| ANALYSIS AND EVALUATION SYSTEM OF RAPID MONITORING OF LARGE-SCALE UNDERGROUND CAVERN GROUP DURING CONSTRUCTION PERIOD IN SOUTHWEST CHINA |
| CAI Dewen1,2,WANG Dikai1,2,CHEN Xiaopeng1,2 |
| (1. PowerChina Chengdu Engineering Corporation Limited,Chengdu,Sichuan 610072,China;2. Large-scale Underground Engineering Affiliation,National Hydropower Technology Research and Development Center,Chengdu,Sichuan 610072,China) |
|
|
|
|
Abstract The typical geomorphic features of high mountains and deep canyons and the regional high geostress conditions lead to the engineering complexity and the difficulty of construction of the large-scale underground cavern groups for hydropower stations beyond the scope of present knowledge. Utilizing the massive monitored data from the safety monitoring with the scale in ever expansion,an analysis and evaluation system of the rapid monitoring of large-scale underground caverns in the Southwest China was established by means of the monitoring softwares. The evaluation of the stability of surrounding rock of caverns and the design of the construction process of cavern group of the underground powerhouse can be carried out with the system,so as to ensure the stability of surrounding rock and the safety operation of the underground caverns. Through the statistical analysis of a large number of monitored data,five displacement evaluation indices and five supporting load evaluation indices were proposed to monitor the stability of surrounding rock in the system. Relating the grading of evaluation indices for the grading of surrounding rock stability,the stability evaluation of the surrounding rock in underground caverns can be obtained rapidly. The evaluation system was applied to the subsequent construction of caverns and was proved appropriate.
|
|
Received: 26 June 2014
|
|
|
|
| [1] 王思敬,杨志法,刘竹华. 地下工程岩体稳定分析[M]. 北京:科学出版社,1984:73–88.(WANG Sijing,YANG Zhifa,LIU Zhuhua. Stability analysis of rock mass in underground engineering[M]. Beijing:Science Press,1984:73–88.(in Chinese))
[2] 孙广忠. 岩体结构力学[M]. 北京:科学出版社,1988:139–168.(SUN Guangzhong. Rock mass structure mechanics[M] .Beijing:Science Press,1988:139–168.(in Chinese))
[3] 谷兆祺,彭守拙,李仲奎. 地下洞室工程[M]. 北京:清华大学出版社,1994:1–219.(GU Zhaoqi,PENG Shouzhuo,LI Zhongkui. Underground caverns engineering[M]. Beijing:Tsinghua University Press,1994:1–219.(in Chinese))
[4] 吴文平,冯夏庭,张传庆,等. 深埋硬岩隧洞围岩的破坏模式分类与调控策略[J]. 岩石力学与工程学报,2011,30(9):1 782–1 802. (WU Wenping,FENG Xiating,ZHANG Chuanqing,et al. Classification of failure modes and controlling measures for surrounding rock of deep tunnel in hard rock[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(9):1 782–1 802.(in Chinese))
[5] 李仲奎,周 钟,汤雪峰,等. 锦屏一级地下厂房洞室群稳定性分析与思考[J]. 岩石力学与工程学报,2009,28(11):2 167–2 175.(LI Zhongkui,ZHOU Zhong,TANG Xuefeng,et al. Stability analysis and considerations of underground powerhouse caverns group of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(11):2 167–2 175.(in Chinese))
[6] 魏进兵,邓建辉,王俤剀,等. 锦屏一级水电站地下厂房围岩变形与破坏特征分析[J]. 岩石力学与工程学报,2010,29(6):1 198– 1 205.(WEI Jinbing,DENG Jianhui,WANG Dikai,et al. Characterization of deformation and fracture for rock mass in underground powerhouse of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(6):1 198–1 205.(in Chinese))
[7] 周 钟,巩满福,侯东奇,等. 四川省雅砻江锦屏一级水电站地下厂房洞室群施工期围岩稳定与支护设计报告(4)[R]. 成都:中国水电顾问集团成都勘测设计研究院,2008.(ZHOU Zhong,GONG Manfu,HOU Dongqi,et al. Report on surrounding rock mass stability and support design for underground powerhouse caverns group
construction of Jinping I hydropower project located on Yalong River(4)[R]. Chengdu:HydroChina Chengdu Engineering Corporation,2008.(in Chinese))
[8] 王克忠,李仲奎,包中坚. 水电站地下厂房层状围岩现场监测及稳定性研究[J]. 岩石力学与工程学报,2007,26(10):2 148–2 152. (WANG Kezhong,LI Zhongkui,BAO Zhongjian. Study of site monitoring and stability of layered surrounding rocks of underground powerhouses of hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(10):2 148–2 152.(in Chinese))
[9] 江 权,冯夏庭,苏国韶,等. 基于松动圈–位移增量监测信息的高地应力下洞室群岩体力学参数的智能反分析[J]. 岩石力学与工程学报,2007,26(增1):2 654–2 692.(JIANG Quan,FENG Xiating,SU Guoshao,et al. Intelligent back analysis of rock mass parameters for large underground caverns under high earth stress based on EDZ and increment displacement[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.1):2 654–2 692.(in Chinese))
[10] 张志国,肖 明. 地下洞室监测位移场的反演和围岩稳定评判分析[J]. 岩石力学与工程学报,2009,28(4):813–818.(ZHANG Zhiguo,XIAO Ming. Inversion of monitored displacement field and evaluation of surrounding rock stability of underground caverns[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(4):813–818.(in Chinese))
[11] 王明华,冯文凯,刘汉超,等. 溪洛渡水电站地下厂房岩体结构特征及围岩分类[J]. 山地学报,2003,21(1):101–105.(WANG Minghua,FENG Wenkai,LIU Hanchao,et al. A study of rock mass structure feature and surrounding rock ranking for Xiluodu hydroelectric power station[J]. Journal of Mountain Research,2003,21(1):101–105.(in Chinese))
[12] 彭 琦,王俤剀,邓建辉,等. 地下厂房围岩变形特征分析[J]. 岩石力学与工程学报,2007,26(12):2 583–2 587.(PENG Qi,WANG Dikai,DENG Jianhui,et al. Analysis of surrounding rock deformation characteristics in underground powerhouse[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(12):2 583–2 587.(in Chinese))
[13] 陈仲先,汤 雷. 高地应力大型地下洞室的位移和锚杆应力特性[J]. 岩土工程学报,2000,22(3):294–298.(CHEN Zhongxian,TANG Lei. Rock displacement and load of bolts around large-scale cavities with high stresses[J]. Chinese Journal of Geotechnical Engineering,2000,22(3):294–298.(in Chinese))
[14] 丁秀丽,董志宏,卢 波,等. 陡倾角沉积岩地层中大型地下厂房开挖围岩变形失稳特征和反馈分析[J]. 岩石力学与工程学报,2008,27(10):2 019–2 026.(DING Xiuli,DONG Zhihong,LU Bo,et al. Deformation characteristics and feedback analysis of surrounding rock of large underground powerhouses excavated in steeply dipped sedimentary rock strata[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(10):2 019–2 026.(in Chinese))
[15] 王俤剀,彭 琦,汤 荣,等. 地下厂房岩锚梁裂缝成因分析[J]. 岩石力学与工程学报,2007,26(10):2 125–2 129.(WANG Dikai,PENG Qi,TANG Rong,et al. Causes analysis of cracking of rock- bolted crane girder in an underground powerhouse[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(10):2 125–2 129.(in Chinese))
[16] 王 浩. 地下工程监测中的数据分析和信息管理、预测预报系统[博士学位论文][D]. 武汉:中国科学院武汉岩土力学研究所,2007. (WANG Hao. Data analysis and information management and prediction software system for underground engineering monitoring [Ph. D. Thesis][D]. Wuhan:Institute of Rock and Soil Mechanics, Chinese Academy of Sciences,2007.(in Chinese)) |
| [1] |
CHEN Weizhong1*, LIU Xinyu1, 2, YANG Jianping1, WANG Wei1, 2, ZANG Zhonghai3, DING Hongyuan3, ZHANG Zheyuan3, WANG Xiaogang3, SHI Zhengrong1. Development of a large-scale 3D physical model test system for underground energy storage caverns and its model experimental study[J]. , 2026, 45(6): 1615-1628. |
|
|
|
|