| RESEARCH ON DEFORMATION FEATURES AND INFLUENTIAL FACTORS OF WATER-SATURATED SOIL TUNNEL |
| QU Xing,LI Ning,CHEN Yongting |
| (Institute of Geotechnical Engineering,Xi?an University of Technology,Xi?an,Shaanxi 710048,China) |
|
|
|
|
Abstract Based on the monitoring data of the Xinjiang Kuyu diversion tunnel,the deformation properties and influential factors of the water-saturated soil tunnel are in-depth analyzed. According to the deformation law of soil tunnel,the process of the effect of deformation after excavation could be divided into three phases:The first phase is the response under the horizontal spatial effect,the second phase is the response under the combination of longitudinal spatial effect and the time effect,the final phase is only influenced by the time effect. The horizontal spatial effect is the main factor leading to roof collapse and landslide during excavation. To reduce the effects of it,the advanced support method or reducing the area in horizontal direction could be adopted;As the longitudinal spatial effect and the time effect dominate the deformation in second phase,a rational separation of them would provides a basis for parameter inversion. In third phase,the time effect primarily is rheological deformation,which appears much more obviously in saturated low liquid limit silt(clay). According to the analysis of the monitoring data which are measured under different classes of surrounding rocks,different buried depths and different supporting intensities,it could indicate that the integration of the silty clay is good,and its main deformation is significantly associated with the buried depth. The deeper the depth is,the more the degree of deformationis. It presents the rheological behavior in some degree simultaneously. During excavation,small-scale landslide is more likely to occur in sand-layered silt and gravel-layered fine sand due to the large water discharge. The deformation is mainly expressed as the looseness of surrounding rock mass and strongly associated with spatial positions of sand layer,while the buried depth of tunnel have no significant influence on it. By using strengthened supporting method and partial excavation method,monitored values of the deformation are mostly small,obvious difference is observed among the deformation properties of supporting structures of the vault and sidewall. The vault can reach stability quickly with little deformation. Plastic area of surrounding rock of sidewall increases as the buried depth in low liquid limit silt(clay),the time effect of stress release is obvious,which manifests as the increasing deformation pressure and large convergence deformation. Steel arch is more significant than the steel grid to limit the deformation of surrounding rock for soil tunnel. Considering the construction cost factor,selection of supporting methods should depend upon different soil properties and different buried depths.
|
|
Received: 21 May 2013
|
|
|
|
| [1] 乔春生,管振祥,滕文彦. 饱水黄土隧道变形规律研究[J]. 岩土力学,2003,24 (增2):225–230.(QIAO Chunsheng,GUAN Zhenxiang,TENG Wenyan. A study on deformation of tunnel excavated in saturated loess[J]. Rock and Soil Mechanics,2003,24(Supp.2):225–230.(in Chinese))
[2] 杨会军,王梦恕. 隧道围岩变形影响因素分析[J]. 铁道学报,2006,28(3):93–96.(YANG Huijun,WANG Mengshu. Analysis of construction factors of surrounding rock deformation in tunneling works[J]. Journal of the China Railway Society,2006,28(3):93–96.(in Chinese))
[3] 孙元春,尚彦军. 岩石隧道围岩变形时空效应分析[J]. 工程地质学报,2008,16(2):211–215.(SUN Yuanchun,SHANG Yanjun. Intergrated analysis of the tempo-spatial effect of surrounding rock deformation in tunneling[J]. Journal of Engineering Geology,2008,16(2):211–215.(in Chinese))
[4] 陈 庆,杨文喜,卢 珂. 深埋砾石层隧道围岩压力计算方法[J]. 施工技术,2011,40(增):242–243.(CHEN Qing,YANG Wenxi,LU Ke. Calculating methods for the pressure of wall rock of immerged tunnel in gravel stratum[J]. Construction Technology,2011,40(Supp.):242–243.(in Chinese))
[5] 庄 丽,周顺华. 浅埋层状大跨度土质隧道变形及稳定性试验研究[J]. 岩石力学与工程学报,2008,27(增2):3 360–3 366. (ZHUANG Li,ZHOU Shunhua. Experimental research on deformation and stability of shallow-buried large-span soil-layered tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(Supp.2):3 360–3 366.(in Chinese))
[6] 赵旭峰,王春苗,孔祥利. 深部软岩隧道施工性态时空效应分析[J]. 岩石力学与工程学报,2007,26(2):404–409.(ZHAO Xufeng,WANG Chunmiao,KONG Xiangli. Analysis of time-space effects of construction behavior of deep soft rock tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(2):404–409.(in Chinese))
[7] 吴 波,刘维宁,高 波,等. 城市浅埋隧道施工性态的时空效应分析[J]. 岩土工程学报,2004,26(3):340–343.(WU Bo,LIU Weining,GAO Bo,et al. Analysis of space-time effect of urban shallow tunneling by excavation[J]. Chinese Journal of Geotechnical Engineering,2004,26(3):340–343.(in Chinese))
[8] 孙 钧,朱合华. 软弱围岩隧洞施工性态的力学模拟与分析[J]. 岩土力学,1994,15(4):20–33.(SUN Jun,ZHU Hehua. Mechanical simulation and analysis of behavior of soft and weak rocks in the construction of a tunnel opening[J]. Rock and Soil Mechanics,1994,15(4):20–33.(in Chinese))
[9] 李俊鹏. 开挖过程中隧洞围岩应力释放规律及软岩支护时机研究[硕士学位论文][D]. 西安:西安理工大学,2007.(LI Junpeng. Rules of stress release in tunnel during excavation and the opportunity of support in soft rock[M. S. Thesis][D]. Xi?an:Xi?an University of Technology,2007.(in Chinese))
[10] 陈方方. 地下洞室弹塑性仿真反分析研究[硕士学位论文][D]. 西安:西安理工大学,2004.(CHEN Fangfang. A method of elastoplastic back analysis by emulation construction of tunnel[M. S. Thesis][D]. Xi?an:Xi?an University of Technology,2004.(in Chinese))
[11] 李 宁,段小强,陈方方,等. 围岩松动圈的弹塑性位移反分析方法探索[J]. 岩石力学与工程学报,2006,25(7):1 304–1 308.(LI Ning,DUAN Xiaoqiang,CHEN Fangfang,et al. A back analysis method for elastoplastic displacement of broken rock zone around tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(7):1 304–1 308.(in Chinese))
[12] 周小文,濮家骝,包承钢. 砂土中隧洞开挖稳定机制及松动土压力研究[J]. 长江科学院院报,1999,16(4):9–13.(ZHOU Xiaowen,PU Jialiu,BAO Chenggang. Study on stability mechanism and relaxed soil pressure in sandy soil during excavation[J]. Journal of Yangtze River Scientific Research Institute,1999,16(4):9–13.(in Chinese))
[13] 吕建兵,傅鹤林. 破碎围岩中深埋隧道荷载计算值的对比[J]. 西部探矿工程,2004,(2):96–99.(LU Jianbing,FU Helin. Correlation of loading calculation values of deep tunnels in the fractured wall[J]. West-China Exploration Engineering,2004,(2):96–99.(in Chinese))
[14] 张青龙,李 宁,曲 星,等. 富水软岩隧洞变形特征及变形机制分析[J]. 岩石力学与工程学报,2011,30(11):2 196–2 202. (ZHANG Qinglong,LI Ning,QU Xing,et al. Analyses of deformation characteristics and mechanism of water-rich soft rock tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(11):2 196–2 202.(in Chinese))
[15] 吴秋军,王明年,刘大刚. 基于现场位移监测数据统计分析的隧道围岩稳定性研究[J]. 岩土力学,2012,33(增2):359–364.(WU Qiujun,WANG Mingnian,LIU Dagang. Research on stability of tunnel surrounding rocks based on statistical analysis of on-site displacement monitoring data[J]. Rock and Soil Mechanics,2012,33(Supp.2):359–364.(in Chinese))
[16] 赵 勇,刘建友,田四明. 深埋隧道软弱围岩支护体系受力特征的试验研究[J]. 岩石力学与工程学报,2011,30(8):1 663–1 670. (ZHAO Yong,LIU Jianyou,TIAN Siming. Experimental study of mechanical characteristics of support system for weak surrounding rock of deep tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(8):1 663–1 670.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|