| NUMERICAL ANALYSIS OF SURFACE SETTLEMENT CONTROL CONSIDERING PIPE JACKING CONSTRUCTION PROCESS |
| YU Jun1,GONG Xiaonan2 |
(1. College of Civil Engineering and Architecture,Zhejiang University of Technology,Hangzhou,Zhejiang 310014,China;
2. College of Civil Engineering and Architecture,Zhejiang University,Hangzhou,Zhejiang 310029,China) |
|
|
|
|
Abstract Pipe jacking construction causes soil disturbance and leads to surface settlement and building damage. In order to reduce soil disturbance and building damage,especially in soft soils with high water level,numerical simulation is conducted to optimize construction parameters based on surface settlement control,because settlement is comprehensive response. The parameters,such as friction,pipe jacking pressure,soil anti-force,were comprehensively analyzed to control surface settlement and protect environment and construction safety. Result shows that when above mentioned three parameters are 10 kPa,0.18 MPa,15 kPa,respectively,the surface settlement is the least. The conclusion could provide the references to similar engineering.
|
|
Received: 03 June 2013
|
|
|
|
| [1] 潘同燕. 大口径急曲线顶管施工力学分析与监测技术研究[硕士学位论文][D]. 上海:同济大学,2000.(PAN Tongyan. Study on construction mechanics and monitoring technology of big pipe diameter small curvature radius pipe jacking engineering[M. S. Thesis] [D]. Shanghai:Tongji University,2000.(in Chinese))
[2] 葛金科,张 悦. 急曲线顶管技术应用[J]. 岩土工程学报,2002,24(2):247–250.(GE Jinke,ZHANG Yue. Application of jacking technology to sharply curved pile[J]. Chinese Journal of Geotechnical Engineering,2002,24(2):247–250.(in Chinese))
[3] 宋 杰. 急曲线顶管施工力学分析及纠偏技术研究[硕士学位论文][D]. 上海:同济大学,2001.(SONG Jie. Study on construction mechanics and correct of a deviation technology of small curvature radius pipe jacking engineering[M. S. Thesis][D].Shanghai:Tongji University,2001.(in Chinese))
[4] 冯海宁,龚晓南,徐日庆. 顶管施工影响的有限元计算分析[J]. 岩石力学与工程学报,2004,23(7):1 158–1 162.(FENG Haining,GONG Xiaonan,XU Riqing. Finite element analysis of influence of pipe-jacking construction on environments[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(7):1 158–1 162.(in Chinese))
[5] CHAPMAN D N. Graphical method for predicting ground movements from pipe jacking[J]. Proceedings of the Institution of Civil Engineers. Geotechnical Engineering,1999,137(2):87–96.
[6] DAN Z Y. Ground movement associated with microtunneling[Ph. D. Thesis][D]. Ruston,USA:Louisiana Tech University,2001.
[7] 罗攸波,周 健. 多元线性回归分析法计算顶管施工引起的地面沉降[J]. 岩土力学,2003,24(1):130–134.(LUO Youbo,ZHOU Jian. Computation of ground settlement induced by the pipe jacking using
multivariate linear regression method[J]. Rock and Soil Mechanics,2003,24(1):130–134.(in Chinese))
[8] MARK M. Pipe-jacked tunneling:jacking loads and ground movement[Ph. D. Thesis][D]. London:University of Oxford,1998.
[9] ZHOU J Q. Numerical Analysis and Laboratory Test of Concrete Jacking Pipes[Ph. D. Thesis] [D]. London:University of Oxford,1998.
[10] 丁文其,朱合华,范明星,等. 管节–接头的弹性地基梁法及顶管施工模拟分析[J]. 同济大学学报,2001,29(5):616–620.(DING Wenq,ZHU Hehua,FAN Minxing,et al. Beam on elastic foundation method considering pipe-joint and analysis of pipe jacking Construction[J]. Journal of Tongji University,2001,29(5):616–620.(in Chinese))
[11] NANNO,TERUHISA. Method for driving curved pipe-jacked tunnels[J]. Tunneling and Underground Space Technology,1996,11(2):3–25.
[12] 朱合华,吴江斌,潘同燕. 曲线顶管的三维力学模型理论分析与应用[J]. 岩土工程学报,2003,25(4):492–495.(ZHU Hehua,WU Jiangbin,PAN Tongyan. Theoretical analysis of three dimensional mechanical model of curved pipe jacking and its application[J]. Chinese Journal of Geotechnical Engineering,2003,25(4):492–495.(in Chinese)) |
|
|
|