[6] |
陈宗基. 地下巷道长期稳定性的力学问题[J]. 岩石力学与工程学报,1982,1(1):1-20.(TAN Tjongkie. Mechanical problems of long-term stability of underground galleries[J]. Chinese Journal of Rock Mechanics and Engineering,1982,1(1):1-20.(in Chinese))
|
[8] |
刘志春,李文江,朱永全,等. 软岩大变形隧道二次衬砌施作时机探讨[J]. 岩石力学与工程学报,2008,27(3):580-588.(LIU Zhichun,LI Wenjiang,ZHU Yongquan,et al. Research on construction time of secondary lining in soft rock of large-deformation tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(3):580-588. (in Chinese))
|
[9] |
晏启祥,何 川,姚 勇. 软岩隧道施工特性及其动态力学行为研究[J]. 岩石力学与工程学报,2006,25(3):572-577.(YAN Qixiang,HE Chuan,YAO Yong. Study on construction characteristic and dynamic behavior of soft rock tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(3):572-577.(in Chinese))
|
[1] |
钱七虎. 非线性岩石力学的新进展——深部岩体力学的若干问题[C]// 第八次全国岩石力学与工程学术大会论文集. 北京:科学出版社,2004:10-17.(QIAN Qihu. The current development of nonlinear rock mechanics—the mechanics problems of deep rock mass[C]// Proceedings of the 8th Rock Mechanics and Engineering Conference. Beijing:Science Press,2004:10-17.(in Chinese))
Your browse does not support frame! |