LABORATORY TEST ON SHIELD TUNNELING IN LOESS STRATA
HE Chuan1,2,LI Xun1,2,JIANG Yingchao1,2,FANG Yong1,2,TAN Zhun1,2
(1. Key Laboratory of Transportation Tunnel Engineering,Ministry of Education,Southwest Jiaotong University,Chengdu,Sichuan 610031,China;2. School of Civil Engineering,Southwest Jiaotong University,Chengdu,Sichuan 610031,China)
Download: PDF (717 KB)   HTML (1 KB) 
Export: BibTeX | EndNote (RIS)      
Abstract  Loess is a typical structured soil,and its strength is closely related to the characteristics of soil structure. The stability of working face is significantly affected by the shield construction parameters in loess strata. Soils around the working face tend to become loose and even collapse if the earth pressure is not properly controlled,which would lead to problems of tunnel structure safety and surrounding environments. Focusing on Xi?an metro line 2(the first metro constructed in loess strata in China),the paper carried out laboratory test to study ground disturbance induced by shield tunneling and the relationship of the shield construction key parameters in loess strata using the independently designed earth pressure balanced model shield machine. Also,the ground loss ratio K and width parameter of surface settlement trough i in loess strata are obtained. The results show that the shape of settlement curve in transverse section caused by shield tunneling in loess strata is different from that in cohesive soil,which shows the curve is deep V-shaped in lower part and palliative peviform in upper part. The development of surface settlement is mutable and three stages can be observed. The change of thrust force leads to the change in earth pressure directly,and the earth pressure and unearthed rate are somewhat randomly distributed. The unearthed rate has a decrease trend with the increase of thrust force,whilst there is an inversely-proportional relationship between advance speed and unearthed rate.
Key wordstunneling engineering      shield tunnel      loess strata      soil disturbance      construction parameters      laboratory test     
Received: 02 May 2013     
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
Cite this article:   
URL:  
http://www.rockmech.org/EN/Y2013/V32/I9/1736
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号