|
|
|
| CORRECTION OF RMR SYSTEM AND ITS ENGINEERING APPLICATION |
| WANG Lehua,LI Jianrong,LI Jianlin,WANG Kongwei,XU Xiaoliang,WAN Liangpeng |
(Key Laboratory of Geological Hazards on Three Gorges Reservoir Area of Ministry of Education,China Three Gorges
University,Yichang,Hubei 443002,China) |
|
|
|
|
Abstract The three indices of uniaxial compressive strength,RQD value and structural face interval in the existing RMR method evaluation system aim at the grading value of a interval,and are all applied to engineering with the conservative values. By selecting a large number of rock quality evaluation data related to the present engineering projects,the grading standard of the three indices is studied and their grading intervals are corrected.
The characteristic of nonlinear step changes of the grading values is corrected,which makes the grading values become linear and continuous. The linear relationship expression between the indices value and grading value is built. The corrected results are applied to the actual projects and get good effect,which can provide a certain reference for the rock mass quality evaluation and the engineers.
|
|
Received: 13 August 2012
|
|
|
|
| [1] BARTON N,GRIMSTAD E. Rock mass conditions dictate choice between NMT and NATM[J]. Tunnels and Tunneling,1994,26(10):39–42.
[2] 陈昌彦,王贵荣. 各类岩体质量评价方法的相关性探讨[J]. 岩石力学与工程学报,2002,21(12):1 894–1 900.(CHEN Changyan,WANG Guirong. Discussion on the interrelation of various rock mass quality classification systems at home and abroad[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(12):1 894–1 900. (in Chinese))
[3] 李晓斌,马 斌,王吉成. 岩体工程地质分类评价方法[J]. 西部探矿工程,2009,(12):13–15.(LI Xiaobin,MA Bin,WANG Jicheng. Rock engineering geological classification of evaluation methods[J]. West Exploration Engineering,2009,(12):13–15.(in Chinese))
[4] 王瑞红,李建林,蒋昱州,等. 考虑岩体开挖卸荷边坡岩体质量评价[J]. 岩土力学,2008,29(10):2 741–2 746.(WANG Ruihong,LI Jianlin,JIANG Yuzhou,et al. Quality evaluation of unloaded slope rock mass[J]. Rock and Soil Mechanics,2008,29(10):2 741–2 746. (in Chinese))
[5] WANG L H,LI J L,DENG H F,et al. Evaluation of rock mass quality and its application[C]// ISRM International Symposium 2006,the 4th Asian Rock Mechanics Symposium,Rock Mechanics in Underground Construction. Singapore:[s. n.],2006:282.
[6] ROMANA M. SMR Classification[C]// Proceedings of the 7th International Congress on Rock Mechanics. [S. l.]:[s. n.],1991:955–960.
[7] ROMANA M. Practice of SRM classification for slop appraisal[C]// Proceedings of the 5th International Symposium on Landslides. [S. l.]:[s. n.],1998:1 227–1 231.
[8] 李胜伟,李天斌,王兰生. 边坡岩体质量分类体系的CSMR法及应用[J]. 地质灾害与环境保护,2001,12(2):69–72.(LI Shengwei,LI Tianbin,WANG Lansheng. Application of the CSMR system for slope stability evaluation[J]. Journal of Geological Hazards and Environment Preservation,2001,12(2):69–72.(in Chinese))
[9] LAUBSCHER D H. Geomechanics classification of jointed rock masses-mining application[J]. Transactions of the Institution of Metal Mines,1977,86(5):A1–A8.
[10] LAUBSCHER D H. Design aspects and effectiveness of support systems in different mining conditions[J]. Transactions of the Institution of Metal Mines,1984,93:A70–A82.
[11] CUMMINGS R A,KENDORSKI F S,BIENIAWSKI Z T. Caving rock mass classification and support estimation[R]. Chicago:US Bureau of Mines,1982.
[12] 谢本贤,陈沅江,史秀志. 深部岩体工程围岩质量评价的IRMR法研究[J]. 中南大学学报:自然科学版,2007,38(5):987–992. (XIE Benxian,CHEN Yuanjiang,SHI Xiuzhi. IRMR method for evaluation of surrounding rock quality in deep rock mass engineering[J]. Journal of Central South University:Science and Technology,2007,38(5):987–992.(in Chinese))
[13] 刘业科,曹 平,衣永亮,等. 基于地下深部工程岩体特性的RMR系统修正[J]. 中南大学学报:自然科学版,2010,41(4):1 497–1 505.(LIU Yeke,CAO Ping,YI Yongliang,et al. Revised RMR system on underground deep engineering rock mass property[J]. Journal of Central South University:Science and Technology,2010,41(4):1 497–1 505.(in Chinese))
[14] BIENIASKI Z T. Engineering classification of jointed rock masses[J]. Transaction of the South African Institution of Civil Engineering,1973,15(12):335–344.
[15] BIENIAWSKI Z T. Engineering rock mass classification[M]. New York:Science Press,1989:180–250.
[16] 李建林,王乐华,刘 杰,等. 岩石边坡工程[M]. 北京:中国水利水电出版社,2006:67–71.(LI Jianlin,WANG Lehua,LIU Jie,et al. Rock slope engineering[M]. Beijing:China Water Power Press,2006:67–71.(in Chinese))
[17] 陈近中. 双江口电站工程岩体质量分级研究[博士学位论文][D]. 成都:成都理工大学,2007.(CHEN Jinzhong. Engineering rock mass classification of Shuangjiangkou hydroelectric station[Ph. D. Thesis][D]. Chengdu:Chengdu University of Technology,2007.(in Chinese))
[18] 文志兵. 澜沧江糯扎渡水电站右岸复杂质量岩体分类与工程效应研究[博士学位论文][D]. 成都:成都理工大学,2002.(WEN Zhibing. Rock mass quality classification and engineering effect study of complicated rock mass at the right dam foundation of Nuozadu hydraulic-power station in Lancang River[Ph. D. Thesis][D]. Chengdu:Chengdu University of Technology,2002.(in Chinese))
[19] 黄昌乾,范建军,丁恩保. 边坡岩体质量分类的SMR法及其应用实例[J]. 岩土工程技术,1998,(1):7–13.(HUANG Changqian,FAN Jianjun,DING Enbao. SMR method and application examples of the slope rock mass quality classification[J]. Geotechnical Engineering Technique,1998,(1):7–13.(in Chinese))
[20] 陈祖煜,汪小刚,杨 健,等. 岩质边坡稳定性分析——原理、方法、程序[M]. 北京:中国水利水电出版社,2005:270–279,353–354,497–503.(CHEN Zuyu,WANG Xiaogang,YANG Jian,et al. Rock slope stability analysis—theory,methods,and programs[M]. Beijing:China Water Power Press,2005:270–279,353–354,497–503.(in Chinese))
[21] 张绍民,刘丰收,毕晓东. 工程岩体分类方法在小浪底工程中的应用[J]. 岩土力学,2007,28(11):2 480–2 484.(ZHANG Shaomin,LIU Fengshou,BI Xiaodong. Application of rock mass classification to Xiaolangdi multi-purpose project[J]. Rock and Soil Mechanics,2007,28(11):2 480–2 484.(in Chinese))
[22] 王乐华,李建林,邓华锋,等. 岩体质量评价及其在锦屏电站工程中的应用[C]// 第九届全国岩石力学与工程学术大会论文集. 北京:科学出版社,2006:722–727.(WANG Lehua,LI Jianlin,DENG Huafeng,et al. Evaluation of rock mass quality and its application in Jinping engineering[C]// Proceedings of the 9th Academic Meeting Thesis of Chinese Rock Mechanics and Engineering. Beijing:Science Press,2006:722–727.(in Chinese))
[23] 李攀峰,张倬元,陶连金. 西南某水电站地下厂房岩体质量分级研究[J]. 水电站设计,2003,19(2):71–73.(LI Panfeng,ZHANG Zhuoyuan,TAO Lianjin. An underground power plant of the Southwest rock quality classification[J]. Hydropower Station Design,2003,19(2):71–73.(in Chinese))
[24] 周志东,胡卸文,张倬元,等. 西南某水电站坝肩岩体质量分级方法选取探讨[J]. 成都理工学院学报,1999,26(1):82–85.(ZHOU Zhidong,HU Xiewen,ZHANG Zhuoyuan,et al. Discussion on the selection of rock mass quality classification of a hydroelectric power station abutments[J]. Journal of Chengdu University of Technology,1999,26(1):82–85.(in Chinese))
[25] 韩爱果,聂德新. 某电站地下厂房围岩质量综合分级[J]. 地质灾害与环境保护,2002,13(2):75–78.(HAN Aiguo,NIE Dexin. Synthetical quality classification of the surrounding rock of the underground building in a hydropower station[J]. Journal of Geological Hazards and Environment Preservation,2002,13(2):75–78.(in Chinese))
[26] 刘振红,王学潮,王泉伟,等. 南水北调西线工程隧洞围岩分类和变形分析[J]. 岩石力学与工程学报,2005,24(20):3 625–3 630. (LIU Zhenhong,WANG Xuechao,WANG Quanwei,et al. Classification and deformation analysis of tunnel surrounding rock in West Route of South-to-North Water[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(20):3 625–3 630.(in Chinese))
[27] 李建林,哈秋聆. 三峡工程永久船闸高边坡岩体RMR分类及其应用[C]// 岩石力学理论与实践. 刘汉东编. 郑州:黄河出版社,1997:222–230.(LI Jianlin,HA Qiuling. Three Gorges Project permanent ship lock high slope rock RMR classification and its application[C]// Rock Mechanics Theory and Practice. LIU Handong ed. Zhengzhou:Huanghe Press,1997:222–230.(in Chinese))
[28] 王远高. 会泽铅锌矿8号矿体岩体质量评价[J]. 采矿技术,2008,8(2):19–20.(WANG Yuangao. The eighth orebody rock quality evaluation of Huize Pb-Zn[J]. Mining Technology,2008,8(2):19–20.(in Chinese))
[29] 胡万宏,冯志宏. 会泽铅锌矿深部矿岩岩体质量评价分析[J]. 采矿技术,2009,9(1):76–77.(HU Wanhong,FENG Zhihong. The deep orebody rock quality evaluation of Huize Pb-Zn[J]. Mining Technology,2009,9(1):76–77.(in Chinese)).
[30] 陈向华,张世奎,唐绍辉,等. 对会泽铅锌矿深部10号矿体岩体质量的评价[J]. 矿业研究与开发,2002,22(2):8–10.(CHEN Xianghua,ZHANG Shikui,TANG Shaohui,et al. The deep tenth orebody rock quality evaluation of Huize Pb-Zn[J]. Mining Research and Development,2002,22(2):8–10.(in Chinese))
[31] 潘国强. 禹登高速公路槐树坪隧道岩体质量评价研究[J]. 公路工程,2007,32(6):141–145.(PAN Guoqiang. Investigation and analysis of rock quality evaluate in Huaishuping tunnel of Yu-Deng freeway[J]. Highway Engineering,2007,32(6):141–145.(in Chinese))
[32] 舒 畅,段辉杰,周 俊. 某矿山边坡岩体结构及围岩质量评价[J]. 土工基础,2007,21(1):41–43.(SHU Chang,DUAN Huijie,ZHOU Jun. A study on rock mass structure feature and surrounding rock ranking for a mine slope[J]. Soil Eng and Foundation,2007,21(1):41–43.(in Chinese))
[33] 王明华,白 云,张电吉. 矿山边坡岩体结构及围岩质量评价[J]. 矿业工程,2006,4(3):21–22.(WANG Minghua,BAI Yun,ZHANG Dianji. A study on rock mass structure feature and surrounding rock ranking for an ore slope[J]. Mining Engineering,2006,4(3):21–22.(in Chinese))
[34] 中华人民共和国行业标准编写组. 工程岩体分级标准[S]. 北京:中华人民共和国水利部,1995:7.(The Professional Standards Compilation Group of People?s Republic of China. Classification Criterion of Engineering Rocks[S]. Beijing:Ministry of Water Resources of People?s Republic of China,1995:7.(in Chinese)) |
|
|
|