| [1] |
姜长生,孙隆和,吴庆宪,等. 系统理论与鲁棒控制[M]. 北京:航空工业出版社,1998:1-20.(JIANG Changsheng,SUN Longhe,WU Qingxian,et a1. Systems theory and robust control[M]. Beijing:Aviation Industry Press,1998:1-20.(in Chinese))
|
| [2] |
易伟建,何庆锋,肖 岩. 钢筋混凝土框架结构抗倒塌性能的试验研究[J]. 建筑结构学报,2007,28(5):104-109.(YI Weijian,HE Qingfeng,XIAO Yan. Collapse performance ofRC frames structure[J]. Journal of Building Structures,2007,28(5):104-109.(in Chinese))
|
| [3] |
何庆锋,易伟建. 考虑悬索作用钢筋混凝土梁柱子结构抗倒塌性能试验研究[J]. 土木工程学报,2011,44(4):52-59.(HEQingfeng,YI Weijian. Experimental study of thecollapse-resistant behavior of RC beam-column sub-structuresconsidering catenary action[J]. China CivilEngineering Journal,2011,44(4):52-59.(in Chinese))
|
| [4] |
张凡榛,易伟建. 无梁楼板的抗倒塌性能试验研究及分析[J]. 湖南大学学报:自然科学版,2010,37(4):1-5.(ZHANG Fanzhen,YI Weijian. Collapse experiment research andanalysisof a RC flat plate[J]. Journal of HunanUniversity:Natural Sciences,2010,37(4):1-5.(in Chinese))
|
| [5] |
TAN S,ASTANEH-ASL A. Use of steel cables to prevent progressive collapse of existing buildings[C]//Proceedings of the Sixth Conference on Tall Buildings in Seismic Regions. [S.l.]:[s.n.],2003.
|
| [6] |
王 磊,陈以一,李 玲,等. 引入初始破坏的桁梁结构倒塌试验研究[J]. 同济大学学报:自然科学版,2010,38(5):644-649.(WANGLei,CHEN Yiyi,LI Ling,et a1. Experimental study onbeam-truss structure modelby introducingincipientfailure incollapse[J]. Journal ofTongji University:Natural Science,2010,38(5):644-649.(in Chinese))
|
| [7] |
RYUMIN A N. On hydrogeomechanical causes of accident in the subway of saint Petersburg[J]. Journal of Mining Science,2004,40(1):11-23.
|
| [8] |
廷辉,暄 平,文宏. 上海轨道交通4号线(董家渡)修复工程[M]. 上海:同济大学出版社,2008.(TING Hui,XUAN Ping,WEN Hong. Repair work of Shanghai metroline 4(Dongjiadu)[M]. Shanghai:Tongji University Press,2008.(in Chinese))
|
| [9] |
白云,胡向东,肖晓春. 国内外重大地下工程事故与修复技术[M]. 北京:中国建筑工业出版社,2012:5-20.(BAI Yun,HU Xiangdong,XIAO Xiaochun. Domestic and foreign major accidents in underground engineering and repair technology[M]. 2nd ed. Beijing:China Architecture andBuilding Press,2012:5-20.(in Chinese))
|
| [10] |
欧进萍,刘学东,陆钦年,等. 现役导管架式海洋平台结构整体安全度评估[J]. 海洋工程,1996,(3):84-91.(OU Jinping,LIU Xuedong,LU Qinnian,et a1. Safety evaluation of existing jacket offshoreplot form structure systems[J]. The Ocean Engineering,1996,(3):84-91.(in Chinese))
|
| [11] |
朱合华,张子新,廖少明,等. 地下建筑结构[M]. 2版. 北京:中国建筑工业出版社,2011:234-279.(ZHU Hehua,ZHANG Zixin,LIAO Shaoming,et al. Underground structures[M]. 2nd ed.Beijing:China Architecture andBuilding Press,2011:234-279.(in Chinese))
|
| [12] |
毕湘利,柳献,王秀志,等. 通缝拼装盾构隧道结构极限承载力的足尺试验研究[J]. 土木工程学报,2014,47(10):17.(BI Xiangli,LIU Xian,WANG Xiuzhi,et a1. Experimental investigation on the ultimate bearing capacity ofcontinuous- jointed segmental tunnel linings[J]. China CivilEngineering Journal,2014,47(10):17.(in Chinese))
|
| [13] |
柳献,张晨光,张宸. 地铁盾构隧道纵向接缝承载能力试验研究与解析分析[J].土木工程学报,待刊.(LIU Xian,ZHANG Chenguang,ZHANG Chen. Investigation on the ultimate bearing capacity of longitudinal joints in segmental tunnel lining[J]. China CivilEngineering Journal,in pressed.(in Chinese))
|
| [14] |
王均星,王汉辉,吴雅峰. 土坡稳定的有限元塑性极限分析上限法研究[J]. 岩石力学与工程学报,2004,23(11):1867-1873.(WANG Junxing,WANG Hanhui,WU Yafeng. Stability analysis of soil slope by finite element method with plastic limit upper bound[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(11):1867-1873.(in Chinese))
|
| [15] |
陈志伟,董月亮. MSC Adams多体动力学仿真基础与实例解析[M]. 北京:水利水电出版社,2012:3-70.(CHEN Zhiwei,DONG Yueliang. MSC Adams foundation andanalytical examples of dynamic simulation of multibody[M]. Beijing:China WaterPower Press,2012:3-70.(in Chinese))
|
| [16] |
肖 帕. 结构动力学理论及其在地震工程中的应用[M]. 北京:清华大学出版社,2010:192.(CHOPRA A K. Dynamics of structuretheory and its application in earthquake engineering[M]. Beijing:Tsinghua University Press,2010:192.(in Chinese))
|
| [17] |
李子昌. 特高拱坝应力与整体安全度控制指标研究[硕士学位论文][D].北京:清华大学,2010.(LI Zichang. Study on control criteria of stress andintegrity safety of super-high arch dams[M. S. Thesis][D]. Beijing:Tsinghua University,2010.(in Chinese))
|