Citation Search Quick Search
  2015, Vol. 34 Issue (09): 8-8    DOI: 10.13722/j.cnki.jrme.2014.1714
Artiles Current Issue | Archive | Adv Search |
A STUDY ON CONSTRUCTION MEASURE FOR THE KEY CONSTRUCTION STAGE OF METRO STATION CONSTRUCTED BY ENLARGING LARGE DIAMETER SHIELD TUNNEL
LI Zhaoping1,WANG Ting2,ZHENG Hao1
(1. School of Civil and Architecture engineering,Beijing Jiaotong University,Beijing 100044,China;
2. Beijing Municipal Engineering Group Co.,Ltd.,Beijing 100045,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号