|
|
|
| EXPERIMENTAL STUDY OF FREEZE CHARACTERISTICS IN ROADBED- CULVERT TRANSITION SECTION ALONG A HIGH-SPEED RAILWAY |
| NIU Fujun1,2,LIU Hua1,3,NIU Yonghong1 |
(1. State Key Laboratory of Frozen Soil Engineering,Cold and Arid Regions Environmental and Engineering Research Institute,Chinese Academy of Sciences,Lanzhou,Gansu 730000,China;2. Cold Regions Road Engineering Laboratory,CCCC
First Highway Consultants Co.,Ltd.,Xi?an,Shaanxi 710068,China;3. School of Civil Engineering,Xi'an University
of Architecture and Technology,Xi?an,Shaanxi 710055,China) |
|
|
|
|
Abstract Based on monitoring of ground temperature in a typical roadbed-culvert transition section,the ground temperature regime and its temporal and spatial development,along with its impact on roadbed stability was analyzed. The results show that,the maximum depth of seasonal freezing in the roadbed of transaction is about 2 times which in the natural ground because of the existence of culvert. The starting times of freezing and thawing process above and below the culvert are earlier than that behind the culvert wall. As the culvert performs somewhat as a ventilation duct,the temperature difference caused by the sunny-shady slopes is weaken. The culvert has a significant impact on the ground temperature of the roadbed around it,showing as significant increase of temperature changing amplitude in the fillings above the culvert and behind the culvert wall. Above all,the works of monitoring and analysis of the freezing characteristics in roadbed-culvert transition section can provide references for the selection of roadbed filling material and foundation treatment below the culvert.
|
|
Received: 06 May 2013
|
|
|
|
| [1] WILLIAMS P J,SMIT H M W. The frozen earth[M]. Cambidge:Cambridge University Press,1989:306.
[2] 徐敩祖,王家澄,张立新. 冻土物理学[M]. 北京:科学出版社,2001:9–11.(XU Xiaozu,WANG Jiacheng,ZHANG Lixin. Physics of frozen soils[M]. Beijing:Science Press,2001:9–11.(in Chinese))
[3] 程国栋. 用冷却路基的方法修建青藏铁路[J]. 中国铁道科学,2003,24(3):1–4.(CHENG Guodong. Construction of Qinghai-Tibet railway with cooled roadbed[J]. China Railway Science,2003,24(3):1–4.(in Chinese))
[4] 程国栋,孙志忠,牛富俊. “冷却路基”方法在青藏铁路上的应用[J]. 冰川冻土,2006,28(6):797–808.(CHENG Guodong,SUN Zhizhong,NIU Fujun. Application of roadbed cooling methods in the Qinghai- Tibet railway construction[J]. Journal of Glaciology and Geocryology,2006,28(6):797–808.(in Chinese))
[5] 马 巍,程国栋,吴青柏. 多年冻土地区主动冷却地基方法研究[J]. 冰川冻土,2002,24(5):579–587.((MA Wei,CHENG Guodong,WU Qingbai. Preliminary study on technology of cooling foundation in permafrost regions[J]. Journal of Glaciology and Geocryology,2002,24(5):579–587.(in Chinese))
[6] 吴少海. 青藏铁路多年冻土区涵洞类型选择及基础埋置深度[J]. 中国铁路,2002,(12):38–41.(WU Shaohai. Selection of culvert types and depth of foundation in permafrost area on Qinghai-Tibet railway[J]. Chinese Railway,2002,(12):38–41.(in Chinese))
[7] 张学富,赖远明,喻文兵,等. 寒区涵洞现浇混凝土基础水化热的影响分析[J]. 公路,2003,(2):50–56.(ZHANG Xuefu,LAI Yuanming,YU Wenbing,et al. Analysis of hydration heat effect of cast-in-situ concrete foundations of cold region culverts[J]. Highway,2003,(2):50–56.(in Chinese))
[8] 王 凯,罗广宇,罗 英,等. 高含冰量冻土地区拼装涵洞施工技术[J]. 长安大学学报:建筑与环境科学版,2003,20(1):30–32. (WANG Kai,LUO Guangyu,LUO Ying,et al. The construction technique of precast installed culvert at high-ice content frozen soil[J]. Journal of Chang?an University:Architecture and Environment Science,2003,20(1):30–32.(in Chinese))
[9] 曹玉新. 青藏铁路多年冻土区拼装式涵洞施工技术[J]. 铁道建筑技术,2003,(2):45–46.(CAO Yuxin. The assembled culvert construction in permafrost regions of Qinghai-Tibet railway[J]. Railway Construction Technology,2003,(2):45–46.(in Chinese))
[10] 马天明. 青藏铁路多年冻土区涵洞基础施工技术[J]. 铁道标准设计,2003,(4):33–34.(MA Tianming. The foundation construction of culvert in permafrost regions of Qinghai-Tibet railway[J]. Railway Standard Design,2003,(4):33–34.(in Chinese))
[11] 张旭芝. 高原多年冻土涵洞温度场及地基土冻融变形规律研究[博士学位论文][D]. 长沙:中南大学,2007.(ZHANG Xuzhi. Study on temperature fields and frost heave and thaw settlement of railway culvert in permafrost region[Ph. D. Thesis][D]. Changsha:Central South University,2007.(in Chinese))
[12] 孙 文. 多年冻土区涵洞对热棒路基的热稳定性影响分析[硕士学位论文][D]. 兰州:兰州交通大学,2008.(SUN Wen. Influences of culvert on the thermal stability of roadbed with thermal pile in permafrost region[M. S. Thesis][D]. Lanzhou:Lanzhou Jiaotong University,2008.(in Chinese))
[13] 许 健,牛富俊,李爱敏,等. 季节冻土区保温法抑制铁路路基冻胀效果研究[J]. 铁道学报,2010,32(6):124–131.(XU Jian,NIU Fujun,LI Aimin,et al. Analysis of the prevention effect of thermal- insulation method on frost heave of railway subgrade in seasonal frozen regions[J]. Journal of the China Railway Society,2010,32(6):124–131.(in Chinese))
[14] 许 健,牛富俊,牛永红,等. 季节冻土区防冻胀护道对保温路基地温特征影响效果研究[J]. 铁道学报,2011,33(3):84–90.(XU Jian,NIU Fujun,NIU Yonghong,et al. Study on the temperature field of insulated roadbed with frost-resistant berm on seasonal frozen region[J]. Journal of the China Railway Society,2011,33(3):84–90.(in Chinese))
[15] 许 健,牛富俊,牛永红,等. 换填法抑制季节冻土区铁路路基冻胀效果分析[J]. 中国铁道科学,2011,32(5):1–7.(XU Jian,NIU Fujun,NIU Yonghong,et al. Analysis of the effect of replacing-soil method on inhibiting frost heave of railway roadbed in seasonal frozen soil region[J]. China Railway Science,2011,32(5):1–7.(in Chinese))
[16] 刘 华,牛富俊,牛永红,等. 季节性冻土区高速铁路路基填料及防冻层设置研究[J]. 岩石力学与工程学报,2011,30(12):2 549–2 557.(LIU Hua,NIU Fujun,NIU Yonghong,et al. Study of design of filling material and setting anti-frost layer for high-speed railway roadbed in seasonally frozen regions[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(12):2 549–2 557.(in Chinese)) |
|
|
|