[1] 黄润秋,黄 达,段绍辉,等. 锦屏I级水电站地下厂房施工期围岩变形开裂特征及地质力学机制研究[J]. 岩石力学与工程学报,2011,30(1):23–35.(HUANG Runqiu,HUANG Da,DUAN Shaohui,et al. Geomechanics mechanism and characteristics of surrounding rock mass deformation failure in construction phase for underground powerhouse of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(1):23–35. (in Chinese))
[2] 魏进兵,邓建辉,王俤剀,等. 锦屏一级水电站地下厂房围岩变形与破坏特征分析[J]. 岩石力学与工程学报,2010,29(6):1 198–1 205.(WEI Jinbing,DENG Jianhui,WANG Dikai,et al. Characteri- zation of deformation and fracture for rock mass in underground powerhouse of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(6):1 198–1 205.(in Chinese))
[3] 彭 琦,王俤剀,邓建辉,等. 地下厂房围岩变形特征分析[J]. 岩石力学与工程学报,2007,26(12):2 583–2 587.(PENG Qi,WANG Dikai,DENG Jianhui,et al. Analysis of surrounding rock deformation characteristics in underground powerhouse[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(12):2 583– 2 587.(in Chinese))
[4] 杨林德,颜建平,王悦照,等. 围岩变形的时效特征与预测的研究[J]. 岩石力学与工程学报,2005,24(2):212–216.(YANG Linde,YAN Jianping,WANG Yuezhao,et al. Study on time- dependent properties and deformation prediction of surrounding rock[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(2):212–216.(in Chinese))
[5] 袁培进,孙建会,刘志珍,等. 向家坝水电站地下主厂房围岩稳定监测分析[J]. 岩石力学与工程学报,2010,29(6):1 140–1 148. (YUAN Peijin,SUN Jianhui,LIU Zhizhen,et al. Monitoring analysis of rock stability of underground main powerhouse in Xiangjiaba hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(6):1 140–1 148.(in Chinese))
[6] 江 权,冯夏庭,陈国庆,等. 高地应力条件下大型地下洞室群稳定性综合研究[J]. 岩石力学与工程学报,2008,27(增2):3 768– 3 777.(JIANG Quan,FENG Xiating,CHEN Guoqing,et al. Stability study of large underground caverns under high geostress[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(Supp.2): 3 768–3 777.(in Chinese))