[1] 何明杰,徐建军,徐建荣. 白鹤滩非对称性拱坝体形研究[J]. 水力发电,2011,37(3):32–34.(HE Mingjie,XU Jianjun,XU Jianrong,Study on the shape of Baihetan nonsymmetrical arch dam[J]. Water Power,2011,37(3):32–34.(in Chinese))
[2] 兰仁烈. 拱坝应力分析——有垫座的拱冠梁法[J]. 水电站设计,1997,13(2):35–40.(LAN Renlie. Stress analysis of arch dam with pedestal based on crown cantilever method[J]. Design of Hydroelectric Power Station,1997,13(2):35–40.(in Chinese))
[3] ZHANG L,LIU Y R,YANG Q. Evaluation of reinforcement and analysis of stability of a high-arch dam based on geomechanical model testing[J]. Rock Mechanics and Rock Engineering,2015,48(2):803–818.
[4] 林 鹏,王仁坤,康绳祖,等. 特高拱坝基础破坏、加固与稳定关键问题研究[J]. 岩石力学与工程学报,2011,30(10):1 945–1 958. (LIN Peng,WANG Renkun,KANG Shengzu,et al. Key problems of foundation failure,reinforcement and stability for superhigh arch dams[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(10):1 945–1 958.(in Chinese))
[5] 杨庚鑫,陈建叶,张 林,等. 混凝土传力抗剪结构在拱坝坝肩加固处理中的效果分析[J]. 四川大学学报:工程科学版,2013,45(3):34–39.(YANG Gengxin,CHEN Jianye,ZHANG Lin,et al. Analysis on effect of concrete transmission and shear resistance structure in arch dam abutment reinforcement[J]. Journal of Sichuan University:Engineering Science Edition,2013,45(3):34–39.(in Chinese))
[6] 周维垣,林 鹏,周雅能,等. 高拱坝基础大垫座及周边缝设置研究[J]. 岩石力学与工程学报,2008,27(10):1 959–1 967.(ZHOU Weiyuan,LIN Pen,ZHOU Yaneng,et al. Research on concrete socket and peripheral joint for high arch dam foundation[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(10):1 959–1 967.(in Chinese))
[7] 陈卫忠,朱维申,邱祥波,等. 小湾水电站拱坝坝肩岩体加固方案分析研究. 岩石力学与工程学报,2002,21(3):374–378.(CHEN Weizhong,ZHU Weishen,QIU Xiangbo,et al. Analysis of reinforcement schemes for rock mass of Xiaowan hydropower station arch dam abutments[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(3):374–378.(in Chinese))
[8] 宁 宇,徐卫亚,郑文棠,等. 白鹤滩水电站拱坝及坝肩加固效果分析及整体安全度评价[J]. 岩石力学与工程学报,2008,27(9):1 890–1 898.(NING Yu,XU Weiya,ZHENG Wentang,et al. Reinforcement effect analysis and global safety evaluation of arch dam and abutment of Baihetan hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(9):1 890–1 898.(in Chinese))
[9] 张 肖,张建海,周 钟,等. 锦屏一级高拱坝大垫座稳定性研究[J]. 工程力学,2010,27(增 1):232–235.(ZHANG Xiao,ZHANG Jianhai,ZHOU Zhong,et al. The study of the high arch dam exceptionally large foundation cushion stability of Jingping I hydropower project[J]. Engineering Mechanics,2010,27(Supp.1):232–235.(in Chinese))
[10] 胡著秀,张建海,周 钟,等. 锦屏一级高拱坝坝基加固效果分析[J]. 岩土力学,2010,31(9):2 861–2 868.(HU Zhuxiu,ZHANG Jianhai,ZHOU Zhong,et al. Analysis of stress and deformation of Jinping I high arch dam after foundation reinforcement[J]. Rock and Soil Mechanics,2010,31(9):2 861–2 868.(in Chinese))
[11] LONG Y C,ZHANG C H,XU Y J. Nonlinear seismic analyses of a high gravity dam with and without the presence of reinforcement[J]. Engineering Structures,2009,31(10):2 486–2 494.
[12] 杨 强,薛利军,王仁坤,等. 岩体变形加固理论及非平衡态弹塑性力学[J]. 岩石力学与工程学报,2005,24(20):3 704–3 712. (YANG Qiang,XUE Lijun,WANG Renkun,et al. Reinforcement theory considering deformation mechanism of rock mass and non-equilibriumelasto-plastic mechanics[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(20):3 704–3 712.(in Chinese))
[13] YANG Q,LIU Y R,CHEN Y R,et al. Deformation reinforcement theory and its application to high arch dams[J]. Science in China Series E:Technological Sciences,2008,51(2):32–47.
[14] 任青文. 高拱坝安全性研究现状及存在问题分析[J]. 水利学报,2007,38(9):1 023–1 031.(REN Qingwen. Analysis of the existing situations and problems in safety research of high arch dam[J]. Journal of Hydraulic Engineering,2007,38(9):1 023–1 031.(in Chinese))
[15] SIMO J C,KENNEDY J G,GOVINDJEE S. Non-smooth multisurface plasticity and viscoplasticity,loading/unloading conditions and numerical algorithms[J]. International Journal for Numerical Methods in Engineering,1988,26(10):2 161–2 185.
[16] 杨 强,陈英儒,刘耀儒. 基于变形加固理论的高拱坝坝踵开裂分析[J]. 水利学报,2008,39(1):20–26.(YANG Qiang,CHEN Yingru,LIU Yaoru. Analysis of high arch dam heel cracking on deformation reinforcement theory[J]. Journal of Hydraulic Engineering,2008,39(1):20–26.(in Chinese))