Abstract 36 sets of orthogonal model tests on the ultimate bearing capacity of the pre-support system of tunnels with pipe roof in soft surrounding rock were carried out. The pre-supporting system with pipe roof was found to effectively prevent the collapse when cross-cover ratio H/D = 1. The 120° arrangement of pipe shed advanced support reduced 59.5%(H/D = 2) and 64.8%(H/D = 3) of the maximum surface settlement. The 150° arranged pipe roof reduced 63.2%(H/D = 2) and 76.8%(H/D = 3) surface maximum settlement. The recommended range of width parameter K of Peck formula was given by fitting the experimental data. K increased with the density of pipe roof,and increased about 0.13 in 120° pipe arrangement,about 0.19 in 150° pipe arrangement. The limit bearing capacity of supported surrounding rocks was approximately doubled in the ultimate load tests,and the destruction form was changed from the dome collapse into the sidewall squeezing in the process of the tunneling and loading.
GUO Xuan1,ZHANG Hongru1,MENG Jiao1, et al. Model test to earth pressure distribution on pipe roof of tunnels#br# as pre-supporting system in weak surrounding rock[J]. , 2016, 35(6): 1214-1224.
李 健,谭忠盛,喻 渝,等. 浅埋下穿高速公路黄土隧道管棚变形监测及受力机制分析[J]. 岩石力学与工程学报,2011,30(增1):3 002-3 008.(LI Jian,TAN Zhongsheng,YU Yu,et al. Analysis of deformation monitoring and mechanical behaviors of big pipe-roof for shallow-buried large-span tunnel to underpass highway[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(Supp.1): 3 002-3 008.(in Chinese))
Your browse does not support frame!