[1] |
刘天泉. 厚松散含水层下近松散层的安全开采[J]. 煤炭科学技术,1986,(2):14-18.(LIU Tianquan. Safe extraction of near soft layer underlying a thick and soft water beating layer[J]. Coal Science and Technology,1986,(2):14-18.(in Chinese))
|
[2] |
桂和荣,孙家斌,李明好,等. 厚松散层及超薄覆岩条件下放顶煤开采防砂煤柱[J]. 煤田地质与勘探,2002,32(2):36-39.(GUI Herong,SUN Jiabin,LI Minghao,et al. Study of mining the safety pillar against sand by caving method under conditions of thick gravelly ground and super thin capping rock[J]. Coal Geology and Exploration,2002,32(2):36-39.(in Chinese))
|
[3] |
刘学增. 新生代松散层下缩小防水岩柱留设防砂煤柱开采实践[J]. 煤炭技术,2002,21(9):27-28.(LIU Xuezeng. Mining practice of shrinking water-prevention rock pillar and leaving sand-prevention pillar under the loose layer of Cenozoic Era(Kz)[J]. Coal Technology,2002,21(9):27-28.(in Chinese))
|
[4] |
刘天泉. 矿山岩体采动影响与控制工程学及其应用[J]. 煤炭学报,1995,20(1):1-5.(LIU Tianquan. Influence of mining activities on mine rock mass and control engineering[J]. Journal of China Coal Society,1995,20(1):1-5.(in Chinese))
|
[5] |
高延法. 岩移“四带”模型与动态位移反分析[J]. 煤炭学报,1996,21(1):51-56.(GAO Yanfa. Four zone model of rock mass movement and back analysis of dynamic displacement[J]. Journal of China Coal Society,1996,21(1):51-56.(in Chinese))
Your browse does not support frame! |