Abstract Because of the complexity of the urban environment and the variability of the geological conditions,it is very important and difficult to predict the ground deformation accurately. The process and mechanism of ground deformation were analyzed systematically from three aspects,the materials,the meso-structures and the environment of ground layers. Three typical kinds of meso-structures were put forward to describe the characteristics of complex ground conditions and correspondingly the methods of stability analysis were established. According to the designated type of ground meso-structure and its spatial relation to tunnel,the quantitative relationship between the stability of the meso-structure and the macroscopic ground deformation was established,which predicted accurately the ground deformation and the surface subsidence caused by the instability of meso-structure. A model of calculating the ground deformation due to the water table fall and the loss of water and sand was established. Together with the elasto-plastic deformation of ground,the total ground deformations were thus be obtained and were found to agree very well with the measured data.
|
|
Received: 13 May 2014
|
|
|
|
| [1] 张顶立. 城市地下工程建设安全风险及其控制[M]. 北京:化学工业出版社,2012:2–4.(ZHANG Dingli. Safety risks and corresponding control measures of urban underground engineering construction[M]. Beijing:Chemical Industry Press,2012:2–4.(in Chinese))
[2] 侯艳娟,张顶立,李鹏飞. 北京地铁施工安全事故分析及防治对策[J]. 北京交通大学学报,2009,33(3):52–59.(HOU Yanjuan,ZHANG Dingli,LI Pengfei. Analysis and control measures of safety accidents in Beijing subway construction[J]. Journal of Beijing Jiaotong University,2009,33(3):52–59.(in Chinese))
[3] 张成平,张顶立,王梦恕. 浅埋暗挖隧道施工引起的地表塌陷分析及其控制[J]. 岩石力学与工程学报,2007,26(增2):3 601–3 608. (ZHANG Chengping,ZHANG Dingli,WANG Mengshu. Analysis of ground subsidence induced by shallow-buried tunnel construction and its control techniques[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.2):3 601–3 608.(in Chinese))
[4] 张成平,张顶立,王梦恕,等. 城市隧道施工诱发的地面塌陷灾变机制及其控制[J]. 岩土力学,2010,31(增1):303–309.(ZHANG Chengping,ZHANG Dingli,WANG Mengshu,et al. Catastrophe mechanism and control technology of ground collapse induced by urban tunneling[J]. Rock and Soil Mechanics,2010,31(Supp.1):303–309.(in Chinese))
[5] CHOU W I,BOBET A. Predictions of ground deformations in shallow tunnels in clay[J]. Tunnelling and Underground Space Technology,2002,17(1):3–19.
[6] OSMAN A S,BOLTON M D,MAIR R J. Predicting 2D ground movements around tunnels in undrained clay[J]. Geotechnique,2006,56(9):597–604.
[7] 白明洲,许兆义,时 静,等. 复杂地质条件下浅埋暗挖地铁车站施工期地面沉降量FLAC3D分析[J]. 岩石力学与工程学报,2006,25(增2):4 254–4 260.(BAI Mingzhou,XU Zhaoyi,SHI Jing,et al. Analysis of ground settlement of a subway station undercut with shallow overburden during construction with FLAC3D under complex geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(Supp.2):4 254–4 260.(in Chinese))
[8] 王 霆,罗富荣,刘维宁,等. 地铁车站洞桩法施工对地层和刚性接头管线的影响[J]. 岩土力学,2011,32(8):2 533–2 538.(WANG Ting,LUO Furong,LIU Weining,et al. Influence of metro station construction by drift-pile-beam-arch method on soil and rigid-joint pipeline[J]. Rock and Soil Mechanics,2011,32(8):2 533–2 538.(in Chinese))
[9] FANG Q,ZHANG D,WONG L N Y. Environmental risk management for a cross interchange subway station construction in China[J]. Tunneling and Underground Space Technology,2011,(26):750–763.
[10] PECK R B. Deep excavations and tunneling in soft ground[C]// Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering. Mexico:[s.n.],1969:225–290.
[11] ATTEWELL P B,YEATES J,SELBY A R. Soil movements induced by tunneling and their effects on pipelines and structures[M]. Glasgow:Blackie,1986:10–50.
[12] 易小明,张顶立,逄铁铮,等. 城市隧道上覆地层整体下沉的力学机制分析[J]. 岩石力学与工程学报,2009,28(增1):2 860–2 867. (YI Xiaoming,ZHANG Dingli,PANG Tiezheng,et al. Mechanism analysis of integral subsidence of upper stratum in urban tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(Supp.1):2 860–2 867.(in Chinese))
[13] 张顶立,李鹏飞,侯艳娟,等. 浅埋大断面软岩隧道施工影响下建筑物[J]. 岩石力学与工程学报,2009,28(1):95–102.(ZHANG Dingli,LI Pengfei,HOU Yanjuan,et al. Experimental study on safety control of buildings during construction of shallow-buried soft rock tunnel with large-section[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(1):95–102.(in Chinese))
[14] 张顶立,黄 俊. 地铁隧道施工拱顶下沉值的分析与预测[J]. 岩石力学与工程学报,2005,24(10):1 703–1 707.(ZHANG Dingli,HUANG Jun. Analysis and prediction of vault crown settlement in metro tunneling at shallow depth[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(10):1 703–1 707.(in Chinese))
[15] 张顶立. 海底隧道不良地质体及结构界面的变形控制技术[J]. 岩石力学与工程学报,2007,26(11):2 161–2 169.(ZHANG Dingli. Deformation control techniques of unfavorable geologic bodies and discontinuous surfaces in subsea tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(11):2 161–2 169.(in Chinese))
[16] 张顶立,吕 勤. 深圳地铁一期工程浅埋暗挖施工地层变形模式[J]. 岩土力学,2006,27(增):249–255.(ZHANG Dingli,LU Qin. Strata deformation pattern of first-stage construction in Shenzhen subway using shallow tunnel construction method[J]. Rock and Soil Mechanics,2006,27(Supp.):249–255.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|