| STUDY ON STABILITY OF CLOSE CROSS TUNNEL
ON EXISTING TUNNEL |
| CHEN Weizhong1,2,ZHENG Dong3,YU Jianxin4,LI Ming1,YUAN Jingqiang1,LIU Huanchun4,TIAN Hongming1 |
| (1. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan,Hubei 430071,China;2. Research Center of Geotechnical and Structural Engineering,Shandong University,Jinan,Shandong 250061,China;3. Second Highway Consultants Co.,Ltd.,China Communications Construction Corporation,Wuhan,Hubei 430056,China;4. School of Civil Engineering,Henan Polytechnic University,Jiaozuo,Henan 454003,China) |
|
|
|
|
Abstract More and more cross tunnels are facing complicated geological conditions and significant disturbance of surrounding rock,and it is quite necessity to research reasonable construction methods for tunnels. Based on the project of Zoumagang highway tunnel passing through upon Guangdong Yuegang water supply tunnel. Firstly,the construction method was numerically simulated for safety and construction sequences have been suggested according to vibrate speed control criterion for DWSS tunnel. Meanwhile,the ground pressure of surrounding rockmass of primary tunnel support and section convergence of existing tunnel were monitored. The field measurements show that at the intersection of two tunnels,the surrounding rock pressures of excavating tunnel achieved stability in 10 days basically. And the maximum ground pressure was 0.2 MPa and appeared at the hance of the tunnel and then decreased to a stable value slowly. The convergence and concrete strain of the water supply tunnel were relatively little. The research results showed that this construction method was safe and reliable. The achievements from the research work will benefit work can provide reference for similar projects.
|
|
|
|
|
|
| [1] 陈卫军,朱忠隆. 近距离交叠隧道研究现状及评析[J]. 现代隧道技术,2002,39(1):42–47.(CHEN Weijun,ZHU Zhonglong. A review on the technology used in closely overlapped tunnels[J]. Modern Tunnelling Technology,2002,39(1):42–47.(in Chinese))
[2] 刘金朋. 复杂交叉隧道开挖的相关力学特性研究[硕士学位论文][D]. 重庆:重庆大学,2008.(LIU Jinpeng. Study on the excavation- mechanical characteristics of complicated intersecting tunnels[M. S. Thesis][D]. Chongqing:Chongqing University,2008.(in Chinese))
[3] 张玉军,刘谊平. 上下行隧道立交处围岩稳定性的有限元计算[J]. 岩土力学,2002,23(4):511–515.(ZHANG Yujun,LIU Yiping. 3D finite element analysis for stability of surrounding rockmass at grade separation section of up tunnel and down tunnel[J]. Rock and Soil Mechanics,2002,23(4):511–515.(in Chinese))
[4] 仇文革. 地下工程近接施工力学原理与对策的研究[博士学位论文][D]. 成都:西南交通大学,2003.(QIU Wenge. The study on mechanics principle and countermeasure of approaching excavation in underground works[Ph. D. Thesis][D]. Chengdu:Southwest Jiaotong University,2003.(in Chinese))
[5] 龚 伦,仇文革. 既有铁路隧道受下穿引水隧洞近接施工影响预测[J]. 中国铁道科学,2007,28(4):29–33.(GONG Lun. QIU Wenge. Closely constructing influence forecast of hydraulic tunnel under-cross existing railway tunnel[J]. China Railway Science,2007,28(4):29–33.(in Chinese))
[6] 龚 伦. 上下交叉隧道近接施工力学原理及对策研究[博士学位论文][D]. 成都:西南交通大学,2008.(GONG Lun. Study on mechanics principle and countermeasures of adjacent excavation in up-down cross tunnels[Ph. D. Thesis][D]. Chengdu:Southwest Jiaotong University,2008.(in Chinese))
[7] 赵旭峰,王春苗,孙景林,等. 盾构近接隧道施工力学行为分析[J]. 岩土力学,2007,28(2):409–414.(ZHAO Xufeng,WANG Chunmiao,SUN Jinglin,et al. Analysis of mechanical action of shield driving for approaching excavation[J]. Rock and Soil Mechanics,2007,28(2):409–414.(in Chinese))
[8] 张国华,陈礼彪,钱师雄,等. 大断面小净距大帽山隧道现场监控量测及分析[J]. 岩土力学,2010,31(2):489–496.(ZHANG Guohua,CHEN Libiao,QIAN Shixiong,et al. On-site supervision measure and analysis of Damaoshan tunnels with large section and small clear-distance[J]. Rock and Soil Mechanics,2010,31(2):489–496. (in Chinese))
[9] 刘辉喜,刘明高,黄始南,等. 交叉隧道近接施工安全的数值分析研究[J]. 中外公路,2011,(3):221–224.(LIU Huixi,LIU Minggao,HUANG Shinan,et al. The study of numerical analysis of adjacent construction safety for cross tunnels[J]. Journal of China and Foreign Highway,2011,(3):221–224. (in Chinese))
[10] 吴占瑞,漆泰岳. 跨线风道近接施工力学特性研究[J]. 铁道标准设计,2012,(4):99–103.(WU Zhanrui,QI Taiyue. Mechanical behaviors of adjacent construction of air duct through subsea tunnel[J]. Railway Standard Design,2012,(4):99–103.(in Chinese))
[11] 杜立兵,严松宏,蔡白洁. 小净距空间交叉隧道台阶法施工安全性研究[J]. 隧道建设,2013,33(5):378–382.(DU Libing,YAN Songhong,CAI Baijie. Study on safety of small-spaced intersecting tunnels constructed by bench-cut method[J]. Tunnel Construction,2013,33(5):378–382.(in Chinese))
[12] 刘志强,王 斌,邢晓飞. 成渝客专新中梁山隧道上穿施工对既有襄渝铁路中梁山隧道的影响分析[J]. 隧道建设,2013,33(5):373–377.(LIU Zhiqiang,WANG Bin,XING Xiaofei. Analysis on influence on existing Zhongliangshan tunnel on Xiangyang-Chongqing railway imposed by construction of above-crossing new Zhongliangshan tunnel on Chengdu-Chongqing passenger-dedicated railway[J]. Tunnel Construction,2013,33(5):373–377.(in Chinese))
[13] 郭陕云. 隧道掘进钻爆法施工技术的进步和发展[J]. 铁道工程学报,2007,(9):67–74.(GUO Xiayun. Progresses and developments of tunnel construction technology with bored blast method[J]. Journal of Railway Engineering Society,2007,(9):67–74.(in Chinese))
[14] 中华人民共和国国家标准编写组. GB6722—2003爆破安全规程[S]. 北京:中国标准出版社,2003.(The National Standards Compilation Group of People?s Republic of China. GB6722—2003 Safety regulations for blasting[S]. Beijing:Standards Press of China,2003.(in Chinese))
[15] 白海山. 东深供水改造工程走马岗隧洞围岩分类[J]. 西部探矿工程,2001,(4):82–83.(BAI Haishan. Surrounding rock classification of Zoumagang tunnel of East river-Shenzhen water supply reconstructing project[J]. West-China Exploration Engineering,2001,(4):82–83.(in Chinese))
[16] 中华人民共和国国家标准编写组. GB50218—94工程岩体分级标准[S]. 北京:中国计划出版社,1995.(The National Standards Compilation Group of People?s Republic of China. GB50218—94 Standard for engineering classification of rock masses[S]. Beijing:China Planning Press,1995.(in Chinese))
[17] 中华人民共和国国家标准编写组. GB50287—2008水利水电工程地质勘察规范[S]. 北京:中国计划出版社,2008.(The National Standards Compilation Group of People?s Republic of China. GB50287—2008 Code for water resources and hydropower engineering geological investigation[S]. Beijing:China Planning Press,2008.(in Chinese))
[18] 李元松,李新平,代翼飞,等. 隧道围岩与衬砌受力特性测试与数值分析[J]. 岩土力学,2007,28(7):1 348–1 352.(LI Yuansong,LI Xinping,DAI Yifei,et al. Mechanical property testing and numerical calculating on surrounding rock mass and support system of tunnel[J]. Rock and Soil Mechanics,2007,28(7):1 348–1 352.(in Chinese))
[19] 王衍森,杨维好,黄家会,等. 龙固副井冻结凿井期外壁混凝土应变的实测研究[J]. 煤炭学报,2006,31(3):296–300.(WANG Yansen,YANG Weihao,HUANG Jiahui,et al. Study of freeze sinking period concrete strain of outer shaft wall of Longgu Coal Mine auxiliary shaft[J]. Journal of China Coal Society,2006,31(3):296–300.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|