| DISCUSSION ON DESIGN AND CALCULATION METHOD OF STRUCTURAL LOADS FOR PERMEABLE TUNNEL
WITH RIBBED ARCH BEAM |
| YU Fei1,CHEN Shanxiong1,CHEN Xiuhe2,ZHANG Sheng2,WANG Fei2 |
| (1. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan,Hubei 430071,China;2. Anhui Communications Consulting and Design Institute,Hefei,Anhui 230041,China) |
|
|
|
|
Abstract The permeable tunnel with ribbed arch beam,which is a new type of tunnel structure,is analyzed. The geological environmental conditions and structural characteristics of this tunnel are expounded;and the concept of the design load standard for which the relaxation of the pressure caused by the surrounding rock failure in the limit state for this kind of non-symmetric half-dark tunnel structure is presented. By the numerical simulation study of the pattern and scope of tunnel surrounding rock failure,the basic failure modes of this tunnel can be concluded as which the vault slope rock slip along a ramp through the arch of the foot to form a wedge,and the size of the angle between the sliding failure surface and the horizontal plane determine the range of surrounding rock failure. On this basis,the structural load design and calculation model of the permeability tunnel with ribbed arch beam is established with theoretical analysis of the derivation,and compared and analyzed with the actual monitoring data and the numerical simulation results of construction conditions. The results show that the calculated internal forces distribution of this model can better reflects the variation of the internal force of tunnel structure,have a reliable safety margin,so as to provide a practical and effective design calculation method for the same type of half-dark tunnel structure section design and evaluation of long-term stability.
|
|
Received: 12 November 2012
|
|
|
|
| [1] 蒋树屏,刘元雪,黄沦海,等. 环保型傍山隧道结构研究[J]. 中国公路学报,2006,19(1):80–83.(JIANG Shuping,LIU Yuanxue,HUANG Lunhai,et al. Research on environmental structure of tunnel adjacent to mountain[J]. China Journal of Highway and Transport,2006,19(1):80–83.(in Chinese))
[2] 刘元雪,蒋树屏. 环保型隧道结构优化与工程应用[J]. 后勤工程学院学报,2007,23(4):11–15.(LIU Yuanxue,JIANG Shuping. Optimizing and engineering practice of an environmental tunnel structure[J]. Journal of Logistical Engineering University,2007,23(4):11–15.(in Chinese))
[3] 何思明,李新波. 高切坡半隧道超前支护结构研究[J]. 岩石力学与工程学报,2008,27(2):3 827–3 832.(HE Siming,LI Xinpo. Study on pre-reinforced half-tunnel structure in high cut slope[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(2):3 827– 3 832.(in Chinese))
[4] 王建设. 半明半暗公路隧道施工技术[J]. 铁道标准设计,2007,(6):107–109.(WANG Jianshe. Construction technology of half-dark highway tunnel[J]. Railway Standard Design,2007,(6):107–109.(in Chinese))
[5] 李新航. 灵西隧道明拱暗墙进洞施工[J]. 铁道建筑技术,2003,(4):47–49.(LI Xinhang. Portal excavation of Lingxi tunnel by open arch and subsurface wall[J]. Railway Construction Technology,2003,(4):47–49.(in Chinese))
[6] 赖锦兴,陈晓钜. 坑面兰进口“一暗一明”连拱隧道方案[J]. 公路,2003,(11):126–129.(LAI Jinxing,CHEN Xiaoju. Double-arched tunnel scheme of portal excavation of Lingxi tunnel by open arch and subsurface wall[J]. Highway,2003,(11):126–129.(in Chinese))
[7] 余 飞,陈善雄,陈修和,等. 透肋式拱梁隧道结构分析[J]. 岩石力学与工程学报,2009,28(10):2 039–2 047.(YU Fei,CHEN Shanxiong,CHEN Xiuhe,et al. Structural analysis of permeable tunnel with ribbed arch beam[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(10):2 039–2 047.(in Chinese))
[8] DASARI G R,RAWLINGS C G,BOLTON M D. Numerical modelling of a NATM tunnel construction in London clay[C]// Geotechnical Aspects of Underground Construction in Soft Ground. Balkema,London,U K:[s.n.],1996:491–496.
[9] ORESTE P P,PEILA D,POMA A. Numerical study of low depth tunnel behaviour[C]// World Tunnel Congress on Challenges for the 21st Century. Balkema. Oslo,Norway:[s.n.],1999:155–162.
[10] SWOBODA G,ABU-KRISHA A. Three-dimensional numerical modeling for TBM tunneling in consolidated clay[J]. Tunneling and Underground Space Technology,1999,14(3):327–333.
[11] FARIAS M M,HENRIQUE A. Displacement control in tunnels excavated by the NATM:3D numerical simulations[J]. Tunneling and Underground Space Technology,2004 (19):283–293.
[12] 陆文超,钟 政,王 旭. 浅埋隧道围岩应力场的解析解[J]. 力学季刊,2003,24(1):50–54.(LU Wenchao,ZHONG Zheng,WANG Xu. Analytical solution for stress field in surrounding rocks of shallow tunnel[J]. Chinese Quarterly of Mechanics,2003,24(1):50–54.(in Chinese))
[13] 房营光,孙 钧. 地面荷载下浅埋隧道围岩的黏弹性应力和变形分析[J]. 岩石力学与工程学报,1998,17(3):239–247.(FANG Yingguang,SUN Jun. Analysis of visco-elastic stress and deformation of surrounding rocks for shallow tunnel under ground load[J]. Chinese Journal of Rock Mechanics and Engineering,1998,17(3):239–247.(in Chinese))
[14] 傅鹤林,韩汝才,朱汉华. 破碎围岩中单拱隧道荷载计算的理论解[J]. 中南大学学报:自然科学版,2004,35(3):478–483.(FU Helin,HAN Rucai,ZHU Hanhua. Theoretical load solution of single tunnel inside broken rockmass[J]. Journal of Central South University:Science and Technology,2004,35(3):478–483.(in Chinese))
[15] 蒋树屏,李建军. 公路隧道前置式洞口工法的三维数值分析[J]. 岩土工程学报,2007,29(4):484–489.(JIANG Shuping,LI Jianjun. 3D simulation and analysis of highway tunnels by use of advanced entrance construction method[J]. Chinese Journal of Geotechnical Engineering,2007,29(4):484–489.(in Chinese))
[16] 伍毅敏,王 飞,邹正明,等. 半明半暗隧道洞口段力学特征分析与现场监测[J]. 岩石力学与工程学报,2008,27(增1):2 873– 2 882.(WU Yimin,WANG Fei,ZOU Zhengming,et al. Mechanical character analysis and in-situ monitoring for portal section of half-buried tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(Supp.1):2 873–2 882.(in Chinese))
[17] 毕继红,钟建辉,丛 蓉. 浅埋洞室围岩压力有限元分析[J]. 铁道工程学报,2004,(4):77–81.(BI Jihong,ZHONG Jianhui,CONG Rong. The surrounding rock stress in shallow underground openings[J]. Journal of Railway Engineering Society,2004,(4):77–81.(in Chinese))
[18] 王戍平. 破碎围岩隧道的模拟试验研究[博士学位论文][D]. 杭州:浙江大学,2004.(WANG Shuping. Model test study on the tunnel within cracked surrounding rocks[Ph. D. Thesis)[D]. Hangzhou:Zhejiang University,2004.(in Chinese))
[19] 王 兵,谢锦昌.偏压隧道模型试验及可靠度分析[J]. 工程力学,1998,15(1):85–92.(WANG Bing,XIE Jinchang. Model test and reliability analysis for an unsymmetrically loaded tunnel[J]. Engineering Mechanics,1998,15(1):85–92.(in Chinese))
[20] 周 博. 通透肋式拱梁隧道变形规律分析与结构荷载简化模型[硕士学位论文][D]. 武汉:中国科学院武汉岩土力学研究所,2008.(ZHOU Bo. Analysis of deformation laws of drafty tunnel with ribbed arch beam and simplified model of structural load[M. S. Thesis)[D]. Wuhan:Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,2008.(in Chinese)) |
|
|
|