|
|
|
| Asymmetric failure and control measures of large cross-section entry roof with strong mining disturbance and fully-mechanized caving mining |
| ZHANG Guangchao,HE Fulian |
| (College of Resources and Safety Engineering,China University of Mining and Technology,Beijing 100083,China) |
|
|
|
|
Abstract Asymmetric deformation failure during the process of excavating and supporting of large cross-section entry roof with strong mining disturbance and fully-mechanized caving mining at Wangjialing coal mine was studied systematically through field investigation,laboratory test,analytical analysis,numerical simulation and in-sit test. The mechanism of deformation failure and the controlling measures were investigated. The roof of gob-side entry was found to display the asymmetric deformation failure characteristics,which included sever subsidence of roof near the pillar sides,radical horizontal dislocation deformation and dislocation,embedding,step convergence at the roof-wall corner,et al. The lateral main roof broke at a distance of 6–7 m away from the gob-edge above the pillar. Unbalanced side abutment q and rotary deformation pressure ? induced by the broken and rotation of main roof are the fundamental cause causing the asymmetric deformation failure characteristics. The deformation failure was significantly influenced by a key position of roof near the pillar side and roof-wall corner surrounding rocks. Due to the movement of the unstable overlying strata and the entry excavation,the surrounding rock structure and stress distribution were asymmetric evidently on the axis of roadway,but the original supporting systems did not provide the reinforced support to key position and adjust to the strongly horizontal dislocation,which resulted in the asymmetric strata behaviors shortly after the development of entry. The asymmetric failure tended to be more severe later affected by the extraction of the present panel. The control principle of the entry was analyzed and an asymmetric supporting system was proposed composed of cable- beam-net,asymmetric cable-beam and cable-truss. And the support scheme was put into field application. The numerical simulations and engineering applications demonstrated that the support weakened the asymmetric of stress and displacement of the roof and controlled the asymmetric deformation failure.
|
|
|
|
|
|
| [1] 王金华. 特厚煤层大采高综放开采关键技术[J]. 煤炭学报,2013,38(12):2 089–2 098.(WANG Jinhua. Key technology for fully- mechanized top coal caving with large mining height in extra-thick coal seam[J]. Journal of China Coal Society,2013,38(12):2 089– 2 098.(in Chinese))
[2] 彭林军,张东峰,郭志飚,等. 特厚煤层小煤柱沿空掘巷数值分析及应用[J]. 岩土力学,2013,34(2):3 609–3 617.(PENG Linjun,ZHANG Dongfeng,GUO Zhibiao,et al. Numerical analysis of thick coal seam small pillar along gob roadway and its application[J]. Rock and Soil Mechanics,2013,34(2):3 609–3 617.(in Chinese))
[3] 侯朝炯,李学华. 综放沿空掘巷围岩大、小结构的稳定性原理[J]. 煤炭学报,2001,26(1):1–7.(HOU Chaojiong,LI Xuehua. Stability principle of big and small structures of rock surrounding roadway driven along goaf in fully mechanized top coal caving face[J]. Journal of China Coal Society,2001,26(1):1–7.(in Chinese))
[4] 柏建彪,侯朝炯,黄汉富. 沿空掘巷窄煤柱稳定性数值模拟研究[J]. 岩石力学与工程学报,2004,23(20):3 475–3 479.(BAI Jianbiao,HOU Chaojiong,HUANG Hanfu. Numerical simulation study on stability of narrow coal pillar of roadway driving along goaf[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(20):3 475–3 479.(in Chinese))
[5] 张 源,万志军,李付臣,等. 不稳定覆岩下沿空掘巷围岩大变形机理[J]. 采矿与安全工程学报,2012,29(4):451–458.(ZHANG Yuan,WAN Zhijun,LI Fuchen,et al. Large deformation mechanism of roadway driving along goaf under unstable overlying rock strata[J]. Journal of Mining and Safety Engineering,2012,29(4):451–458.(in Chinese))
[6] 郑西贵,姚志刚,张 农. 掘采全过程沿空掘巷小煤柱应力分布研究[J]. 采矿与安全工程学报,2012,29(4):459–465.(ZHENG Xigui,YAO Zhigang,ZHANG Nong. Stress distribution of coal pillar with gob-side entry driving in the process of excavation and mining[J]. Journal of Mining and Safety Engineering,2012,29(4):459–465.(in Chinese))
[7] 谢广祥,杨 科,刘全明. 综放面倾向煤柱支承压力分布规律研究[J]. 岩石力学与工程学报,2006,25(3):545–549.(XIE Guangxiang,YANG Ke,LIU Quanming. Study on distribution laws of stress in inclined coal pillar for fully-mechanized top-coal caving face[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(3):545–549.(in Chinese))
[8] 成云海,姜福兴,庞继禄. 特厚煤层综放开采采空区侧向矿压特征及应用[J]. 煤炭学报,2012,37(7):1 088–1 093.(CHENG Yunhai,JIANG Fuxing,PANG Jilu. Research on lateral strata pressure characteristic in goaf of top coal caving in extra thick coal seam and its application[J]. Journal of China Coal Society,2012,37(7):1 088– 1 093.(in Chinese))
[9] 王德超,李术才,王 琦,等. 深部厚煤层综放沿空掘巷煤柱合理宽度试验研究[J]. 岩石力学与工程学报,2014,33(3):539–548. (WANG Dechao,LI Shucai,WANG Qi,et al. Experimental study of reasonable coal pillar width in fully mechanized top coal caving face of thick coal seam[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(3):539–548.(in Chinese))
[10] 许家林,鞠金峰. 特大采高综采面关键层结构形态及其对矿压显现的影响[J]. 岩石力学与工程学报,2011,30(8):1 547–1 556.(XU Jialin,JU Jinfeng. Structural morphology of key strata and its influence on strata behavior in fully-mechanized face with super great mining height[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(8):1 547–1 556.(in Chinese))
[11] 侯朝炯,马念杰. 煤层巷道两帮煤体应力和极限平衡区的探讨[J]. 煤炭学报,1989,14(4):23–31.(HOU Chaojiong,MA Nianjie. Coal stress and limit equilibrium zone study on two sides of coal roadway[J]. Journal of China Coal Society,1989,14(4):23–31.(in Chinese))
[12] 严 红,何富连,王思贵. 特大断面巷道软弱厚煤层顶板控制对策及安全评价[J]. 岩石力学与工程学报,2014,33(5):1 014–1 023. (YAN Hong,HE Fulian,WANG Sigui. Safety control and evaluation of roadway with super-large cross-section and soft-weak thick coal roof[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(5):1 014–1 023.(in Chinese))
[13] 康 荣,何富连,李宏彬. 桁架锚索在碎裂顶板巷道支护中的应用[J]. 煤炭科学技术,2010,38(5):28–33.(KANG Rong,HE Fulian,LI Hongbin. Application of truss and anchor to support seam gateway with broken roof[J]. Coal Science and Technology,2010,38(5):28–33.(in Chinese))
[14] 苏学贵,宋选民,李浩春,等. 特厚松软复合顶板巷道拱–梁耦合支护结构的构建及应用研究[J]. 岩石力学与工程学报,2014,33(9):1 828–1 836.(SU Xuegui,SONG Xuanmin,LI Haochun,et al. Study on coupled arch-beam support structure of roadway with extra-thick soft compound roof[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(9):1 828–1 836.(in Chinese))
[15] 吴德义,申法健. 巷道复合顶板层间离层稳定性量化判据选择[J]. 岩石力学与工程学报,2014,33(10):2 040–2 046.(WU Deyi,SHEN Fajian. Quantitative criteria of interlayer separation stability of complex roof in tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(10):2 040–2 046.(in Chinese)) |
| [1] |
LI Botao1, 2, 3, TAN Yuxuan1, LIN Haifei4, 5*, WEI Jianping1, 2, 3, ZHANG Hongtu1, 2, 3, LI Shugang4, 5, WEI Zongyong4, 5, WANG Pei4, LUO Rongwei4, LIU Yanwei1, 2, 3. Mechanical properties and mesoscopic damage evolution of coal under liquid-nitrogen freezing at different initial temperatures[J]. , 2026, 45(6): 1757-1772. |
|
|
|
|