| IN-SITU TEST ON DIVERSION TUNNEL AT JINPING II HYDROPOWER STATION I—TEST DESIGN |
| ZHANG Chunsheng1,CHU Weijiang2,HOU Jing1,CHEN Xiangrong1,WU Xumin1,LIU Ning1 |
(1. PowerChina Huadong Engineering Corporation,Hangzhou,Zhejiang 310014,China;
2. HydroChina ITASCA R and D Center,Hangzhou,Zhejiang 310014,China) |
|
|
|
|
Abstract The large scale in-situ test is an important method to solve complex engineering problems. During the construction of diversion tunnels at Jinping II hydropower station,an in-situ test program to monitor the realtime response of the surrounding rocks of the diversion tunnel excavated with TBM was designed and implemented. The contents of the in-situ test program include the stress measurement of rock mass with the rock stress meters of vibrating wire and CSIRO HI Cells to record the stress change in rock mass during tunneling,the acoustic emission monitoring to detect the crack initiation and propagation in rock mass during excavation,the sonic velocity measurement to determine the profile of excavation damage zone around tunnel,the displacement measurement with the multipoint displacement meters and fiber Bragg grating sensors to obtain the deformation of rock mass during tunneling,the digital photographing of borehole to observe the process of the macrocrack initiation. This article is the first of the series and introduce the background of the project,the designing of the in-situ test program,and the detailed geological models of the tested region.
|
|
Received: 08 June 2013
|
|
|
|
| [1] RUTQVIST J,TSANG C F. Analysis of thermal-hydrologic- mechanical behavior near an emplacement drift at Yucca mountain[J]. Journal of Contaminant Hydrology,2003,62/63:637–652.
[2] BIRKHOLZER J,LI G,TSANG C F,et al. Modeling studies and analysis of seepage into drifts at Yucca mountain[J]. Journal of Contaminant Hydrology,1999,38(1/3):349–384.
[3] READ R S. 20 years of excavation response studies at AECL?s underground research laboratory[J]. International Journal of Rock Mechanics and Mining Sciences,2004,41(8):1 251–1 275.
[4] MARTINO J B,READ R S. An overview of AECL?s heated failure tests[J]. ISRM Newsjournal,1996,4(1):24–31.
[5] LAAKSOHARJU M,TULLBORG E L,WIKBERG P,et al. Hydrogeochemical conditions and evolution at the Äspö HRL,Sweden[J]. Applied Geochemistry,1999,14(7):835–859.
[6] ASK D. New developments in the integrated stress determination method and their application to rock stress data at the Äspö HRL,Sweden[J]. International Journal of Rock Mechanics and Mining Sciences,2006,43(1):107–126.
[7] OLSSON O. The structure of conceptual models with application to the Äspö HRL project[M]. Swedish:Swedish Nuclear Fuel and Waste Management Company,1994:86–132.
[8] JOHANNESSON L E,BÖRGESSON L,GOUDARZI R,et al. Prototype repository:A full scale experiment at Äspö HRL[J]. Physics and Chemistry of the Earth,Parts A/B/C,2007,32(1):58–76.
[9] THURY M,BOSSART P. The Mont Terri rock laboratory,a new international research project in a Mesozoic shale formation,in Switzerland[J]. Engineering Geology,1999,52(3):347–359.
[10] WERSIN P,VAN LOON L R,SOLER J M,et al. Long-term diffusion experiment at Mont Terri:first results from field and laboratory data[J]. Applied Clay Science,2004,26(1):123–135.
[11] POTYONDY D O,CUNDALL P A. A bonded-particle model for rock[J]. International Journal of Rock Mechanics and Mining Sciences,2004,41(8):1 329–1 364.
[12] YOUNG R P,COLLINS D S,REYES-MONTES J M,et al. Quantification and interpretation of seismicity[J]. International Journal of Rock Mechanics and Mining Sciences,2004,41(8):1 317–1 327.
[13] 张春生,陈祥荣,侯 靖,等. 锦屏深埋大理岩力学特性研究与工程应用[J]. 岩石力学与工程学报,2010,29(10):1 999–2 009. (ZHANG Chunsheng,CHEN Xiangrong,HOU Jing,et al. Study of mechanical behavior of deep-buried marble at Jinping II hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(10):1 999–2 009.(in Chinese)) |
|
|
|