Citation Search Quick Search
  2015, Vol. 34 Issue (01): 93-103    DOI: 10.13722/j.cnki.jrme.2015.01.010
Artiles Current Issue | Archive | Adv Search |
FIELD MODEL TESTS ON PULLOUT CAPACITY OF TUNNEL-TYPE ANCHORAGES OF PULI BRIDGE
ZHANG Qihua1,YU Meiwan1,YU Zhengfu2,XIA Guobang2,WANG Shigu2,BIAN Zhihua1,WANG Hong3
(1. Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan,Hubei 430010,China;2. Construction Headquarters of Pu-Xuan Expressway of Yunnan Province,Xuanwei,Yunnan 655400,China;3. China Merchants Chongqing Communications Research and Design Institute Co.,Ltd.,Chongqing 400067,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号