| RESEARCH ON LINING REINFORCEMENT DESIGN METHOD BY CRACK WIDTH CONTROL FOR RECTANGULAR PRESSURE TUNNEL WITH ARCH CROWN |
| LI Ning,LIU Bo |
| (Institute of Geotechnical Engineering,Xi'an University of Technology,Xi?an,Shaanxi 710048,China) |
|
|
|
|
Abstract Taking the rectangular free-surface flow tunnel with arch crown to reconstruct into pressure hydropower tunnel as the object,the combined effects of surrounding rock,lining concrete and steel were synthetically analyzed when the lining cracks before and after occurring;a two-dimensional(plane strain) nonlinear finite element numerical simulation model was established. After that,the stress of steel,the stress of concrete,the regularities distribution of cracks,the crack width and the results of reinforcement design of the lining which is under the operation stage with internal water pressure conditions were got. Also,under the maintenance time with external water pressure conditions,the phenomenon of stress concentration of lining concrete cracks and the checking results of lining reinforcement were got. Compared with the previous methods the lining reinforcement design method proposed in this paper lead into more factors which may affects the reinforcement results,making the results much in line with the actual condition of the hydraulic pressure tunnel. It has guiding significance for similar engineering design.
|
|
Received: 14 October 2012
|
|
|
|
| [1] 潘家铮. 水工隧洞和调压室[M]. 北京:水利电力出版社,1990:131–232.(PAN Jiazheng. Hydraulic tunnel and surge chamber[M]. Beijing:Water Resources and Electric Power Press,1990:131–232. (in Chinese))
[2] 刘秀珍. 关于圆形有压水工隧洞衬砌裂缝计算的探讨[J]. 水力发电,1983,(12):37–44.(LIU Xiuzhen. Discussion on pressure hydraulic tunnel cracks calculated on circular[J]. Water Power,1983,(12):37–44.(in Chinese))
[3] BROMS B B,LUTZ L A. Effects of arrangement of reinforcement on crack width and spacing of reinforced concrete members[J]. ACI Journal Proceedings,1965,62(11):1 395–1 410.
[4] DARWIN D,SCANLON A. Cracking of concrete members in direct tension[J]. ACI Journal Proceedings,1986,83(1):3–12.
[5] SCHLEISS A J. Design of reinforced concrete lining of pressure tunnels and shafts[J]. Hydropower and Dams,1997,(3):88–94.
[6] 蔡晓鸿,蔡勇平. 水工压力隧洞结构应力计算[M]. 北京:中国水利水电出版社,2004:212–232.(CAI Xiaohong,CAI Yongping. Structural stress calculation for hydraulic pressure tunnel[M]. Beijing:China Water Power Press,2004:212–232.(in Chinese))
[7] 荣 耀,许锡宾,蔡晓鸿. 基于弹性地基梁法的隧道衬砌裂缝间距和宽度的计算[J]. 重庆建筑大学学报,2006,28(5):23–26.(RONG Yao,XU Xibing,CAI Xiaohong. Calculation of crack space and crack width of tunnel lining based on elastic foundation curved beam[J]. Journal of Chongqing Jianzhu University,2006,28(5):23–26.(in Chinese))
[8] 张有天. 水工隧洞建设的经验和教训(上)[J]. 贵州水力发电,2001,15(4):76–84.(ZHANG Youtian. Experiences and lessons of the hydraulic tunnel construction(First)[J]. Guizhou Water Power,2001,15(4):76–84.(in Chinese))
[9] 张有天. 水工隧洞建设的经验和教训(下)[J]. 贵州水力发电,2002,16(4):75–84.(ZHANG Youtian. Experiences and lessons of the hydraulic tunnel construction(Second)[J]. Guizhou Water Power,2002,16(4):76–84.(in Chinese))
[10] 侯 靖,胡敏云. 水工高压隧洞结构设计中若干问题的讨论[J]. 水利学报,2001,(7):36–40.(HOU Jing,HU Minyun. Discussion on some problem in design of high pressure tunnel for hydro projects[J]. Journal of Hydraulic Engineering,2001,(7):36–40.(in Chinese))
[11] 苏 凯,伍鹤皋. 水工隧洞钢筋混凝土衬砌非线性有限元分析[J]. 岩土力学,2005,26(9):1 485–1 490.(SU Kai,WU Hegao. Nonlinear FEM analysis of reinforced concrete-lining of hydraulic tunnels[J]. Rock and Soil Mechanics,2005,26(9):1 485–1 490.(in Chinese))
[12] 丁旭柳,伍鹤皋,朱忠华. 钢筋混凝土压力隧洞裂缝宽度计算方法的探讨[J]. 武汉大学学报:工学版,2001,34(2):24–27.(DING Xuliu,WU Hegao,ZHU Zhonghua. Study on computational method of crack width of reinforced concrete pressure tunnels[J]. Engineering Journal of Wuhan University,2001,34(2):24–27.(in Chinese))
[13] 李青麟,何其诚. 压力隧洞衬砌计算方法[J]. 水力发电学报,1993,(3):24–33.(LI Qingqi,HE Qicheng. A computational method for the lining of pressure tunnel[J]. Journal of Hydroelectric Engineering,1993,(3):24–33.(in Chinese))
[14] 杜小凯,任青文,夏 宁. 高压引水隧洞若干问题的研究现状和存在的问题[J]. 水力发电,2007,33(6):65–68.(DU Xiaokai,REN Qingwen,XIA Ning. Status quo of the study on the several problems of high pressure diversion tunnel and its existing problems[J]. Water Power,2007,33(6):65–68.(in Chinese))
[15] 汪基伟,冷 飞,蒋 勇. 圆形压力隧洞限裂配筋设计方法研究[J]. 土木工程学报,2011,44(10):143–148.(WANG Jiwein,LENG Fei,JIANG Yong. Study of reinforcement design by crack width control for circular pressure tunnels[J]. China Civil Engineering Journal,2011,44(10):143–148.(in Chinese))
[16] 中化人民共和国行业标准编写组. DL/T 5195-2004 水工隧洞设计规范[S]. 北京:中国电力出版社,2004.(The Professional Standards Compilation Group of People?s Republic of China. DL/T 5195-2004 Specification for design of hydraulic tunnel[S]. Beijing:China Electric Power Press,2004.(in Chinese))
[17] 李 宁,陈 波,陈飞熊,等. 奥地利岩土工程软件FINAL的应用与开发[J]. 西安交通大学学报,2000,20(1):27–33.(LI Ning,CHEN Bo,CHEN Feixiong,et al. Development and application of the Austrian software FINAL in China[J]. Journal of Xi?an Highway University,2000,20(1):27–33.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|