Abstract Based on the construction need of shield cutting 14 large-diameter bridge piles in Suzhou subway,the field test of shield cutting two 1 200 mm diameter piles was carried out;the effect and mechanism of cutting piles,characteristics of cutting parameters and damage law of cutting tools were analyzed. Then,the feasibility and key technology of cutting large-diameter piles were studied. The test results show that shell cutter can be fit for cutting pile directly;it breaks concrete by the way of shear cutting and laterally squeezing to fracture;and its working mechanism of cutting rebar is shear cutting. The wrapped condition of rebar by surrounding concrete is the key factor determining whether rebar could be cut off effectively. The thrust value and torque value which acting on the pile have an approximately linear relationship with penetration. The alloys of cutting tools are easily cracked because of great fluctuation amplitude of advancing speed. Cutting side pile produces more damage on cutting tools than cutting central pile. According to test results,the configuration scheme of advancing shell cutter and the concept of cutting rebar with different times were presented;the setting value of advancing speed was suggested against exceeding 2 mm/min,and the cutterhead should rotate with medium speed. The test results were successfully applied to the Suzhou cutting piles engineering;the test and engineering practice jointly indicate that shield cutting large-diameter piles directly is feasible.
|
|
Received: 20 February 2013
|
|
|
|
| [1] 刘建卫. 盾构穿越城市建(构)筑物桩基的施工技术研究[J]. 铁道标准设计,2010,(2):113–118.(LIU Jianwei. Construction technology for shielding passing through pile foundation of urban buildings[J]. Railway Standard Design,2010,(2):113–118.(in Chinese))
[2] 朱逢斌,杨 平,林水仙. 盾构隧道施工对邻近承载桩基影响研究[J]. 岩土力学,2010,31(12):3 894–3 900.(ZHU Fengbin,YANG Ping,LIN Shuixian. Study of influence of shield tunneling on neighboring loaded piles[J]. Rock and Soil Mechanics,2010,31(12):3 894–3 900.(in Chinese))
[3] PANG C H,YONG K Y,CHOW Y K,et al. The response of pile foundations subjected to shield tunneling[C]// Proceedings of the 5th International Conference of TC28 of the ISSMGE. Netherlands:Business Press,2006:737–743.
[4] 岳鹏飞,戴 泉,何 炬. 盾构施工下穿建筑桩基的影响研究[J]. 铁道标准设计,2012,(3):77–79.(YUE Pengfei,DAI Quan,HE Ju. Study on the effects of shield construction crossing below building pile foundation[J]. Railway Standard Design,2012,(3):77–79.(in Chinese))
[5] 刘 勇,何振华,李 忠. 苏州轨道交通一号线盾构区间通过桥桩的方案设计[J]. 隧道建设,2007,27(3):51–55.(LIU Yong,HE Zhenhua,LI Zhong. Design of solutions for shield-driven running tunnel crossing bridge piles:case study on a shield-driven running tunnel on line 1 of Suzhou mass rapid transit system[J]. Tunnel Construction,2007,27(3):51–55.(in Chinese))
[6] 徐前卫,朱合华,马险峰,等. 地铁盾构隧道穿越桥梁下方群桩基础的托换与除桩技术研究[J]. 岩土工程学报,2012,34(7):1 217–1 226.(XU Qianwei,ZHU Hehua,MA Xianfeng,et al. Pile underpinning and removing technology of shield tunnels crossing through group pile foundations of road bridges[J]. Chinese Journal of Geotechnical Engineering,2012,34(7):1 217–1 226.(in Chinese))
[7] 孙立宝,王云春. 套管钻进拔桩法及其工程应用[J]. 探矿工程:岩土钻掘工程,2009,36(9):59–63.(SUN Libao,WANG Yunchun. Casing drilling in abandoned pile removing and its engineering application[J]. Exploration Engineering:Rock and Soil Drilling and Tunneling,2009,36(9):59–63.(in Chinese))
[8] 杜闯东. 侵入盾构隧道桩基人工挖孔处理技术[J]. 隧道建设,2009,29(2):222–226.(DU Chuangdong. Technology of treatment of pile foundations intruding into shield tunnel by means of manual-cut borehole method[J]. Tunnel Construction,2009,29(2):222–226.(in Chinese))
[9] 滕 丽. 盾构穿越地下障碍物的试验研究[J]. 建筑机械化,2011,32(10):89–91.(TENG Li. Experimental studies on shield through underground obstacles[J]. Construction Mechanization,2011,32(10):89–91.(in Chinese))
[10] 杨自华,钟志全. 泥水盾构穿越桩基础掘进施工[J]. 建筑机械化,2007,28(9):51–53.(YANG Zihua,ZHONG Zhiquan. Construction of driving through pile foundation with slurry shield machine[J]. Construction Mechanization,2007,28(9):51–53.(in Chinese))
[11] 王 虹,鞠世健. 盾构穿越建筑物桩基群的施工技术[J]. 广东建材,2006,(7):71–73.(WANG Hong,JU Shijian. Construction technology of shield passing through building piles foundation[J]. Guangdong Building Materials,2006,(7):71–73.(in Chinese))
[12] 傅德明,李毕华,马忠政. 软土盾构直接切削钢筋混凝土桩基施工技术[J]. 中国市政工程,2010,(4):46–47.(FU Deming,LI Bihua,MA Zhongzheng. Construction technique of soft soil shield cutting directly reinforced concrete pile foundation[J]. China Municipal Engineering,2010,(4):46–47.(in Chinese))
[13] 符 敏. 盾构穿越厂房切削钢筋混凝土桩基施工技术[J]. 建筑机械,2010,(7):90–91.(FU Min. Shield-driven machine passed through foundation of factory building with construction technology of cutting reinforced concrete pile[J]. Construction Machinery,2010,(7):90–91.(in Chinese))
[14] 郑 坚. 穿越桩基础的盾构机改造技术[J]. 建筑施工,2010,32(5):391–393.(ZHENG Jian. Renovation technology for TBM passing through pile foundation[J]. Building Construction,2010,32(5):391–393.(in Chinese))
[15] 竺维彬,韩世健. 地铁盾构施工风险源及典型事故的研究[M]. 广州:暨南大学出版社,2009:111–114.(ZHU Weibin,HAN Shijian. Studies on construction risk source and typical accident of metro shield[M]. Guangzhou:Jinan University Press,2009:111–114.(in Chinese))
[16] 侯克忠,白佳声,盛林峰,等. 盾构掘进机用特种刀具的研究与制备[J]. 硬质合金,2009,26(1):24–28.(HOU Kezhong,BAI Jiasheng,SHENG Linfeng,et al. Study and preparation on the special tool of tunneling shield[J]. Cemented Carbide,2009,26(1):24–28. (in Chinese))
[17] 陈日曜. 金属切削原理[M]. 广州:机械工业出版社,2012:36–43.(CHEN Riyao. Metal cutting mechanism[M]. Guangzhou:China Machine Press,2012:36–43.(in Chinese))
[18] 李国和,王敏杰,段春争,等. 基于ANSYS/LS-DYNA的金属切削过程有限元模拟[J]. 农业机械学报,2007,26(1):24–28.(LI Guohe,WANG Minjie,DUAN Chunzheng,et al. Finite element simulation of the process of orthogonal metal cutting based on the ANSYS/LS-DYNA[J]. Transactions of the Chinese Society for Agricultural Machinery,2007,26(1):24–28.(in Chinese)) |
|
|
|