| DESIGN AND PRACTICE OF ZENGBEI ROAD CONSEQUENT BEDDING ROCK SLOPE TREATMENT ENGINEERING |
| LIU Huancun,SUN Fengling,WEI Haitao,MU Weigang,QI Lei |
| (AVIC Geotechnical Engineering Institute Co.,Ltd.,Beijing 100098,China) |
|
|
|
|
Abstract Zengbei road consequent rock slope located in Shiquan brickworks of mined shanty-towns of Mentougou District,Beijing,is composed of strongly weathered sandstone and weathered sandstone. The slope occurred consequent bedding rock slope while the slope toe grading;and as a result,the rubble retaining wall of the road cracked. However,the rock mass of the slope toe must be cleaned up for more architectural space;so,the permanent slope was built as well. The rock slope was treated with lattice anchor retaining wall and cast-in-site column type retaining wall according to the characters of the slope by scheme comparison and top-down construction method. The step I was lattice anchor retaining wall;while the steps II and III were cast-in-site column type retaining walls. The bracing system is safe and beautiful,which achieves good socioeconomic benefits. It has reference value for the similar projects.
|
|
Received: 03 June 2013
|
|
|
|
| [1] 李成敏,周庆人. 从工程实例分析谈顺层岩质边坡的勘察与参数选取[J]. 城市勘测,2010,(1):172–176.(LI Chengmin,ZHOU Qingren. The exploration and parameters selection of the bedding rock slope based on engineering examples[J]. Urban Getechnical Investigation and Surveying,2010,(1):172–176.(in Chinese))
[2] 李安洪,周德培,冯 君. 顺层岩质路堑边坡破坏模式及设计对策[J]. 岩石力学与工程学报,2009,28(增1):2 915–2 921.(LI Anhong,ZHOU Depei,FENG Jun. Failure modes of bedding rock cutting slope and design countermeasures[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(Supp.1):2 915–2 921.(in Chinese))
[3] 中华人民共和国国家标准编写组. GB 50330—2002建筑边坡工程技术规范[S]. 北京:中国建筑工业出版社,2002.(The National Standards Compilation Group of the People′s Republic of China. GB 50330—2002 Technical code for building slope engineering[S]. Beijing:China Architecture and Building Press,2002.(in Chinese))
[4] 冯 君,周德培,李安洪. 顺层岩质边坡开挖模型试验及稳定性影响因素分析[J]. 工程地质学报,2005,13(3):294–299.(FENG Jun,ZHOU Depei,LI Anhong. Model test and stability influence factors analysis of consequent rock slope[J]. Journal of Engineering Geology,2005,13(3):294–299.(in Chinese))
[5] 冯 君,周德培,李安洪. 顺层岩质边坡开挖松弛区试验研究[J]. 岩土力学与工程学报,2005,24(5):840–845.(FENG Jun,ZHOU Depei,LI Anhong. Research on relaxation region for rock bedded cutting slope by physical modeling[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(5):840–845.(in Chinese))
[6] 孙广忠. 岩体结构力学[M]. 北京:科学出版社,1998:50–62.(SUN Guangzhong. Rock mass structure mechanics[M]. Beijing:Science Press,1998:50–62.(in Chinese))
[7] 龚文惠,王 平,陈 峰. 顺层岩质路堑边坡稳定性的敏感性因素分析[J]. 岩土力学,2007,28(4):812–816.(GONG Wenhui,WANG Ping,CHEN Feng. Analysis of sensitivity factors to stability of bedding rock cutting slope[J]. Rock and Soil Mechanics,2007,28(4):812–816.(in Chinese))
[8] 夏 雄. 桩锚结构设计理论及安全性评价[博士学位论文][D]. 成都:西南交通大学,2006.(XIA Xiong. Design theory of pile anchor structure and safety evaluation[Ph. D. Thesis][D]. Chengdu:Southwest Jiaotong University,2006.(in Chinese))
[9] 张庆远. 路基边坡预应力锚固技术应用研究[硕士学位论文][D]. 成都:西南交通大学,2006.(ZHANG Qingyuan. Study of prestress anehoraging technology application in subgrade slope[M. S. Thesis][D]. Chengdu:Southwest Jiaotong University,2006.(in Chinese))
[10] 冯 君. 顺层岩质边坡开挖稳定性及其支护措施研究[博士学位论文][D]. 成都:西南交通大学,2005.(FENG Jun. The bedding rock slope stability and support measures research[Ph. D. Thesis][D]. Chengdu:Southwest Jiaotong University,2005.(in Chinese)) |
|
|
|