| BAO Shufeng1,2,3,QIU Qingchang1,2,LUO Yan1,2,WANG Pan1,2,HUANG Junwen1,2,WANG Bingwen1,2 |
| (1. CCCC Fourth Harbor Engineering Institute Co.,Ltd.,Guangzhou,Guangdong 510230,China;2. CCCC Key Laboratory of Environmental Protection and Safety in Foundation Engineering of Transportation,Guangzhou,Guangdong 510230,China;3. School of Civil Engineering and Transportation,South China University of Technology,Guangzhou,Guangdong 510641,China) |
|
|
|
|
Abstract In order to guide the construction of the foundation pit composed of soil and rock effectively,the related monitoring techniques were deeply studied. The failure mode of pit composed of soil and rock was qualitatively analyzed. Based on an under-construction foundation pit composed of soil and rock in the mileage section DK799+450–DK800+750 in Pearl River Delta Area,a typical cross-section was computed with three-dimensional finite element method and monitoring. After synthesis analysis of monitoring results and calculation results,it was pointed out that,based on the existed code,it should mainly monitor deformations and internal forces of guard piles and axial forces of inner bracing for foundation pit composed of soil and rock,especially for the foundation pit whose in-situ stratified rock was a little influenced by groundwater. In addition,the surrounding environment of foundation pit should be also paid some attentions according to the engineering condition.
|
|
Received: 19 October 2012
|
|
|
|
| [1] 宋建学,郑 仪,王原嵩. 基坑变形监测及预警技术[J]. 岩土工程学报,2006,28(11):1 889–1 891.(SONG Jianxue,ZHENG Yi,WANG Yuansong. Deformation monitoring and alerting technology of foundation pits[J]. Chinese Journal of Geotechnical Engineering,2006,28(11):1 889–1 891.(in Chinese))
[2] 龚晓南. 关于基坑工程的几点思考[J]. 土木工程学报,2005,38(9):99–102.(GONG Xiaonan. Considerations on foundation pit engineering[J]. China Civil Engineering Journal,2005,38(9):99–102.(in Chinese))
[3] 刘国彬,王卫东. 基坑工程手册(第二版)[M]. 北京:中国建筑工业出版社,2009:1 108–1 150.(LIU Guobin,WANG Weidong. Excavation engineering manual(Second edition)[M]. Beijing:China Building Industry Press,2009:1 108–1 150.(in Chinese))
[4] 中华人民共和国国家标准. GB50497—2009建筑基坑工程监测技术规范[S]. 北京:中国建筑工业出版社,2009.(The National Standards Compilation Group of People?s Republic of China. GB50497—2009 Technical code for monitoring of building foundation pit engineering[S]. Beijing:China Building Industry Press,2009.(in Chinese))
[5] 龚晓南. 基坑工程发展中应重视的几个问题[J]. 岩土工程学报. 2006,28(1):321–331.(GONG Xiaonan. Some major problems in the development of foundation pit engineering[J]. Chinese Journal of Geotechnical Engineering,2006,28(1):321–331.(in Chinese))
[6] 常士彪,张苏民. 工程地质手册[M]. 北京:中国建筑工业出版社,2007:823–864.(CHANG Shibiao,ZHANG Sumin. Project geology manual[M]. Beijing:China Building Industry Press,2007:823–864.(in Chinese))
[7] 肖树芳,杨淑碧. 岩体力学[M]. 北京:地质出版社,1987:10–15.(XIAO Shufang,YANG Subi. Rock mechnics[M]. Beijing:Geological Publishing House,1987:10–15.(in Chinese))
[8] 沈明荣,陈建峰. 岩体力学[M]. 上海:同济大学出版社,2006:23–35.(SHEN Mingrong,CHEN Jianfeng. Rock mechnics[M]. Shanghai:Tongji University Press,2006:23–35.(in Chinese))
[9] 唐大雄,张文殊. 工程岩土学[M]. 北京:地质出版社,1999:46–56.(TANG Daxiong,ZHANG Wenshu. Rock and soil engineering[M]. Beijing:Geological Publishing House,1999:46–56.(in Chinese))
[10] 顾雷雨. 深基坑施工中的安全风险预警研究[博士学位论文][D]. 上海:同济大学,2009.(GU Leiyu. Study on safety risk early-warning standard during construction of the deep excavation engineering[Ph. D. Thesis][D]. Shanghai:Tongji University,2009.(in Chinese)) |
| [1] |
QIN Zhihong1, 2, ZHAO Guangming1, 2*, MENG Xiangrui1, 2, CHENG Xiang1, 2, XU Wensong1, 2, . Mechanical behavior and failure modes of coal under unloading subjected to low-frequency dynamic disturbance[J]. , 2026, 45(1): 155-174. |
|
|
|
|