[1] 刘 钦. 炭质页岩隧道软弱破碎围岩大变形机理与控制对策及其应用研究[博士学位论文][D]. 济南:山东大学,2011.(LIU Qin. Carbonaceous shale weak broken wall rock tunnel large deformation mechanism and control measures and its application[Ph. D. Thesis][D]. Jinan:Shandong University,2011.(in Chinese))
[2] 李丽民. 大拱脚台阶法在高速铁路浅埋隧道中的应用研究[J]. 工业建筑,2013,43(1):90–93.(LI Limin. Application study on bench method with large arch springing of rapid transit railway shallow buried tunnel[J]. Industrial Construction,2013,43(1):90–93.(in Chinese))
[3] 劳道军. 浅谈软弱围岩隧道台阶法施工中拱脚稳定性及其控制技术[J]. 科技创业月刊,2013,26(9):188–189.(LI Daojun. Discussion the construction of soft surrounding rock tunnel arch foot stability and its control technology[J]. Pioneering With Science and Technology,2013,26(9):188–189.(in Chinese))
[4] 夏润禾,许前顺. 软弱围岩地质大断面铁路隧道大拱脚台阶法施工工法[J]. 铁道标准设计,2010,(增1):108–114.(XIA Runhe,XU Qianshun. Large section tunnel in the soft surrounding rock geological railway arch construction method of block order method[J]. Railway Standard Design,2010,(Supp.1):108–114.(in Chinese))
[5] 李春杰. 大跨度洞室拱顶衬砌拱脚爆破开挖施工技术的研究[J]. 现代隧道技术,2004,41(4):45–50.(LI Chunjie. Study on the blasting techniques for the abutment of the arch lining of large-span underground openings[J]. Modern Tunneling Technology,2004,41(4):45–50.(in Chinese))
[6] 黄胜平. 高速铁路大断面隧道浅埋段软弱围岩施工方法优化研究[J]. 铁道建筑技术, 2012,(6):58–62.(HUANG Shengping. The research on construction method optimization for large-section tunnel in weak surrounding rock of high-speed railway[J]. Railway Construction Technology,2012,(6):58–62.(in Chinese))
[7] 丁华兴. 矿山法地铁隧道大拱脚设计探讨与二次衬砌计算方法的比较[J]. 城市建设理论研究,2011,21:1–5.(DING Huaxing. Mining method metro tunnel arch comparative study and two lining design calculation method of foot[J]. Research on City Construction Theory,2011,21:1–5.(in Chinese))
[8] 李宝平,高诗明,王 睿. 浅埋隧道施工方法的对比分析[J]. 西安工业大学学报,2013,(10):814–817.(LI Baoping,GAO Shiming,WANG Rui. Analysis of shallow tunnel construction methods[J]. Journal of Xi'an Technological University,2013,(10):814–817.(in Chinese))
[9] 黄宏斌. 浅析黄土隧道锁脚锚杆施工技术[J]. 大陆桥视野,2012,(24):120–121.(HUANG Hongbing. Construction technology of anchor pin lock analysis of loess tunnel[J]. Continental Bridge View,2012,(24):120–121.(in Chinese))
[10] 张国辉. 青岛地铁大断面隧道双侧壁和大拱脚施工技术[J]. 山西建筑,2013,39(15):138–140.(ZHANG Guohui. On construction technique of large arch-foot and double side drift method at large cross-section tunnel along Qingdao subway[J]. Shanxi Building,2013,39(15):138–140.(in Chinese))
[11] 李文江,孙明磊,朱永全,等. 软弱围岩隧道台阶法施工中拱脚稳定性及其控制技术[J]. 岩石力学与工程学报,2012,31(增1):2 729–2 737.(LI Wenjiang,SUN Minglei,ZHU Yongquan. Arch spiunging stability and its control techniques during construction of tunnels with weak surrounding rocks by bench cut method[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31 (Supp.1):2 729–2 737. (in Chinese))
[12] 李春清,刘爱贤,冯 鑫,等. 朔黄线软弱围岩隧道施工技术[J]. 铁道建筑,2000,(11):27–28.(LI Chunqing,LIU Aixian,FENG Xin,et al. Shuohuang railway construction technology of soft surrounding rock tunnel[J]. Railway Construction,2000,(11):27–28.(in Chinese))
[13] 黄明琦. 锁脚锚杆作用机理及其在厦门翔安隧道中的应用研究[J].铁道建筑技术,2009,(7):86–89.(HUANG Mingqi. Feet-lock bolt mechanism and its application in Xiamen Xiang¢an Tunnel[J]. Railway Construction Technology,2009,(7):86–89.(in Chinese))
[14] 徐 勇,刘仲仁,王维高,等. 铁路双线软岩隧道控制大变形施工工法比选[J]. 隧道建设,2010,30(2):134–136.(XU Yong,LIU Zhongren,WANG Weigao,et al. Comparison and contrast among different construction methods for double-track railway tunnels in soft ground[J]. Tunnel Construction,2010,30(2):134–136.(in Chinese))
[15] 李崇莲. 围岩隧道台阶法施工中的拱脚控制技术探讨[J]. 科技风,2013,(23):139–140.(LI Chonglian. Discussion on the technology of tunnel surrounding rock arch foot control step method in construction[J]. Technology Wind,2013,(23):139–140.(in Chinese)).
[16] 刘宇峰,徐建华. 水平层状薄层板岩隧道坍塌失稳机理分析及处治[J]. 中外公路,2012,32(4):228–230.(LIU Yufeng,XU Jianhua. Instability mechanism collapsed tunnel in horizontal layered thin slate and treatment[J]. Foreign Highway,2012,32(4):228–230.(in Chinese))
[17] 武建广,刘晓翔,王新文. 碳质板岩地层大断面隧道变形控制施工技术[J]. 现代隧道技术,2011,48(2):68–72.(WU Jianguang,LIU Xiaoxiang,WANG Xinwen. Carbonaceous slate strata deformation control large section tunnel construction technology[J]. Modern Tunnelling Technology,2011,48(2):68–72.(in Chinese))
[18] 许占良,施成华. 长昆客运专线雪峰山地区炭质板岩隧道地层变形规律初探[J]. 铁道勘察,2011,37(6):40–44.(XU Zhanliang,SHI Chenghua. Preliminary Long-kunming passenger line Xuefeng Mountains carbonaceous slate strata deformation of tunnel[J]. Railway Survey,2011,37(6):40–44.(in Chinese))
[19] 左清军. 软质板岩特大断面隧道施工期围岩力学效应研究[博士学位论文][D]. 武汉:中国地质大学,2013.(ZUO Qingjun. Research mechanical effects during construction soft slate King Section Tunnel[Ph. D. Thesis][D]. Wuhan:China University of Geosciences,2013.(in Chinese))