Citation Search Quick Search
  2015, Vol. 34 Issue (04): 728-734    DOI:
Artiles Current Issue | Archive | Adv Search |
RESEARCH ON EFFECTIONS OF EXCAVATION SCHEMES OF TBM ON RISK OF ROCK BURST OF LONG POWER TUNNELS OF JINPING II HYDROPOWER STATION
WU Shiyong1,ZHOU Jifang1,CHEN Bingrui2,HUANG Manbin3
(1. Yalong River Hydropower Development Company,LTD,Chengdu 610051,China;2. Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan 430071,China;3. Shenyang Railway Survey Design Consulting Company Limited,Shenyang 110013,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号