| CALCULATION OF INTERNAL FORCES AND DEFLECTIONS OF SINGLE PILE IN THE GROUP PILE FOUNDATION OF TRANSMISSION LINES |
| ZOU Dan1,2,HE Huaijian1 |
(1. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,
Chinese Academy of Sciences,Wuhan,Hubei 430071,China;2. College of Civil Engineering,
Hunan University,Changsha,Hunan 410082,China) |
|
|
|
|
Abstract Through the force analysis of the group pile foundation,a vertical resistance coefficient of soil on the pile cap was proposed to calculate the uplift resistance and the stiffness coefficients of the pile top with the horizontal resistance were deduced based on the‘m’method. The deflection of the pile cap was calculated according to the force equilibrium equations and the internal forces and deflections of single piles were obtained with the deflection of the pile cap. Thus a method for calculating the single piles? internal forces and deflections of the group pile foundation was obtained. Finally,the single piles? internal forces and deflections of a group pile foundation with four piles were calculated under the uplift and compression conditions and the results were analyzed.
|
|
Received: 27 March 2014
|
|
|
|
| [1] 张忠亭. 架空输电线路设计原理[M]. 北京:中国电力出版社,2008:5–6.(ZHANG Zhongting. Design principles for overhead transmission lines[M]. Beijing:China Electric Power Press,2008:5–6.(in Chinese))
[2] 程永锋,卲晓岩,朱全军. 我国输电线路基础工程现状及存在的问题[J]. 电力建设,2002,23(3):32–34.(CHENG Yongfeng,SHAO Xiaoyan,ZHU Quanjun. Current situation of foundation works and existing problems for transmission lines in China[J]. Electric Power Construction,2002,23(3):32–34.(in Chinese))
[3] 杨泰华,张 华,贺怀建,等. 高压输电线路中输电塔塔基的模型制作及其承载性能的实验研究[J]. 武汉科技大学学报,2011,34(2):119–122.(YANG Taihua,ZHANG Hua,HE Huaijian,et al. Model making of transmission tower foundation in high voltage transmission lines and experimental study of its load bearing properties[J]. Journal of Wuhan University of Science and Technology,2011,34(2):119–122.(in Chinese))
[4] 刘振平,贺怀建,白世伟,等. 软基中500 kV输电桩板塔基现场试验与数值模拟[J]. 岩土力学,2012,33(3):1 031–1 039.(LIU
Zhenping,HE Huaijian,BAI Shiwei,et al. Field test and numerical simulation of pile-slab foundation of 500 kV transmission line tower in silt[J]. Rock and Soil Mechanics,2012,33(3):1 031–1 039.(in Chinese))
[5] 中华人民共和国行业标准编写组. JGJ 94—2008建筑桩基技术规范[S]. 北京:中国建筑工业出版社,2008.(The Professional Standards Compilation Group of People?s Republic of China. JGJ 94—2008 Technical code for building pile foundation[S]. Beijing:China Architecture and Building Press,2008.(in Chinese))
[6] 中华人民共和国行业标准编写组. DL/T 5219—2005架空送电线路基础设计技术规定[S]. 北京:中国电力出版社,2005.(The Professional Standards Compilation Group of People?s Republic of China. DL/T 5219—2005 Technical regulation for designing foundation of overhead transmission line[S]. Beijing:China Electric Power Press,2005.(in Chinese))
[7] 刘金砺. 桩基础设计与计算[M]. 北京:中国建筑工业出版社,1990:197–199.(LIU Jinli. Design and calculation of pile foundations[M]. Beijing:China Architecture and Building Press,1990:197–199.(in Chinese))
[8] 赵明华. 桥梁桩基计算与检测[M]. 北京:人民交通出版社,2000:61–70.(ZHAO Minghua. Calculation and detection of bridge pile foundations[M]. Beijing:China Communication Press,2000:61–70. (in Chinese))
[9] 刘文白. 抗拔基础的承载性能与计算[M]. 上海:上海交通大学出版社,2007:45–47.(LIU Wenbai. The bearing performance and bearing capacity calculation of uplift foundations[M]. Shanghai:Shanghai Jiaotong University Press,2007:45–47.(in Chinese)) |
|
|
|