaohui1,HU Shuhong1,2 |
(1. Jinping Construction Management Authority,Ertan Hydropower Development Company Ltd.,Chengdu,Sichuan 610021,China;
2. Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan,Hubei 430010,China) |
|
|
|
|
Abstract To deal with the toppling deformation and fracture rock-mass problem at the embankment slope in Jinping hydropower station,the whole slope surface is reinforced by shotcrete support,rock bolting and frame pier with prestressed cable. The integral stability of left slope is controlled by the potential large sliding body which is composed by fault f42–9,deep crack SL44–1 and lamprophyre dike X. Some three-layer anti-shear tunnels on the sliding body are designed;and a lot of deep perstressed cables across the faults are placed at the slope surface to reinforce the sliding body. A management system,which follows the principle of dynamic design,scientific study tracking,safety monitoring and immediate reacting analysis,and dynamic management informationization,is established. According to the geological conditions and safety monitoring data during excavation,combining with construction situation,slope stability analysis and real-time safety monitoring could be conducted;in addition to the optimization of design and strict controlling of construction procedure,excavation work of the left embankment slope finally goes on smoothly.
|
|
Received: 28 April 2012
|
|
|
|
| [1] 周建平,杨泽艳,翁新雄,等. 中国典型工程边坡•水利水电工程卷[M]. 北京:中国水利水电出版社,2008:序.(ZHOU Jianping,YANG Zeyan,WENG Xinxiong,et al. Typical Chinese slope•water conservancy and hydropower engineering volume[M]. Beijing,China Water Power Press,2008:introduction.(in Chinese))
[2] 黄润秋. 岩石高边坡发育的动力过程及其稳定性控制[J]. 岩石力学工程学报,2008,27(8):1 525–1 544.(HUANG Runqiu. Geodynamical process and stability control of high rock slope development[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(8):1 525–1 544.(in Chinese))
[3] 蔡大咏,湛正刚,杨 秋,等. 洪家渡水电站进水口顺向坡加固处理设计[J]. 贵州水利发电,2005:19(3):42–45.(CAI Dayong,ZHAN Zhenggang,YANG Qiu,et al. Strengthening design for inlet consequent slope of Hongjiadu hydropower station reinforcement designing[J]. Guizhou Water Power,2005,19(3):42–45.(in Chinese))
[4] 聂 强,李鹏程. 龙滩水电站左岸蠕变体高边坡处理设计与施工[J]. 人民长江,2008,39(6):68–70.(NIE Qiang,LI Pengcheng. Study on treatment design and construction of creep mass high slope of Longtan hydropower station[J]. Yangtze River,2008,39(6):68–70.(in Chinese))
[5] 马洪琪. 小湾水电站建设中的几个技术难题[J]. 水利发电,2009,35(9):17–21.(MA Hongqi. Technical difficulties in the construction of Xiaowan hydropower station[J]. Water Power,2009,35(9):17–21.(in Chinese))
[6] 荣 冠,朱焕春,王思敬. 锦屏一级水电站左岸边坡深部裂缝成因初探[J]. 岩石力学工程学报,2008,27(增1):2 855–2 863.(RONG Guan,ZHU Huanchun,WANG Sijing. Preliminary study of deep fissures on the left bank of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(Supp.1):2 855–2 863.(in Chinese))
[7] 中国水电工程顾问集团成都勘测设计研究院. 左岸边坡稳定性性分析及加固措施研究[R]. 成都:中国水电工程顾问集团成都勘测设计研究院,2010.(Chengdu:HydroChina Chengdu Engineering Corporation. Analysis of left slope stability and reinforcement measurements studies[R]. Chengdu:HydroChina Chengdu Engineering Corporation,2010.(in Chinese))
[8] 电工程顾问集团成都勘测设计研究院. 四川省雅砻江锦屏一级水电站大坝基础开挖及支护施工技术要求[R]. B版. 成都:中国水电工程顾问集团成都勘测设计研究院,2007.(HydroChina Chengdu Engineering Corporation. Dam foundation excavation and support measurement specification of Jinping I hydropower station in Yalong river,Sichuan province[R]. B ed. Chengdu:HydroChina Chengdu Engineering Corporation,2007.(in Chinese))
[9] 周 钟,巩满福,黄 河,等. 四川省雅砻江锦屏一级水电站枢纽区边坡稳定性分析及加固措施专题研究报告[R]. 成都:中国水电工程顾问集团成都勘测设计研究院,2005.(ZHOU Zhong,GONG Manfu,HUANG He,et al. Slope stablity and reinforcement measurements study report of Jinping I hydropower station,located on Yalong river,Sichuan province[R]. Chengdu:HydroChina Chengdu Engineering Corporation,2005.(in Chinese))
[10] 中国水利水电建设工程咨询公司. 雅砻江锦屏一级水电站枢纽区边坡工程专题咨询报告[R]. 北京:中国水利水电建设工程咨询公司,2005. (China Water Conservancy and Hydropower Construction Engineering Consulting Company. Special consultation report of Jinping I hydropower station slope engineering in Yalong river[R]. Beijing:China Water Conservancy and Hydropower Construction Engineering Consulting Company,2005.(in Chinese))
[11] 张公平,唐忠敏,饶宏玲. 锦屏一级水电站左岸坝头边坡加固措施施工时序研究[J]. 水电站设计,2011,27(3):10–17.(ZHANG Gongping,TANG Zhongmin,RAO Hongling. Study on left slope reinforcement sequence of Jinping I hydropower station[J]. Design of Hydroelectric Power Station,2011,27(3):10–17.(in Chinese))
[12] 宋胜武,向柏宇,杨静熙,等. 锦屏一级水电站复杂地质条件下坝肩高陡边坡稳定性分析及其加固设计[J]. 岩石力学工程学报,2010,29(3):442–458.(SONG Shengwu,XIANG Boyu,YANG Jingxi,et al. Stability analysis and reinforcement design of high steep slope with complex geological condition in abutment of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(3):442–458.(in Chinese)) |
|
|
|