|
|
|
| MODEL TEST RESEARCH OF BASE LAYER COMPRESSION FEATURE IN SUBMARINE IMMERSED TUBE TUNNEL |
| WEI Gang1,WANG Dongdi1,XING Jianjian2,QIU Huijie2,YANG Zefei1 |
(1. Department of Civil Engineering,Zhejiang University City College,Hangzhou,Zhejiang 310015,China;
2. Institute of Geotechnical Engineering,Zhejiang University,Hangzhou,Zhejiang 310058,China) |
|
|
|
|
Abstract Based on the prototype of Zhoushan Shenjiamen Port immersed tube tunnel,a 1∶10 scale shrinkage model test is established in longitudinal of 30 m. The test simulates the uniform distribution construction load through the water load and focuses on the formation process of sand base layer in marine environment to study the compression process and compression modulus Es of four kinds of base layer which is composed by gravel,sand,sand and gravel mixed,sand and gravel mixed with lots of silting,and the difference is compared and analyzed. The results show that,base layer construction settlement is integrally in the linear elastic stage,and the compression modulus Es of four kinds of base layer are respectively 0.67,0.80,3.26,1.85 MPa in average which have a lot to do with the base layer density. Interaction of sand and gravel during the base layer construction will greatly increase the compression modulus,which is about 4.4 times of the mixed condition without interaction in theory. The back-silting can weaken this influence and will greatly decrease the compression modulus.
|
|
|
|
|
|
| [1] GRANTZ W C. Immersed tunnel settlements Part 1:nature of settlements[J]. Tunnelling and Underground Space Technology,2001,16(3):195–201.
[2] 魏 纲,裘慧杰,魏新江. 沉管隧道施工期间与工后长期沉降的数据分析[J]. 岩石力学与工程学报,2013,32(增2):3 413–3 420. (WEI Gang,QIU Huijie,WEI Xinjiang. Analysis of construction and post-construction settlement data caused by immersed tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(Supp.2):3 413–3 420.(in Chinese))
[3] 邵俊江. 沉管隧道的沉降预测及其控制研究[博士学位论文][D]. 上海:同济大学,2003.(SHAO Junjiang. Study on prediction and control for settlements of immersed tunnel[Ph. D. Thesis][D]. Shanghai:Tongji University,2003.(in Chinese))
[4] 陈韶章,陈 越,张 弥. 沉管隧道设计与施工[M]. 北京:科学出版社,2002:111–118.(CHEN Shaozhang,CHEN Yue,ZHANG Mi. Immersed tube tunnel design and construction[M]. Beijing:Science Press,2002:111–118.(in Chinese))
[5] 蒙庆辉,刘吉福,赵永伦. 沉管法隧道纵向变形浅议[J]. 地下工程与隧道,2001,(3):12–15.(MENG Qinghui,LIU Jifu,ZHAO Yonglun. Elementary discussion on the longitudinal deformation of immersed tunnel[J]. Underground Engineering and Tunnels,2001,(3):12–15.(in Chinese))
[6] 黎志均. 珠江隧道工程基础灌砂模型试验[J]. 华南港工,1996,(1):49–52.(LI Zhijun. Model test of sand filled foundation for under water tunnel crossing pearl river[J]. South China Harbor Engineering,1996,(1):49–52.(in Chinese))
[7] 黎志均. 珠江隧道工程基础灌砂试验研究[J]. 中国港湾建设,2001,(1):18–20.(LI Zhijun. Study and research of sand filled foundation for underwater tunnel crossing pearl river[J]. China Harbor Engineering,2001,(1):18–20.(in Chinese))
[8] 王光辉,李治国,程晓明,等. 生物岛—大学城沉管隧道灌砂试验及结果分析[J]. 隧道建设,2009,(2):176–180.(WANG Guanghui,LI Zhiguo,CHENG Xiaoming,et al. Sand flowing experiment and experiment result analysis:case study on Shengwudao—Daxuecheng immersed tunnel[J]. Tunnel Construction,2009,(2):176–180.(in Chinese))
[9] 潘永仁,彭 俊,NAOTAKE Saito. 上海外环沉管隧道管段基础压砂法施工技术[J]. 现代隧道技术,2004,41(1):41–45.(PAN Yongren,PENG Jun,NAOTAKE Saito. Technology of sand injection for the foundation of immersed tube elements on the external ring of Shanghai[J]. Modern Tunnelling Technology,2004,41(1):41–45.(in Chinese))
[10] 郭东韡,郑万坤. 港珠澳大桥沉管隧道沉降分析研究[J]. 山西建筑,2012,38(16):212–214.(GUO Donghua,ZHENG Wankun. Settlement analysis research on immersed tunnel of Hong Kong—Zhuhai—Macao Bridge[J]. Shanxi Architecture,2012,38(16):212–214.(in Chinese))
[11] 郑爱元,谭忠盛,李治国. 沉管隧道基础灌砂模拟试验[J]. 中国工程科学,2009,(7):81–85.(ZHENG Aiyuan,TAN Zhongsheng,LI Zhiguo. Simulation experiment of pumped sand on immersed tunnel[J]. Engineering Science,2009,(7):81–85.(in Chinese))
[12] 吴鸿军,李治国,程晓明. 沉管隧道基础灌砂模拟试验[J]. 西部探矿工程,2009,(6):155–157.(WU Hongjun,LI Zhiguo,CHENG Xiaoming. Simulation experiment of pumped sand on immersed tunnel[J]. West-China Exploration Engineering,2009,(6):155–157. (in Chinese))
[13] 袁伟耀. 变截面沉管隧道基础处理物理模拟试验研究[硕士学位论文][D]. 广州:华南理工大学,2010.(YUAN Weiyao. Research on variational section immersed tunnel foundation treatment model experiment[M. S. Thesis][D]. Guangzhou:South China University of Technology,2010.(in Chinese))
[14] 莫海鸿,黎 伟,房营光,等. 沉管隧道底板面材质对砂流法地基影响的模型试验研究[J]. 岩石力学与工程学报,2012,31(7):1 452–1 461.(MO Haihong,LI Wei,FANG Yingguang,et al. Model experimental research on effect of material of immersed tunnel bottom surface on foundation formed by sand flow method[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(7):1 452–1 461.(in Chinese))
[15] 房营光,黎 伟,莫海鸿,等. 沉管隧道地基砂流法处理的砂盘扩展规律试验与分析[J]. 岩石力学与工程学报,2012,31(1):206–216.(FANG Yingguang,LI Wei,MO Haihong,et al. Experiment and analysis of law of sand deposit expansion in foundation of immersed tube tunnel treated by sand flow method[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(1):206–216.(in Chinese))
[16] 沈永芳. 沉管隧道基础注浆效果等比例模型试验研究[硕士学位论文][D]. 上海:上海交通大学,2012.(SHENG Yongfang. Research on the same scale model test and evaluation of foundation grouting effect in the immersed tube tunnel[M. S. Thesis][D]. Shanghai:Shanghai Jiaotong University,2012.(in Chinese))
[17] 宋光猛. 沉管隧道基础注浆效果模型试验研究[硕士学位论文][D]. 上海:上海交通大学,2012.(SONG Guangmeng. Research on the model test and evaluation of foundation grouting effect in the immersed tube tunnel[M. S. Thesis][D]. Shanghai:Shanghai Jiaotong University,2012.(in Chinese))
[18] 宁茂权. 沈家门港海底沉管隧道设计介绍[J]. 现代隧道技术,2008,45(6):61–69.(NING Maoquan. Design of Shenjiamengang undersea immersed tube tunnel[J]. Modern Tunnelling Technology,2008,45(6):61–69.(in Chinese))
[19] 魏 纲,裘慧杰,杨泽飞,等. 考虑回淤的沉管隧道基础层压缩模型试验研究[J]. 岩土工程学报,2014,36(8):1 544–1 552.(WEI Gang,QIU Huijie,YANG Zefei,et al. Model tests on compression of base layer of immersed tube tunnels considering siltation[J]. Chinese Journal of Geotechnical Engineering,2014,36(8):1 544–1 552.(in Chinese)) |
|
|
|