| EXPERIMENTAL STUDY OF REASONABLE COAL PILLAR
WIDTH IN FULLY MECHANIZED TOP COAL CAVING FACE
OF DEEP THICK COAL SEAM |
| WANG Dechao1,2,LI Shucai1,WANG Qi1,2,3,LI Weiteng1,WANG Fuqi3,
WANG Hongtao1,PENG Peng3,RUAN Guoqiang3 |
(1. Research Center of Geotechnical and Structural Engineering,Shandong University,Jinan,Shandong 250061,China;
2. State Key Laboratory of Mining Disaster Prevention and Control,Shandong University of Science and Technology,
Qingdao,Shandong 266590,China;3. Post-doctoral Scientific Research Station,Yankuang Group
Company Limited,Zoucheng,Shandong 273500,China) |
|
|
|
|
Abstract Determination of reasonable coal pillar width is key for ensuring stability of surrounding rock of fully mechanized caving roadway driving along next goaf. Taking track roadway of 11302 workface in Zhaolou colliery as the engineering background,a new side abutment pressure monitoring method was proposed;and the reasonable coal pillar width was determined by using the method of field stress monitoring and numerical simulation. Field stress monitoring and numerical analysis results show that the influence scope of workface side abutment pressure is 50–56 m,and low stress zone width is 12–15 m,considering pillar stress environment,pillar width should not be larger than 7–10 m. Meanwhile,considering being propitious to bolt anchoring,width of coal pillar should not be less than 4 m. Various elements such as coal pillar stability,secondary disaster control and resources recovery were considered comprehensively. Finally,the reasonable width of segment pillar is determined as 5 m. Reasonable pillar width is verified by using large-scale geomechanical model test and field test. Monitoring results show that variation of surrounding deformation along the empty wall is largest,followed by roof and entity wall,floor is least. After roadway driving along next goaf stability,roof to floor convergence is 271 mm;two walls convergence is 359 mm;the effect of roadway surrounding rock is well. Bolts and anchors forces are in their yield range;and set aside a sufficient margin for the recovery period. The results can provide a reference for segment pillar setting in other mines with similar mining conditions.
|
|
Received: 06 May 2013
|
|
|
|
| [1] 杜计平,孟宪锐. 采矿学[M]. 徐州:中国矿业大学出版社,2009:122–130.(DU Jiping,MENG Xianrui. Mining science[M]. Xuzhou: China University of Mining and Technology Press,2009:122–130. (in Chinese))
[2] 刘增辉,高 谦,华心祝,等. 沿空掘巷围岩控制的时效特征[J]. 采矿与安全工程学报,2009,26(4):465–469.(LIU Zenghui,GAO Qian,HUA Xinzhu,et al. Aging characteristics of wall rock control in roadway driving along goaf[J]. Journal of Mining and Safety Engineering,2009,26(4):465–469.(in Chinese))
[3] 常聚才,谢广祥,杨 科. 综放沿空巷道小煤柱合理宽度确定[J]. 西安科技大学学报,2006,28(2):226–230.(CHANG Jucai,XIE Guangxiang,YANG Ke. Determination of reasonable width for small coal pillar with gob-side entry driving in fully mechanized top-coal caving face[J]. Journal of Xi?an University of Science and Technology,2006,28(2):226–230.(in Chinese))
[4] 奚家米,毛久海,杨更社,等. 回采巷道合理煤柱宽度确定方法研究与应用[J]. 采矿与安全工程学报,2008,25(4):400–403.(XI Jiami,MAO Jiuhai,YANG Gengshe,et al. Method for determining rational pillar width in mining roadway along goaf[J]. Journal of Mining and Safety Engineering,2008,25(4):400–403.(in Chinese))
[5] 刘金海,姜福兴,王乃国,等. 深井特厚煤层综放工作面区段煤柱合理宽度研究[J]. 岩石力学与工程学报,2012,31(5):921–927. (LIU Jinhai,JIANG Fuxing,WANG Naiguo,et al. Research on reasonable width of segment pillar of fully mechanized caving face in extra-thick coal seam of deep shaft[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(5):921–927.(in Chinese))
[6] 柏建彪,王卫军,侯朝炯,等. 综放沿空掘巷围岩控制机制及支护技术研究[J]. 煤炭学报,2000,25(5):478–481.(BAI Jianbiao,WANG Weijun,HOU Chaojiong,et al. Control mechanism and support technique about gateway driven along goaf in fully mechanized top coal caving face[J]. Journal of China Coal Society,2000,25(5):478–481.(in Chinese))
[7] 柏建彪,侯朝炯,黄汉富. 沿空掘巷窄煤柱稳定性数值模拟研究[J]. 岩石力学与工程学报,2004,23(20):3 475–3 479.(BAI Jianbiao,HOU Chaojiong,HUANG Hanfu. Numerical simulation study on stability of narrow coal pillar of roadway driving along goaf[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(20):3 475–3 479.(in Chinese))
[8] 李学华,张 农,侯朝炯. 综采放顶煤面沿空巷道合理位置确定[J]. 中国矿业大学学报,2000,29(2):186–189.(LI Xuehua,ZHANG Nong,HOU Chaojiong. Rational position determination of roadway driving along next goaf for fully mechanized top coal caving mining[J]. Journal of China University of Mining and Technology,2000,29(2):186–189.(in Chinese))
[9] 王卫军,侯朝炯,李学华. 老顶给定变形下综放沿空掘巷合理定位分析[J]. 湘潭矿业学院学报,2001,16(2):1–4.(WANG Weijun,HOU Chaojiong,LI Xuehua. Position analysis of road driving along next goaf under given deformation of the main roof in sublevel caving face[J]. Journal of Xiangtan Mining Institute,2001,16(2):1–4.(in Chinese))
[10] 谢广祥,杨 科,刘全明. 综放面倾向煤柱支承压力分布规律研究[J]. 岩石力学与工程学报,2006,25(3):545–549.(XIE Guangxiang,YANG Ke,LIU Quanming. Study on distribution laws of stress in inclined coal pillar for fully-mechanized top-coal caving face[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(3):545–549.(in Chinese))
[11] 李 磊,柏建彪,王襄禹. 综放沿空掘巷合理位置及控制技术[J]. 煤炭学报,2012,37(9):1 564–1 569.(LI Lei,BAI Jianbiao,WANG Xiangyu. Rational position and control technique of roadway driving along next goaf in fully mechanized top coal caving face[J]. Journal of China Coal Society,2012,37(9):1 564–1 569.(in Chinese))
[12] 郑西贵,姚志刚,张 农. 掘采全过程沿空掘巷小煤柱应力分布研究[J]. 采矿与安全工程学报,2012,29(4):459–465.(ZHENG Xigui,YAO Zhigang,ZHANG Nong. Stress distribution of coal pillar with gob-side entry driving in the process of excavation and mining[J]. Journal of Mining and Safety Engineering,2012,29(4):459–465.(in Chinese))
[13] 康红普,牛多龙,张 镇,等. 深部沿空留巷围岩变形特征与支护技术[J]. 岩石力学与工程学报,2010,29(10):1 977–1 987.(KANG Hongpu,NIU Duolong,ZHANG Zhen,et al. Deformation characteristics of surrounding rock and supporting technology of gob-side entry retaining in deep coal mine[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(10):1 977–1 987.(in Chinese))
[14] 刘金海,姜福兴,王乃国,等. 深井特厚煤层综放工作面支承压力分布特征的实测研究[J]. 煤炭学报,2011,36(增1):18–22.(LIU Jinhai,JIANG Fuxing,WANG Naiguo,et al. Survey on abutment pressure distribution of fully mechanized caving face in extra-thick coal seam of deep shaft[J]. Journal of China Coal Society,2011,36(Supp.1):18–22.(in Chinese))
[15] 王同旭,刘传孝,王小平. 孤岛煤柱侧向支承压力分布的数值模拟与雷达探测研究[J]. 岩石力学与工程学报,2002,21(增2):2 484–2 487.(WANG Tongxu,LIU Chuanxiao,WANG Xiaoping. Numerical simulation and radar detection of lateral abutment pressure distribution of isolated coal pillar[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(Supp.2):2 484–2 487.(in Chinese))
[16] 王 琦,王汉鹏,李术才,等. 柔性均布压力加载装置的研制及试验分析[J]. 岩石力学与工程学报,2012,31(1):133–139.(WANG Qi,WANG Hanpeng,LI Shucai,et al. Development and test analysis of flexible uniform pressure loading device[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(1):133–139.(in Chinese))
[17] 张强勇,李术才,郭小红,等. 铁晶砂胶结新型岩土相似材料的研制及其应用[J]. 岩土力学,2008,29(8):2 126–2 130.(ZHANG Qiangyong,LI Shucai,GUO Xiaohong,et al. Research and development of new typed cementations geotechnical similar material for iron crystal sand and its application[J]. Rock and Soil Mechanics,2008,29(8):2 126–2 130.(in Chinese)) |
| [1] |
LI Botao1, 2, 3, TAN Yuxuan1, LIN Haifei4, 5*, WEI Jianping1, 2, 3, ZHANG Hongtu1, 2, 3, LI Shugang4, 5, WEI Zongyong4, 5, WANG Pei4, LUO Rongwei4, LIU Yanwei1, 2, 3. Mechanical properties and mesoscopic damage evolution of coal under liquid-nitrogen freezing at different initial temperatures[J]. , 2026, 45(6): 1757-1772. |
|
|
|
|