Citation Search Quick Search
  2014, Vol. 33 Issue (S2): 4067-4074    DOI: 10.13722/j.cnki.jrme.2014.s2.084
Artiles Current Issue | Archive | Adv Search |
STUDY OF THE PERMISSIBLE VALUE OF UPWARD FLOATING FOR SEGMENT IN SHIELD TUNNEL CONSTRUCTION
YE Junneng1,LIU Yuan2,3,4,CHEN Renpeng2,3,TANG Lujun2,3
(1. Ningbo Urban Rail Transit Project Construction Headquarter,Ningbo,Zhejiang 315012,China;2. MOE Key Laboratory of Soft Soils and Geoenvironmental Engineering,Zhejiang University,Hangzhou,Zhejiang 310058,China;3. Institute of Geotechnical Engineering,Zhejiang University,Hangzhou,Zhejiang 310058,China;4. Changjiang Survey,Planning, Design and Research Co.,Ltd.,Wuhan,Hubei 430010,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号