Citation Search Quick Search
  2013, Vol. 32 Issue (s2): 3636-3642    DOI:
Artiles Current Issue | Archive | Adv Search |
STABILITY CONTROL OF ULTRA SHALLOW-BURIED METRO TUNNEL WITH SUPER LARGE-SPAN IN PROCESS OF CROSSING BRIDGE
LI Dong1,2,3,HE Xingling1, QIN Le1,KANG Yong2,4,ZHOU Dongping1,3,GUO Chenye1,3
(1. Science and Technology Co.,Ltd.,Chongqing Energy Investment Group,Chongqing 400060,China;2. State Key Laboratory of Coal Mine Disaster Dynamics and Control,Chongqing University,Chongqing 400030,China;3. Chongqing Enterprise Engineering Research Center of CBM exploration,Chongqing 401121,China;4. School of Power and Mechanical Engineering, Wuhan University,Wuhan,Hubei 430072,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号