[1] |
谷兆祺,彭守拙,李仲奎. 地下洞室工程[M]. 北京:清华大学出版社,1994:87-95.(GU Zhaoqi,PENG Shouzhuo,LI Zhongkui. Underground cavernengineering[M].Beijing:Tsinghua University Press,1994:87-95.(in Chinese))
|
[2] |
杨 静,何江达,王开云. 水电站地下厂房岩锚吊车梁三维非线性有限元分析[J]. 四川大学学报:工程科学版,2003,35(2):31-34.(YANG Jing,HE Jiangda,WANG Kaiyun.Three-dimensional nonlinear analysis on rock-anchored beam of underground house of hydro-power station[J]. Journal of Sichuan University:Engineering Science,2003,35(2):31-34.(in Chinese))
|
[3] |
陆晓敏,刘春霞. 地下厂房岩壁吊车梁的力学分析及设计[J]. 河海大学学报:自然科学版,2007,35(1):30-34.(LU Xiaomin,LIU Chunxia. Mechanical analysis and design of crane beam onrock wall for underground power house[J].Journal of Hohai University:Natural Science,2007:35(1):30-34.(in Chinese))
|
[4] |
杨春鸣,郑旭荣,王旭芳. 地下厂房岩锚吊车梁结构稳定计算的研究现状[J]. 水资源与水工程学报,2008,19(4):65-68.(YANG Chunming,ZHENGXurong,WANG Xufang. Current situation research on calculation of structural stability for the rock-bolted crane girder in the underground house[J]. Journal of Water Resources and Water Engineering,2008,19(4):65-68.(in Chinese))
|
[5] |
朱伯芳. 有限单元法原理与应用[M]. 北京:中国水利水电出版社,1998:293-296.(ZHU Baifang.Finite element principle and application[M]. Beijing:China WaterPower Press,1998:293-296. (in Chinese))
|
[6] |
肖 明,陈俊涛,袁金亮. 复杂地质条件下岩锚吊车梁结构三维数值分析[J]. 岩石力学与工程学报,2003,22(1):2 294-2 298.(XIAO Ming,CHEN Juntao,YUAN Jinliang. Three-dimensional numerical analysis of crane beam with rock bolt under complex geological condition[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(1):2 294-2 298.(in Chinese))
|
[7] |
徐彬,李宁. 水电站地下厂房岩锚吊车梁稳定性分析剖析[J]. 水力发电学报,2007,26(2):47-53.(XU Bin,LI Ning.Analysis ofrock-bolt crane girder in underground powerhouse[J].Journal of Hydroelectric Engineering,2007,26(2):47-53.(in Chinese))
|
[8] |
冀健红,肖明. 岩锚吊车梁结构稳定的数值计算分析[J]. 长江科学院院报,2007,24(4):67-71.(JIJianhong,XIAO Ming.Numerical analysis on stability of rock-anchored crane beam[J]. Journal of Yangtze River Scientific Research Institute,2007,24(4):67-71.(in Chinese))
|
[9] |
刘进宝,刘迎曦,李守巨. 岩锚吊车梁轮压效应的三维有限元数值分析[J]. 水利水电技术,2004,35(9):54-58.(LIU Jinbao,LIU Yingxi,LI Shouju.Three-dimensional finite element numerical analysis of the effect caused by wheel loading of rock bolt crane girder[J].Water Resources and Hydropower Engineering,2004,35(9):54-58.(in Chinese))
|
[10] |
马震岳,凌 影,金长宇,等. 某水电站地下厂房岩锚吊车梁三期浇筑可行性分析[J]. 水电能源科学,2010,28(3):66-69.(MA Zhenyue,LING Ying,JIN Changyu,et al.Third phase pouring feasibility analysis of crane beam on rock anchor for underground powerhouse of hydropower station[J]. Water Resource and Power,2010,28(3):66-69.(in Chinese))
|
[11] |
邱祥波,李术才,李树忱. 三维地应力回归分析方法与工程应用[J]. 岩石力学与工程学报,2003,22(10):1 613-1 617.(QIU Xiangbo,LI Shucai,LI Shuchen. 3D geostress regression analysis method and itsapplication[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(10):1 613-1 617.(in Chinese))
|
[12] |
张建海,何江达. 小湾高拱坝三维有限元弹塑性分析[J]. 云南水力发电,2000,16(1):61-64.(ZHANG Jianhai,HE Jiangda. 3D elastoplastic analysis of Xiaowan arch dam[J].Yunnan Water Power,2000,16(1):61-64.(in Chinese))
|
[13] |
张学言,闫澍旺. 岩土塑性力学基础[M]. 天津:天津大学出版社,2006:59-60.(ZHANG Xueyan,YAN Shuwang.Geotechnical plastic mechanics[M].Tianjin:Tianjin University Press,2006:59-60.(in Chinese))
|
[14] |
胡著秀,张建海,周 钟,等. 锦屏一级高拱坝坝基加固效果分析[J]. 岩土力学,2010,31(9):2 861-2 868.(HU Zhuxiu,ZHANG Jianhai,ZHOU Zhong,et al. Analysis of stress and deformation of Jinping I high arch dam after foundation reinforcement[J].Rock and Soil Mechanics,2010,31(9):2 861-2 868.(in Chinese))
|
[15] |
李广信. 高等土力学[M]. 北京:清华大学出版社,2004:159-160. (LI Guangxin.Advanced soil mechanics[M].Beijing:Tsinghua University Press,2004:159-160.(in Chinese))
|